Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹2,462.82 (0.51%)Admitted-Finance | ₹4.9 L+₹2,462.82 (0.51%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Baby Enterprises L2 | Ms P Yapang Enterprise L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 58.27 | Cum | 134.68 ₹7,847.8 | 134 ₹7,808.18 Lowest |
| 2.00 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 12.41 | Cum | 4,168.71 ₹51,733.69 | 4,147.55 ₹51,471.1 Lowest |
| 3.00 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | 11.65 | Cum | 5,165.22 ₹60,174.81 | 5,139.01 ₹59,869.47 Lowest |
| 4.00 | Providing approved best available local wood (Class - B II) work in frames Ceiling portion and trusses etc,sawn and put up in possition | 21.03 | Sqm | 475.75 ₹10,005.02 | 473.34 ₹9,954.34 Lowest |
| 5.00 | Single wattle or split bamboo walling including fitting, fixing complete (without plaster). | 102 | Sqm | 136.24 ₹13,896.48 | 135.54 ₹13,825.08 Lowest |
| 6.00 | Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including necessary iron butt hinges with necessary screws. | 4.38 | Sqm | 2,707.69 ₹11,859.68 | 2,693.94 ₹11,799.46 Lowest |
| 7.00 | Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses. | 340.48 | Cum | 941.94 ₹3,20,711.73 | 937.16 ₹3,19,084.24 Lowest |
| 8.00 | Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete. | 15.2 | Cum | 588.89 ₹8,951.13 | 585.9 ₹8,905.68 Lowest |
Tender Value
Refer Docs
EMD Value
₹93,575
Closing Date
6 Jul 2026, 10:00 amClosed
Deputy Director
O/o DEPUTY DIRECTOR (RD), Rural Development Department, Koloriang.
Establishment of Model village at Kush village Koloriang, Kurung Kumey District.
2026_DRDAP_3481_1
RDD/KKD//NIT/2025 -26/KUSH
Open Tender
Civil Works
Item Rate
Koloriang
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
DD, RD, Kurung Kumey District
₹93,575
15 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 58.27 | Cum | - | - |
| 2 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 12.41 | Cum | - | - |
| 3 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | 11.65 | Cum | - | - |
| 4 | Providing approved best available local wood (Class - B II) work in frames Ceiling portion and trusses etc,sawn and put up in possition | 21.03 | Sqm | - | - |
| 5 | Single wattle or split bamboo walling including fitting, fixing complete (without plaster). | 102 | Sqm | - | - |
| 6 | Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including necessary iron butt hinges with necessary screws. | 4.38 | Sqm | - | - |
| 7 | Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses. | 340.48 | Cum | - | - |
| 8 | Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete. | 15.2 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tender_Documents.pdf
Tender Documents • 16.50 MB
BOQ_3685.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .