Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -0.11% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹154 (0.11%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.4 L+₹154 (0.11%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹2,800
Closing Date
9 Sept 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627106895- CO WASHROOM AT UMAR MASJID BEIGHPORA BLOCK AWANTIPORA
2026_RDPR_322606_31
e- NIT No. 107/2026-27 Dated 27-08-2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,800
11 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 8.98 | cum | - | - |
| 2 | Provinding and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 1.4 | cum | - | - |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:4:8 mix (1cement: 4coarse sand: 8 graded stone aggregate with 20mm nominal size) | 0.4 | cum | - | - |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) | 1.72 | cum | - | - |
| 5 | Cost of plum | 0.43 | cum | - | - |
| 6 | Brick work with common burnt clay (non-modular) bricksof class designation 7.5 in foundation and plinth ic curing in cement mortar 1:6 mix | 5.26 | cum | - | - |
| 7 | Extra brick work above plinth level upto floor 5 level | 2.6 | cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for walls (any thickness) including slabs, suspended floors etc | 3.07 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for walls (any thickness) including attached plisters, butresses, plinth etc complete job:deptic tank/ plinth outside/inside | 9.75 | sqm | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_1082517.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .