Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹9,625.79 (3.62%)Admitted-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹2.8 L+₹9,625.79 (3.62%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 L+₹13,006.79 (4.89%)Admitted-Finance VILL PO BILPAHARI BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹2.8 L+₹13,006.79 (4.89%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AINDRILA ENTERPRISE L3 | SABIR CONSTRUCTION L2 | BELU GHOSH L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing of RHS Final Drive, sprocket boss | ||||||
| 1.01 | Cost of MS electrode (Ferroweld 2) (4mm) | 350 | Pcs. | 21 ₹7,350 | 21 ₹7,350 | 20 ₹7,000 Lowest |
| 1.02 | Cost of special tools like hyd puller etc. | 1 | Job | 4,720 ₹4,720 | 4,660 ₹4,660 | 4,500 ₹4,500 Lowest |
| 1.03 | DA(8.9 Cum per Cyl.) | 2 | Cyl | 3,669 ₹7,338 | 3,622 ₹7,244 | 3,497.5 ₹6,995 Lowest |
| 1.04 | Oxygen(7.6 Cum per Cyl.) | 10 | Cyl | 438 ₹4,380 | 433 ₹4,330 | 418 ₹4,180 Lowest |
| 1.05 | Bearing position machining | 2 | Job | 9,440 ₹18,880 | 9,320 ₹18,640 | 9,000 ₹18,000 Lowest |
| 1.06 | Machining cost as per proper bolt size | 27 | Pcs. | 577 ₹15,579 | 570 ₹15,390 | 550 ₹14,850 Lowest |
| 1.07 | Special electrodes (Durochrome)(4mm) | 6 | KG | 3,671 ₹22,026 | 3,625 ₹21,750 | 3,500 ₹21,000 Lowest |
| 1.08 | Service Charge Including 12.72% PF & contractor profit (Skilled 3 Nos X 5 Days X 2 Shift, Semi- Skilled 4 Nos. X 5 days X 2 shift & Un-Skilled 4 Nos. X 5 days X 2 Shift | 1 | Job | 93,370 ₹93,370 | 92,186 ₹92,186 | 89,016.9 ₹89,016.9 Lowest |
| 1.09 | Profit @ 10% on Consumables | 1 | No. | 8,027 ₹8,027 | 7,925 ₹7,925 | 7,652.54 ₹7,652.54 Lowest |
Tender Value
₹3.1 L
EMD Value
₹3,925
Closing Date
7 Aug 2026, 9:00 amClosed
Area Engineer (Excv.), PA
Office of the Area General Manager, Pandaveswar Area, P.O. - Pandaveswar, dist. Burdwan, west Bengal, 733346
Repairing of RHS final drive Assy., sprocket boss and changing and repairing of equalizer frame/balancing of dozer SL NO 13578.
2026_ECL_362531_1
GM/PND/EXCV/E_Tender/26-27/15
Open Tender
Excavation Department Work
Item Rate
9 days
Khottadih Open Cast Project
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,925
18 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
27 Jul 2026 - 30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of RHS Final Drive, sprocket boss | |||||
| 1.01 | Cost of MS electrode (Ferroweld 2) (4mm) | - | Pcs. | 20 | - |
| 1.02 | Cost of special tools like hyd puller etc. | - | Job | 4,500 | - |
| 1.03 | DA(8.9 Cum per Cyl.) | - | Cyl | 3,497.7 | - |
| 1.04 | Oxygen(7.6 Cum per Cyl.) | - | Cyl | 418 | - |
| 1.05 | Bearing position machining | - | Job | 9,000 | - |
| 1.06 | Machining cost as per proper bolt size | - | Pcs. | 550 | - |
| 1.07 | Special electrodes (Durochrome)(4mm) | - | KG | 3,500 | - |
| 1.08 | Service Charge Including 12.72% PF & contractor profit (Skilled 3 Nos X 5 Days X 2 Shift, Semi- Skilled 4 Nos. X 5 days X 2 shift & Un-Skilled 4 Nos. X 5 days X 2 Shift | - | Job | 89,016.9 | - |
| 1.09 | Profit @ 10% on Consumables | - | No. | 7,652.54 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_375441.xls
BOQ • 0.33 MB
GTC.pdf
Tender Documents • 1.54 MB
ANNEXURE.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .