Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
27 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
14 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V=Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria: Given in Special Condition of Contract. (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, o r (iii) One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b)(i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(i): Separate completed works of minimum required values for each component shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Definition of similar nature of work is "Design, Supply, Erection, Testing, Commissioning / Augmentation of EHV equipment of Electrical Sub Station of voltage level 66kV or above. O R Design, Supply, Erection, Testing, Commissioning of switching station (SSP / SP / FP) of 1 X25 kV / 2X25 kV system on Indian railways / DFCC/ Metro Rail / Port railway".
12 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please submit bank details of the firm / individual/ JV / partnership etc. i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number and other necessary & relevant documents.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It is the responsibility of the tenderer to see corrigendum, if any, to tender notice up to the date of tender opening. IRGCC-2022 (works matter) is for reference only. Any correction issued by competent authority up to date of opening will be applicable. Tenderer should quote accordingly.
The work will be executed under supervision of Railway Engineer in-charge or his authorized representative at site.
The schedule of quantity is only approximate and may vary as per site condition. Any items may be added or deleted as directed by Engineer-in-charge to complete the work in all respect.
Contractor will issue identity cards to all his supervisors/laborers working at site as per Proforma given by Railway.
Design, Supply, Erection, Testing and Commissioning of left over work at 132 kV, Switching Station at Bhadan under jurisdiction of Dy.CEE/PU/CNB.
DyCEE-PU-CNB-26-27-T-02
DyCEE-PU-CNB-26-27-T-02
Open
Works - General
6 Months
Prayagraj, Uttar Pradesh
₹0
₹3.2 L
27 May 2026
5 May 2026
13 May 2026
48 items across 2 schedules · ₹76,57,619.23 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Concrete for foundation & trench other than hard soil & rock.(Supply only) | cum | 6.00 | 6,024 | 36,144 |
| 2 | Concrete for foundation & trench other than hard soil & rock.(Labour & Erection) | cum | 6.00 | 1,500 | 9,000 |
| 3 | Reinforced concrete for foundation & trench. (Supply only) | cum | 31.00 | 1,200 | 37,200 |
| 4 | Reinforced concrete for foundation & trench. (Labour & Erection) | cum | 31.00 | 302 | 9,362 |
| 5 | Cable trench covers(Supply only) | Sqm | 6.00 | 446 | 2,676 |
| 6 | Cable trench covers(Labour & Erection) | Sqm | 6.00 | 106 | 636 |
| 7 | Supply, fabrication, galvanisation & erection of steel gantries/portals supporting structures and small parts steel work. | MT | 2.00 | 32,829 | 65,658 |
| 8 | Supply, fabrication, galvanisation & erection of steel gantries/portals supporting structures and small parts steel work.((Labour & Erection) | MT | 2.00 | 832 | 1,664 |
| 9 | Supply & erection of 132 kV Support Insulator. | Each | 58.00 | 12,623 | 7,32,134 |
| 10 | Supply & erection of 132 kV Support Insulator. (Erection ) | Each | 58.00 | 161 | 9,338 |
| 11 | Supply & erection of 110V, 200 AH, Low maintenance Lead Acid Batteries.(Supply) | Set | 1.00 | 1,47,486 | 1,47,486 |
| 12 | Supply & erection of 110V, 200 AH, Low maintenance Lead Acid Batteries(Erection) | Set | 1.00 | 2,294 | 2,294 |
| 13 | Supply & erection of Battery Chargers for 110V, 200 AH Low maintenance Batteries. (Supply) | Each | 1.00 | 86,800 | 86,800 |
| 14 | Supply & erection of Battery Chargers for 110V, 200 AH Low maintenance Batteries. (Erection) | Each | 1.00 | 270 | 270 |
| 15 | Supply & erection of 240V L.T. Distribution Boards in the control room for 25 kVA L.T supply transformer.(Supply) | Each | 1.00 | 17,050 | 17,050 |
| 16 | Supply & erection of 240V L.T. Distribution Boards in the control room for 25 kVA L.T supply transformer.(Erection) | Each | 1.00 | 233 | 233 |
| 17 | Supply & erection of 110V DC distribution boards.(Supply) | Each | 1.00 | 7,651 | 7,651 |
| 18 | Supply & erection of 110V DC distribution boards.(Erection) | Each | 1.00 | 170 | 170 |
| 19 | For circuit breakers & Interrupter control and indication circuits. (7x2.5sq mm copper) (Supply) | Metre | 1700.00 | 59 | 1,00,300 |
| 20 | For circuit breakers & Interruptor control and indication circuits. (7x2.5sq mm copper) (Erection) | Metre | 1700.00 | 4 | 6,800 |
| 21 | For transformer alarm/trip circuits & tap changer control.(10x2.5 sqmm copper) (Supply) | Metre | 1100.00 | 83 | 91,300 |
| 22 | For transformer alarm/trip circuits & tap changer control.(10x2.5 sqmm copper) (Erection) | Metre | 1100.00 | 4 | 4,400 |
| 23 | Current transformer circuits 110V DC & 240V AC supply circuits. (2x4sqmm copper)(Supply) | Metre | 4900.00 | 33 | 1,61,700 |
| 24 | Current transformer circuits 110V DC & 240V AC supply circuits. (2x4sqmm copper) (Erection) | Metre | 4900.00 | 4 | 19,600 |
| 25 | Potential transformer and 240V AC Supply Circuits.(2x2.5 sqmm copper)(Supply) | Metre | 1000.00 | 23 | 23,000 |
| 26 | Potential transformer and 240V AC Supply Circuits.(2x2.5 sqmm copper)(Erection) | Metre | 1000.00 | 4 | 4,000 |
| 27 | 240V Heater Circuit(2x4 sqmm Aluminium) (Supply) | Metre | 600.00 | 18 | 10,800 |
| 28 | 240V Heater Circuit(2x4 sqmm Aluminium) (Erection) | Metre | 600.00 | 3 | 1,800 |
| 29 | Earth electrode.(Supply) | Each | 18.00 | 989 | 17,802 |
| 30 | Earth electrode.(Erection) | Each | 18.00 | 309 | 5,562 |
| 31 | Earth leads 75mm x 8mm mild steel laid in the ground.(Supply) | Metre | 500.00 | 70 | 35,000 |
| 32 | Earth leads 75mm x 8mm mild steel laid in the ground.(Erection) | Metre | 500.00 | 19 | 9,500 |
| 33 | 32mm dia MS Rod for earth mat.(Supply) | Metre | 1200.00 | 80 | 96,000 |
| 34 | 32mm dia MS Rod for earth mat.(Erection) | Metre | 1200.00 | 5 | 6,000 |
| 35 | Supply & spreading of Ballast/Gravel in the switch Yard.(Supply) | cum | 100.00 | 345 | 34,500 |
| 36 | Supply & spreading of Ballast/Gravel in the switch Yard.(Erection) | cum | 100.00 | 2 | 200 |
| 37 | Supply & erection of ZEBRA ACSR Conductor. (Supply) | Metre | 300.00 | 135 | 40,500 |
| 38 | Supply & erection of ZEBRA ACSR Conductor. (Erection) | Metre | 300.00 | 3 | 900 |
| Schedule total | ₹18,35,430 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
System of verification of credentials
ATTACHMENT
CorrectionSlip1-10.pdf
ATTACHMENT
PCECircularforFoundationworksnearTrack.pdf
ATTACHMENT
ContractorMBGuidelines.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
T-02-26-27_2.pdf
ATTACHMENT
2023_09_05RBCE_CE-I-CTSystemofVerificationofTendererCredentials.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .