Tender ID
Tender Value
₹565.8 Cr
EMD Value
₹2 Cr
Closing Date
15 May 2026, 3:00 pmClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 5% of Estimated Project Cost at the close of the preceding Financial Year. (Refer clause No. 2.2.2.2 of RFP).
The Bidder shall have the Technical Capacity and Experience as mentioned in Clause No. 2.2.2.1, 2.2.2.3 to 2.2.2.9 of the RFP.
29 conditions · 12 needing a document upload
ANNEXURE I TO APPENDIX IA-(DETAILS OF BIDDER) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) Clause 2.1.4, 2.11 and 3.1.6 of RFP.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID) (Para 2.1.4, 2.11 and 3.1.6 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) Clause No. 2.1.5 of RFP.
ANNEXURE II TO APPENDIX IA(TECHNICAL CAPACITY OF THE BIDDER): Refer CLAUSE 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
APPENDIX III- Format for power of attorney for lead member of Consortium/Joint venture CLAUSE 2.1.6 of RFP.
ANNEXURE III TO APPENDIX IA- (FINANCIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINT VENTURE) Clause 2.1.11 of RFP.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS) Refer Clause 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY).
ANNEXURE-VII (BID SECURITY)/EMD (REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e-payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Annexure-VII].
ANNEXURE VI TO APPENDIX IA-(Guidelines of the Department of Disinvestment) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
Department of Expenditure, Ministry of Finance, Government of India letter F.No.6/18/2019-PPD dated:23/07/2020 shall be referred. The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid along with Annexure-VII.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
South Central Railway (Construction Organization)- Engineering, Procurement and Construction (EPC) Contract for (A) Construction of Important bridge No.:57 of size 53x61.0m (minimum clear span) over river Krishna with standard RDSO Open Web Girder superstructure (for single line) for 25t axle loading with Well foundation (Foundation, Sub-Structure including Bed Blocks for Two Tracks) including protection works, Track works, over Open Web Girder portion and, (B) Construction of Station building, CPM Camp Office, Platform Works, Approach Track works etc. at Kothapalli halt station and Earth Work in formation for a length of 1033mts on Errupalem end & 534m on Namburu End of Important bridge including construction of Minor and Major Bridges between Amaravati and Paritala stations in connection with Errupalem -Nambur (Via Amaravati) New BG Line in Guntur Division of South Central Railway" of Andhra Pradesh state.
EPC-06-CAO-C-SC-2026
EPC-06-CAO-C-SC-2026
Open
Works - General
33 Months
Unknown (Unspecified Location)
₹0
₹2 Cr
10 Mar 2026
10 Mar 2026
1 May 2026
3 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,65,83,62,681 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Guidelines_TypeofFoundation_BS-127R1.pdf
ATTACHMENT
18.30mwith5150deckwidthB-10273158-2020_1.pdf
ATTACHMENT
7.0mCOPRDSODrawings10531to10534.pdf
ATTACHMENT
9.15mPSCSlabPostTen_10272R.PDF
ATTACHMENT
12.20mPSCSlab_10271R_10271-1R_compressed.pdf
ATTACHMENT
18.30mPSCGirder_10273SERIES_compressed.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
17182-1_StressSheet.pdf
ATTACHMENT
17182-2_Camber.pdf
ATTACHMENT
17182-3_Bearing.pdf
ATTACHMENT
17182-4-R_BottomChord.pdf
ATTACHMENT
LowlevelShelteroverPassengersbenchesonPlatformofWayside-RDSO-B-1758.pdf
ATTACHMENT
Policycircular22.12.2021.pdf
ATTACHMENT
ProvisionofTransitionSystem-RDSOlr.mo.GEGEN112-TranitionVol-IIIDt19-05-20251.pdf
ATTACHMENT
17182-5-R_TopChord_compressed.pdf
ATTACHMENT
17182-6-R_EndRakerPortalBracings_compressed.pdf
ATTACHMENT
17182-7_Verticals.pdf
ATTACHMENT
17182-8-R_Diagonals.pdf
ATTACHMENT
17182-9-1R_BottomChordJoints_compressed.pdf
ATTACHMENT
17182-9-2_BottomChordJoints.pdf
ATTACHMENT
17182-9-3_BottomChordJoints.pdf
ATTACHMENT
17182-10-1_TopChordJoints.pdf
ATTACHMENT
17182-10-2_TopChordJoints.pdf
ATTACHMENT
17182-11_CrossGirder_compressed.pdf
ATTACHMENT
17182-12-1R_Stringers.pdf
ATTACHMENT
17182-12-2_StringeratExpansionJoints.pdf
ATTACHMENT
17182-13_SwayBracings.pdf
ATTACHMENT
17182-14_BottomLateralBracings.pdf
ATTACHMENT
17182-15_TopLateralBracings.pdf
ATTACHMENT
17182-16_Erectiondrawing.pdf
ATTACHMENT
17182-17_ShippingList.pdf
ATTACHMENT
17182-R_GeneralArrangement_compressed.pdf
ATTACHMENT
AssemblyofOuterGuardRail_RerailingRamp_RDSO_T_8260TO8263.pdf
ATTACHMENT
ATWeld_Manual-2022.pdf
ATTACHMENT
BRfor9.1512.20mPSCslab.pdf
ATTACHMENT
BS-128R31.pdf
ATTACHMENT
CBS-0045_PATHWAYIMPBRIDGE_compressed.pdf
ATTACHMENT
Concretebridgecode.pdf
ATTACHMENT
KothapalliHaltESPYP-NBR_V3_APPROVE.pdf
ATTACHMENT
IRSOD_INCORPORATED_New.pdf
ATTACHMENT
INSPPLATFORMBEARING_CBS0016.pdf
ATTACHMENT
IMPBRIDGETENTATIVEGAD.pdf
ATTACHMENT
HighLevelPFwalldrg70-2022.pdf
ATTACHMENT
HighLevelPFVDCFlooring71_2022.pdf
ATTACHMENT
H-BeamSleepersRDSO-B-1636-4-R_compressed.pdf
ATTACHMENT
HALTSTATIONBUILDINGGAD.pdf
ATTACHMENT
HshapeFPforallPSCslabs148-2020.pdf
ATTACHMENT
Guidelines_TypeofFoundation_BS-127R1_1.pdf
ATTACHMENT
GuidelinesonRSIAnalysis_BS-114.pdf
ATTACHMENT
FoundationSubstructureCode.pdf
ATTACHMENT
FlashbuttweldingManual-Reprint2022-IncorporateduptoCS4.pdf
ATTACHMENT
FabricationandErectionofSteelgirder_IRS_B1_updateduptoACS-13_compressed.pdf
ATTACHMENT
Divyangjanfacilitiesprovision_11_2023.pdf
ATTACHMENT
DBRPreparation_BS-122R1.pdf
ATTACHMENT
CPMCAMPOFFICEDrawing.pdf
ATTACHMENT
MJB_Ch-25039.311X18.30mPSCGB_Canal.pdf
ATTACHMENT
MJB_Ch-29241.831x12.20mPSCSlab.pdf
ATTACHMENT
MJB.No_Ch-29712.021X18.30mPSCGB.pdf
ATTACHMENT
LowHeightH-BeamSleepersonCrossGirders.pdf
ATTACHMENT
OuterGuardRail_RerailingRamp_RDSO_T_8259.pdf
ATTACHMENT
PileWellfoundation_ManualUpdatedason20.5.16.pdf
ATTACHMENT
Platformcompundwall.pdf
ATTACHMENT
QAQCLABDrawing.pdf
ATTACHMENT
RCCBOX_25t_SingleLine_10152-Rseries_compressed_1.pdf
ATTACHMENT
SEJSleepersonGirderBridgeRDSO-B-1636-9_compressed.pdf
ATTACHMENT
SEJSleepersonOWG.pdf
ATTACHMENT
SEJSleepersonOWG_INVENTORY.pdf
ATTACHMENT
SpecificationsforTrackBallastuptoACS-1.pdf
ATTACHMENT
TWSwitch_SEJRDSO_T_8822_ALT_4.pdf
ATTACHMENT
TypicalPlanforTrolleyRefugeForBankingandCutting.pdf
ATTACHMENT
WATERRESOURCEDEPARTMENTLetter.pdf
ATTACHMENT
ZeroToeLoadFixuresRDSO_T_8759ToRDSO_T_8765_ALT_NIL.pdf
ATTACHMENT
RerailingRampRT-8265to8285.pdf
ATTACHMENT
PreBidConferenceLinkDetails.pdf
ATTACHMENT
WorkingPlanSection_25-30_Signed_1.pdf
ATTACHMENT
WorkingPlanSection_20-26_Signed.pdf
ATTACHMENT
EPCDocument_ImpBridgeoverKrishnaRiver__Final09.03.2026.pdf
ATTACHMENT
RFPImpBridgeoverKrishnaRiverFinal09.03.2026_1.pdf
ATTACHMENT
SITEOFFICEPLAN.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .