Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹747.5 CrAdmitted-Finance | ₹747.5 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical S 2 THE METROPOLE ADJACENT TO INOX BUND GARDEN ROAD PUNE 411001 | PUNE | PUNE | MAHARASHTRA | 411001 | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
| 3 | Rejected-Technical 3RD FLOOR BELAPUR BHAVAN SECTOR 11 CBD BELAPUR NAVI MUMBAI THANE MAHARASHTRA 400614 | THANE | MAHARASHTRA | 400614 | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED |
| Sl No | Description | Qty | Unit | SRC COMPANY INFRA PVT LTD L1 |
|---|---|---|---|---|
| 1.00 | SECTION-I: EARTH WORK IN FORMATION & BLANKETING
SCHEDULE - A: Execution of IR USSOR-2019 Items | 1 | Nos | 1,34,75,34,781.58 ₹1,34,75,34,781.58 Lowest |
| 2.00 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- A: Execution of IR USSOR-2019 items | 1 | Nos | 69,84,74,151.89 ₹69,84,74,151.89 Lowest |
| 3.00 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- B: Supply of Reinforcement Steel | 1 | Nos | 35,56,49,056.85 ₹35,56,49,056.85 Lowest |
| 4.00 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- C: Supply of Structural Steel | 1 | Nos | 3,45,19,809.62 ₹3,45,19,809.62 Lowest |
| 5.00 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- D: Supply of Ordinary Portland Cement - 53 | 1 | Nos | 16,26,55,394.9 ₹16,26,55,394.9 Lowest |
| 6.00 | SSECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- A: PSC SLEEPERS | 1 | Nos | 23,29,85,137.94 ₹23,29,85,137.94 Lowest |
| 7.00 | SECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- B: POINTS & CROSSING, D/S AND P-WAY FITTINGS | 1 | Nos | 17,40,43,836.81 ₹17,40,43,836.81 Lowest |
| 8.00 | SECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- C: Ballast Suppy | 1 | Nos | 18,74,12,786 ₹18,74,12,786 Lowest |
| 9.00 | SECTION-IV: TRACK LINKING & ASSOCIATED WORKS
SCHEDULE- A: Execution of IR USSOR-2019 items | 1 | Nos | 9,75,75,023.74 ₹9,75,75,023.74 Lowest |
| 10.00 | SECTION-IV: TRACK LINKING & ASSOCIATED WORKS
SCHEDULE- B: Execution of NS items | 1 | Nos | 5,39,09,316.95 ₹5,39,09,316.95 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.9 Cr
Closing Date
5 Aug 2021, 3:00 pmClosed
GMP RPO Secunderabad
RITES Ltd FIRST FLOOR MALANI EXCEL St. JOHNS ROAD EAST MARREDPALLY SECUNDERABAD 500026
Civil works incl. Earthwork for BG Rly Sdg, Blanketing, Minor and Major Bridges, ROR, Pway materials supply, Trackwork, OHE and allied works etc.
2021_RITES_78149_1
RITES/SC/YTPS/Composite Work/2021 Dated 25.05.2021
Open Tender
Civil Works
Percentage
540 days
Veerlapalem vill, Nalgonda Dist
Document at Sl. No. 1 to 22 as mentioned in clause 28 of section 1 of technical bid
2 documents required · 2 mandatory
₹18,000
Yes
TSGENCO
₹5.9 Cr
Yes
RITES Ltd. RPO Secunderabad
18 Apr 2022
26 May 2021
6 Aug 2021
26 May 2021
5 Aug 2021
26 May 2021
26 May 2021 - 7 Jun 2021
7 Jun 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION-I: EARTH WORK IN FORMATION & BLANKETING
SCHEDULE - A: Execution of IR USSOR-2019 Items | - | Nos | - | - |
| 2 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- A: Execution of IR USSOR-2019 items | - | Nos | - | - |
| 3 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- B: Supply of Reinforcement Steel | - | Nos | - | - |
| 4 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- C: Supply of Structural Steel | - | Nos | - | - |
| 5 | SECTION-II: MINOR AND MAJOR BRIDGES (including ROR, FOB & Yard Drains)
SCHEDULE- D: Supply of Ordinary Portland Cement - 53 | - | Nos | - | - |
| 6 | SSECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- A: PSC SLEEPERS | - | Nos | - | - |
| 7 | SECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- B: POINTS & CROSSING, D/S AND P-WAY FITTINGS | - | Nos | - | - |
| 8 | SECTION-III: SUPPLY OF P-WAY MATERIALS
SCHEDULE- C: Ballast Suppy | - | Nos | - | - |
| 9 | SECTION-IV: TRACK LINKING & ASSOCIATED WORKS
SCHEDULE- A: Execution of IR USSOR-2019 items | - | Nos | - | - |
| 10 | SECTION-IV: TRACK LINKING & ASSOCIATED WORKS
SCHEDULE- B: Execution of NS items | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_84536.xls
BOQ Document • 2.11 MB
77780433.pdf
Tender Document • 0.72 MB
tenderdocument.pdf
Tender Document • 12.83 MB
77780435.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .