Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC MADURAI | TAMIL NADU | 625001 | L1 | Accepted-AOC L1 Accept | |
| 2 | L2₹6.7 L+₹4,289.73 (0.64%)Rejected-Finance ERODE | TAMIL NADU | 638451 | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | S.MURUGANANTHAM L1 | C. PADIKKASU L2 |
|---|---|---|---|---|---|
| 1.00Construcrtion of Weir at Parayankadu Kanmai in Embal Panchayat | |||||
| 2.00 | Dismantling with out damaging the near by structures if any, clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortar wall under 3m High as directed by the Engineer in charge of the works as per technical Specification | 9.01 | Cum | 302 ₹2,721.02 Lowest | 310 ₹2,793.1 |
| 3.00 | Dismantling with out damaging the near by structures if any, clearing away Plain cement concrete as directed by the Engineer in charge of the works as per technical Specification. | 2.4 | Cum | 520 ₹1,248 Lowest | 530 ₹1,272 |
| 4.00 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification. | 41.85 | Cum | 263.5 ₹11,027.48 Lowest | 268 ₹11,215.8 |
| 5.00 | Supplying and filling with the Sand gravel mix 1:1 ratio in 15cm thick layer including watering compacting cost and conveyance materials etc., complete complying with the standard specification and as directed by the Engineer in charge of the work | 7.31 | Cum | 1,853 ₹13,545.43 Lowest | 1,860 ₹13,596.6 |
| 6.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 24.69 | Cum | 5,450 ₹1,34,560.5 Lowest | 5,480 ₹1,35,301.2 |
| 7.00 | Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 43.17 | Cum | 7,450.5 ₹3,21,638.09 Lowest | 7,460 ₹3,22,048.2 |
| 8.00 | Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer | 75.88 | Sqm | 547 ₹41,506.36 Lowest | 575 ₹43,631 |
| 9.00 | Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 4.87 | Cum | 8,015 ₹39,033.05 Lowest | 8,020 ₹39,057.4 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 1,01,750.39 ₹1,01,750.39 Lowest | 1,02,404.75 ₹1,02,404.75 |
Tender Value
₹6.8 L
EMD Value
₹6,750
Closing Date
4 Sept 2025, 3:00 pmClosed
Bdo,Arimalam
Pt.Union Office Arimalam
Construcrtion of Weir at Parayankadu Kanmai in Embal Panchayat
2025_RDTN_598616_1
Arm/PUGF/Work-1
Open Tender
Civil Works
Item Rate
180 days
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,750
27 Sept 2025
29 Aug 2025
4 Sept 2025
29 Aug 2025
4 Sept 2025
29 Aug 2025
Amount
Construcrtion of Weir at Parayankadu Kanmai in Embal Panchayat
Dismantling with out damaging the near by structures if any, clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortar wall under 3m High as directed by the Engineer in charge of the works as per technical Specification
Dismantling with out damaging the near by structures if any, clearing away Plain cement concrete as directed by the Engineer in charge of the works as per technical Specification.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Supplying and filling with the Sand gravel mix 1:1 ratio in 15cm thick layer including watering compacting cost and conveyance materials etc., complete complying with the standard specification and as directed by the Engineer in charge of the work
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 9 of Section 2 of Instruction to Bidders (ITB) of SBD)
C. PADIKKASU (BID ID -1449509)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .