| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS. | |
| 2 | L2₹22.7 L+₹2.0 L (9.54%)Rejected-Finance | L2 | Rejected-Finance REJECTED NOT BEING L1 | |
| 3 | L3₹23.8 L+₹3.1 L (14.9%)Rejected-Finance AT BAGHUABOL PO TALCHER PS TALCHER DIST CUTTACK ODISHA 759100 | ANUGUL | ODISHA | 759100 | L3 | Rejected-Finance REJECTED NOT BEING L1 | |
| 4 | L4₹25.3 L+₹4.6 L (22.2%)Rejected-Finance AT NARAHARIPUR PO HENSMYL TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | L4 | Rejected-Finance REJECTED NOT BEING L1 | |
| 5 | L5₹28.6 L+₹7.8 L (37.8%)Rejected-Finance | L5 | Rejected-Finance REJECTED NOT BEING L1 |
Tender Value
₹40.8 L
EMD Value
₹51,100
Closing Date
13 Feb 2023, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Maintenance of approach Road to SILO Phase 1 and other maintenance required work along the Road from Dera Chhak to 3 and 4 siding of Bhubaneswari OCP under Jagannath Area.
2023_MCL_269642_1
MCL/GM(JA)/SO(C)/e- Tender/22-23/191,Dtd-01/02/23
Open Tender
Civil Works - Roads
Item Rate
30 days
Bhubaneswari OCP
AS PER NIT
3 documents required · 3 mandatory
₹51,100
18 Feb 2023
1 Feb 2023
15 Feb 2023
2 Feb 2023
13 Feb 2023
2 Feb 2023
2 Feb 2023 - 6 Feb 2023
Amount
PART-A(Concrete):-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
Providing and fixing pre-Cast RCC round shape pillar as per the direction of Engineer-in charge.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:Channels, angles, tees and flats
PART-B(Road Maintenance):-Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications
PART-C(Plantation):-Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)Holes 60 cm dia, and 60 cm deep
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment).
Providing and stacking of Bakula Tree (Medium Size) at work site as per instruction of Engg-In-Charge.
Providing and stacking of PVC Pot (Size 450 mm Dia) including Erica palm,mix of good Earth and cow dung at work site as per instruction of Engg-In-Charge.
Providing and fixing of RCC pre-Cast Tree Guard at work side as per instruction of Engg-In-Charge.
PART-D(Road Cleaning):-Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
Upkeeping of concrete pavement/ Black topped roads excluding coal transport road by brooming and disposal of collected debris/ waste at collection pit/ dustbins or at specified locations within a lead of 50 metres including all tools & plants like spade, basket, brooms with handle stick complete as per the direction of Engineer-In-Charge.
Supplying and stacking good quality moorum at work site with all lead and royalty, all complete.
Spreading moorum/sand stone dust etc.in layers not exceeding 250MM in thickness,levelling to required gradient and camber,watering as per the direction of EIC.
Supply and stacking unslaked lime at work site with all lead and royalty all complete as per the direction of EIC.
Supply of unskilled labour at work site with all lead and royalt all complete as per the direction of EIC.
Total impact of GST for the purpose of CTC
DILESWAR SAHU
NITYANANDA MISHRA
NIRAKAR PRADHAN
BARUNDEB SAHOO
M/S PANI BROTHERS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .