Tender Value
₹21.2 L
EMD Value
₹42,600
Closing Date
30 Jul 2026, 5:00 pm4d left
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Maintancae of ambedkar bhawan in Village- Chanchali, YEA. WC-06
2026_YEIDA_1168792_3
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹840
₹42,600
30 Jul 2026
14 Jul 2026
3 Aug 2026
14 Jul 2026
30 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in ordinary in all of foundation tranches including dressing of side and ramming of bottom lifts upto a 1.5m including getting out the excavation soil and disposal of surplus excavated soil as directed with in a lead of 50m . AR | - | Cum | 1 | - |
| 0.0 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | - | Cum | - | - |
| 0.0 | M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/305a | 1 | Cum | - | - |
| 0.0 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar superstructure but for walls of half brick thick including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a)+310A | 1 | Cum | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)Based on UPPWD SOR/DAR-18/5.1.2 | 1 | Cum | - | - |
| 0.0 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcementAll works above plinth level upto floor V level: Based on UPPWD SOR/DAR-18/5.2.2 | 1 | Cum | - | - |
| 0.0 | Centring and shuttering including strutting, propping etc. and removal of form for : foundation footings, base of column | 1 | Sqm | - | - |
| 0.0 | Lintels, beams, plinth beams, girders, bressumers and cantilevers.DAR-18/5.9.5/P-193 | - | Sqm | 1 | - |
| 0.0 | Centring and shuttering including strutting, propping etc. and removal of form for : suspended floors, roofs, landings | - | Sqm | - | - |
| 0.0 | Edges of slabs and breaks in floors and walls: Under 20 cms wide. (DAR/5.9.16.1/Based on UPPWD/SOR-2020)) | 1 | Rmt | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
3.pdf
Tender Documents • 1.39 MB
BOQ_2193542.xls
BOQ • 0.34 MB
550.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].