| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.9 LAccepted-AOC | ₹92.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹94.2 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹94.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Gopi S L2 | Malaiarasan.V L1 |
|---|---|---|---|---|---|
| 1.01Strengthening the Road from Nattarmangalam kallalipattu road to Pandiyankulam road KM 0/0 - 2/0 | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete.KM 0/0 - 2/0 | 2,400 | Sqm | 15 ₹36,000 | 5.2 ₹12,480 |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br KM 0/0 - 2/0 | 1,350 | Cum | 200 ₹2.7 L | 140 ₹1.9 L |
| 1.04 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m KM 0/0 - 2/0 | 2,500 | Cum | 25 ₹62,500 | 23 ₹57,500 |
| 1.05 | Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. KM 0/0-1/0 | 187.5 | Cum | 772.44 ₹1.4 L | 772.44 ₹1.4 L |
| 1.06 | Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. KM 1/0-2/0 | 187.5 | Cum | 782.5 ₹1.5 L | 782.5 ₹1.5 L |
| 1.07 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . KM 0/0-1/0 | 77.63 | Cum | 2,619.07 ₹2.0 L | 2,619.07 ₹2.0 L |
| 1.08 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 2/0 | 813.08 | Cum | 2,723.27 ₹22.1 L | 2,723.27 ₹22.1 L |
| 1.09 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/0 - 2/0 | 6,504.63 | SQM | 86.54 ₹5.6 L | 86.54 ₹5.6 L |
| 1.10 | Providing and laying tack coat over WMM surface (Treated with primer using 2.5 kg of bituminous emulsion RS-1 FOR 10SQM KM 0/0 - 2/0 | 6,515.5 | SQM | 20.25 ₹1.3 L | 20.25 ₹1.3 L |
Tender Value
₹97.9 L
EMD Value
₹98,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Additional Collector
DRDA, VILUPPURAM
TNVPM/NABARD/26-27/26
2026_RDTN_656513_8
TNVPM/NABARD/26-27
Open Tender
Civil Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹98,000
Yes
14 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
15 Feb 2026
Strengthening the Road from Nattarmangalam kallalipattu road to Pandiyankulam road KM 0/0 - 2/0
Clearing the scrub jungles including all labour charges for all labour charges etc complete.KM 0/0 - 2/0
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br KM 0/0 - 2/0
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m KM 0/0 - 2/0
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. KM 0/0-1/0
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. KM 1/0-2/0
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . KM 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0 - 2/0
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/0 - 2/0
Providing and laying tack coat over WMM surface (Treated with primer using 2.5 kg of bituminous emulsion RS-1 FOR 10SQM KM 0/0 - 2/0
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0 - 2/0
Provision of 15 nos of rumble strips covered with premix bituminous carpet, 15 - 20 mm high at centre, 250 mm wide placed at 1 m center-to-centre at approved locations to control speed, marked with white strips of road marking paint. KM 0/0 - 2/0
Provision for KM Stones
Provision for HM Stones of size 0.15x0.10x0.75m.
Provision for 90Cm equilateral triangle Sign board Charges
Cement Concrete Pavement CH -530 -710m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Cement Concrete Pavement CH -1040-1130m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Construction of RCC Slab Culvert -1.50m Span
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
Below Sill
Above Sill
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Provision for Bitumen Pads
Provision for Wheep Holes
Towards the cost of Name Board charges
Towards the cost of photographic charges
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
26.pdf
Tender Documents • 1.02 MB
BOQ_787555.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid