Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 CrAccepted-AOC B303 ALLFINE LOWERS NO3 PALANIYAPPA WEST STREET SENKUNTHAPURAM KARUR 002 | KARUR | TAMIL NADU | 621301 | L1 | Accepted-AOC after negotiation the Low price | |
| 2 | L2₹19.0 Cr+₹69.4 L (3.79%)Rejected-Finance | L2 | Rejected-Finance Due to High Price | |
| 3 | L3₹19.5 Cr+₹1.2 Cr (6.71%)Rejected-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | L3 | Rejected-Finance Due to High Price |
| Sl No | Description | Qty | Unit | kousic and co L3 | SANKARANAND INFRA L1 | SKP CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. | 1,000 | One Cubic Metre | 145 ₹1,45,000 | 136 ₹1,36,000 Lowest | 141 ₹1,41,000 |
| 2.00 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS & PIERS as per Section 300 of MoRT&(H) Specifications (Fifth Revision). | 322 | One Cubic Metre | 526 ₹1,69,372 | 493 ₹1,58,746 Lowest | 511 ₹1,64,542 |
| 3.00 | Earth work excavation in all classes of SDR / Soft rock not requiring blasting and depositing on bank, with all leads and lifts including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS AND PIERS as per Section 300 of MORT&H specifications (V revision). | 573 | One Cubic Metre | 668 ₹3,82,764 | 626 ₹3,58,698 Lowest | 649 ₹3,71,877 |
| 4.00 | Earth work excavation in hard rock requiring blasting and depositing on bank, with all leads and lifts including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS AND PIERS as per Section 300 of MORT&H specifications (V revision). | 271 | One Cubic Metre | 2,236 ₹6,05,956 | 2,095 ₹5,67,745 Lowest | 2,173 ₹5,88,883 |
| 5.00 | Benching of rock, upto an average 10cm depth, cleaning of any loose materials and levelling with a layer of concrete of same grade as that of the foundation [M35] to provide an even surface, including labour etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENT as per Section 2100 of MoRT&(H) Specifications (Fifth Revision). | 371 | One Square Metre | 993 ₹3,68,403 | 930 ₹3,45,030 Lowest | 965 ₹3,58,015 |
| 6.00 | Providing Dowel bars 25mm dia. (HSD bars), including cost and conveyance of all materials to work site, drilling 40mm holes in rock and grouting the same with approved epoxy resin and hardener in 1:1 after placing the dowel bars etc. complete in FOUNDATION. | 506 | One Number | 1,066 ₹5,39,396 | 999 ₹5,05,494 Lowest | 1,036 ₹5,24,216 |
| 7.00 | Compacted Cement Concrete of grade M15 (Nominal mix) using 40mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification, for LEVELLING COURSE BELOW FOOTING UNDER ABUTMENT as per Section 1100 of MORT&H Specifications (Fifth Revision). | 8.5 | One Cubic Metre | 7,130 ₹60,605 | 6,680 ₹56,780 Lowest | 6,930 ₹58,905 |
| 8.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per Sections 2100, 1500 & 1700 of MORT&H Specifications (Fifth Revision). | 252 | One Cubic Metre | 11,087 ₹27,93,924 | 10,386 ₹26,17,272 Lowest | 10,774 ₹27,15,048 |
| 9.00 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification for FOOTING UNDER PIERS as per Sections 2100, 1500 & 1700 of MORT&H Specifications (Fifth Revision). | 443 | One Cubic Metre | 11,012 ₹48,78,316 | 10,316 ₹45,69,988 Lowest | 10,701 ₹47,40,543 |
| 10.00 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for SUB STRUCTURE - ABUTMENTS and RETURNS as per Sections 1500, 1700 & 2200 of MORT&H specification (V Revision). | 198 | One Cubic Metre | 14,139 ₹27,99,522 | 13,245 ₹26,22,510 Lowest | 13,740 ₹27,20,520 |
Tender Value
₹17.8 Cr
EMD Value
₹9.0 L
Closing Date
2 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(NH)Salem
O/o the Superintending Engineer, National Highways, Omalur main road Narasothipatty, Alagapuram (Po),Salem 636 004
Construction of Additional Major bridge at km 11/10 of Pollachi - Valparai Road (SH-78)
2026_MoRTH_894138_1
TNNo26HDONH/25-26/Dt.14.01.25
Open Tender
Civil Works - Bridges
Item Rate
455 days
pollachi
Yes, as per Tender Documents
5 documents required · 5 mandatory
₹17,700
15000 online payment through bharatkosh webportal
₹9.0 L
O/o the SE(NH)Salem
5 May 2026
15 Jan 2026
3 Feb 2026
15 Jan 2026
2 Feb 2026
15 Jan 2026
22 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. | 1,000 | One Cubic Metre | - | - |
| 2 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS & PIERS as per Section 300 of MoRT&(H) Specifications (Fifth Revision). | 322 | One Cubic Metre | - | - |
| 3 | Earth work excavation in all classes of SDR / Soft rock not requiring blasting and depositing on bank, with all leads and lifts including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS AND PIERS as per Section 300 of MORT&H specifications (V revision). | 573 | One Cubic Metre | - | - |
| 4 | Earth work excavation in hard rock requiring blasting and depositing on bank, with all leads and lifts including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION UNDER ABUTMENTS AND PIERS as per Section 300 of MORT&H specifications (V revision). | 271 | One Cubic Metre | - | - |
| 5 | Benching of rock, upto an average 10cm depth, cleaning of any loose materials and levelling with a layer of concrete of same grade as that of the foundation [M35] to provide an even surface, including labour etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENT as per Section 2100 of MoRT&(H) Specifications (Fifth Revision). | 371 | One Square Metre | - | - |
| 6 | Providing Dowel bars 25mm dia. (HSD bars), including cost and conveyance of all materials to work site, drilling 40mm holes in rock and grouting the same with approved epoxy resin and hardener in 1:1 after placing the dowel bars etc. complete in FOUNDATION. | 506 | One Number | - | - |
| 7 | Compacted Cement Concrete of grade M15 (Nominal mix) using 40mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site including potable water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification, for LEVELLING COURSE BELOW FOOTING UNDER ABUTMENT as per Section 1100 of MORT&H Specifications (Fifth Revision). | 8.5 | One Cubic Metre | - | - |
| 8 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification for FOOTING UNDER ABUTMENTS AND RETURN WALLS as per Sections 2100, 1500 & 1700 of MORT&H Specifications (Fifth Revision). | 252 | One Cubic Metre | - | - |
| 9 | Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying, curing concrete, working at depths, hire charges for tools and plants, including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, structing etc., complete as per relevant standard specification for FOOTING UNDER PIERS as per Sections 2100, 1500 & 1700 of MORT&H Specifications (Fifth Revision). | 443 | One Cubic Metre | - | - |
| 10 | Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for SUB STRUCTURE - ABUTMENTS and RETURNS as per Sections 1500, 1700 & 2200 of MORT&H specification (V Revision). | 198 | One Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
PQvolfinal.pdf
Tender Documents • 0.19 MB
PQvol2final.pdf
Tender Documents • 0.31 MB
HLBSPGAD.pdf
Additional Documents • 3.10 MB
BOQ_939825.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .