| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | L1 | Accepted-Finance Bid Accepted L1 | |
| 2 | L2₹2.9 Cr+₹56.6 L (24.7%)Rejected-Finance | L2 | Rejected-Finance Bid Rejected L2 | |
| 3 | L3₹3.1 Cr+₹81.2 L (35.4%)Rejected-Finance 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance Bid Rejected L3 |
| Sl No | Description | Qty | Unit | RANJEET SINGH L3 | M/s Asha Colonizers and Contractors Private Limited L1 | M/S AMRENDRA KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Establishment Cost E/W in excavation in foundation and filling on required places including proper levelling, dressing, manul compaction and T&P etc. | 277.66 | M³ | 198.48 ₹55,109.96 | 130 ₹36,095.8 Lowest | 155.09 ₹43,062.92 |
| 2.00 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. | 26.76 | M³ | 9,632.66 ₹2,57,769.98 | 8,650 ₹2,31,474 | 7,526.96 ₹2,01,421.46 Lowest |
| 3.00 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. | 144.65 | M³ | 11,798.76 ₹17,06,690.63 | 9,820 ₹14,20,463 | 9,219.55 ₹13,33,608.06 Lowest |
| 4.00 | Supplying and laying of Steel reinforcement including cutting , bendin, binding & placing in position at site. including cost of all materials, labours, T&P etc. | 4.21 | MT | 74,075 ₹3,11,855.75 | 70,000 ₹2,94,700 | 57,882.21 ₹2,43,684.08 Lowest |
| 5.00 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P etc. | 506.07 | M² | 210 ₹1,06,274.7 | 110 ₹55,667.7 Lowest | 164.09 ₹83,043.05 |
| 6.00 | Making / construction of coffer bund and earthen approach road by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. | 12,252.88 | M³ | 220 ₹26,95,633.6 | 100 ₹12,25,288 Lowest | 171.91 ₹21,06,368.1 |
| 7.00 | Hiring of diesel pump 5 H.P including running by operator with fuel and all acessories like suction pipe and delivery pipe.for surface water lifting. | 340 | Hrs | 190 ₹64,600 | 110 ₹37,400 Lowest | 148.47 ₹50,478.44 |
| 8.00 | Supplying and Laying graded filter with Dala stone grit 12.50 mm - 20 mm.including cost of all materials, labours, T&P etc. | 15.12 | M³ | 5,833.73 ₹88,206 | 4,850 ₹73,332 Lowest | 7,684.08 ₹1,16,183.24 |
| 9.00 | Supplying and Laying graded filter with coarse sand FM not less than 2 .including cost of all materials, labours, T&P etc. | 15.27 | M³ | 5,417.63 ₹82,727.21 | 4,850 ₹74,059.5 | 4,233.34 ₹64,643.04 Lowest |
| 10.00 | Construction of 5 Nos store E/W in excavation in foundation and filling on required places including proper levelling, dressing, mannul compaction and T&P etc. | 318.85 | M³ | 198.48 ₹63,285.35 | 130 ₹41,450.5 Lowest | 155.09 ₹49,451.17 |
Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
10 Sept 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE I and P WR Circle, Govindpur Prayagraj
As per Tender Notice LOT-2
2026_UPIDC_1181072_2
02 / S.E./2026-27
Open Tender
Civil Works
Item Rate
prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.3 L
15 Oct 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Establishment Cost E/W in excavation in foundation and filling on required places including proper levelling, dressing, manul compaction and T&P etc. | - | M³ | - | - |
| 2 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. | - | M³ | - | - |
| 3 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. | - | M³ | - | - |
| 4 | Supplying and laying of Steel reinforcement including cutting , bendin, binding & placing in position at site. including cost of all materials, labours, T&P etc. | - | MT | - | - |
| 5 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P etc. | - | M² | - | - |
| 6 | Making / construction of coffer bund and earthen approach road by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. | - | M³ | - | - |
| 7 | Hiring of diesel pump 5 H.P including running by operator with fuel and all acessories like suction pipe and delivery pipe.for surface water lifting. | - | Hrs | - | - |
| 8 | Supplying and Laying graded filter with Dala stone grit 12.50 mm - 20 mm.including cost of all materials, labours, T&P etc. | - | M³ | - | - |
| 9 | Supplying and Laying graded filter with coarse sand FM not less than 2 .including cost of all materials, labours, T&P etc. | - | M³ | - | - |
| 10 | Construction of 5 Nos store E/W in excavation in foundation and filling on required places including proper levelling, dressing, mannul compaction and T&P etc. | - | M³ | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
document02.pdf
Tender Documents • 3.23 MB
BOQ_2220587.xls
BOQ • 0.32 MB
suddhipatralot02.pdf
PDF • 1.96 MB
suddhipatra01.pdf
PDF • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .