Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
29 Sept 2026, 5:00 pm2d left
CHIEFCONSTRUCTIONENGINEERCENTRALRANDBCIRCLEBBSR
OFFICE OF THE CHIEF CONSTRUCTION ENGINEER, CENTRAL RAND B CIRCLE, BHUBANESWAR
Short Term Maintenance Contract STMC works for 14 Nos. of Roads for an aggregated length of 20.335 km under BBSR R and B Division-V, Package-I for the year 2026-27.
2026_EICCL_141050_1
08 OF 2026-27
Open Tender
Civil Works - Roads
Percentage
365 days
Bhubaneswar
2 documents required · 2 mandatory
₹10,000
₹3.0 L
Yes
29 Sept 2026
12 Sept 2026
29 Sept 2026
12 Sept 2026
29 Sept 2026
12 Sept 2026
12 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ROAD MAINTENANCE WORK PART-A
Clearing and grubbing of road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to a lead of 1000 metres, including removal and disposal of top organic soil not exceeding 150 mm in thickness, complete in all respects as per Clause 201 of MoRT&H Specifications for Road & Bridge Works (5th Revision) and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 193.00
2) Road ID:D49-R12.A- Qunatity = 810.6
3) Road ID:SOS Village- Qunatity = 93.60
4) Road ID:D49-R16.A- Qunatity = 174.40
5) Road ID:D49-R19.A- Qunatity = 217.60
6) Road ID:D49-R18.A- Qunatity = 107.85
7) Road ID:D49-R05.A- Qunatity = 181.20
8) Road ID:D49-R04.A- Qunatity = 189.00
9) Road ID:D49-R13.A- Qunatity = 62.20
10) Road ID:D49-R11.A- Qunatity = 214.00
11) Road ID:D49-R06.A- Qunatity = 180.60
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 849.53
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 104.90
14) Road ID: D-49-R01.A - Qunatity = 740.00
Total Quanity =4185.38 Square Meters | 4,118.48 | sqm | 8.63 | ₹35,542.48 |
| 2 | Flank dressing to proper camber with all leads and lifts, including dressing and levelling the bed and depositing the excavated earth at places away from the work site, including dewatering if required, cost of all labour, T&P and all incidental charges, complete as per approved Drawing and Technical Specifications and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 579.00
2) Road ID:D49-R12.A- Qunatity =3242.4
3) Road ID:SOS Village- Qunatity = 374.40
4) Road ID:D49-R16.A- Qunatity =523.20
5) Road ID:D49-R19.A- Qunatity =652.80
6) Road ID:D49-R18.A- Qunatity =431.40
7) Road ID:D49-R05.A- Qunatity =543.60
8) Road ID:D49-R04.A- Qunatity =567.00
9) Road ID:D49-R13.A- Qunatity = 186.60
10) Road ID:D49-R11.A- Qunatity = 642.00
11) Road ID:D49-R06.A- Qunatity = 541.80
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 2808.60
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 629.40
14) Road ID: D-49-R01.A - Qunatity = 2220.00
Total Quanity =14209.80 Square Meters | 13,942.2 | sqm | 7.07 | ₹98,571.35 |
| 3 | Providing and laying B.U.S.G. 75 mm thick in two layers using tack coat @ 3.0 kg/10 sqm, 25 mm to 40 mm size B.H.G.C.B. metal @ 0.45 Cum and 12.0 kg of 80/100 penetration grade bitumen in one layer with 0.12 Cum of 12 mm size B.H.G.C.B. chips as key stone per 10 sqm, including cleaning of road surface, heating, pouring and spreading of bitumen and materials, laying and spreading, rolling with PRR including hire and running charges of PRR, cost, conveyance and royalty of all materials, T&P, labour charges and all incidental charges, complete as per Specifications and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 675.50
2) Road ID:D49-R12.A- Qunatity = 2026.5
3) Road ID:SOS Village- Qunatity = 436.80
4) Road ID:D49-R16.A- Qunatity =305.20
5) Road ID:D49-R19.A- Qunatity =380.80
6) Road ID:D49-R18.A- Qunatity =251.65
7) Road ID:D49-R05.A- Qunatity =362.40
8) Road ID:D49-R04.A- Qunatity =378.00
9) Road ID:D49-R13.A- Qunatity = 217.70
10) Road ID:D49-R11.A- Qunatity = 374.50
11) Road ID:D49-R06.A- Qunatity = 451.50
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 1755.38
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 2590.00
Total Quanity =10373.20 Square Meters | 10,205.93 | sqm | 678.52 | ₹69,24,927.62 |
| 4 | Providing and applying tack coat with bitumen emulsion @ 0.20 kg of bitumen per sqm on the prepared bituminous/granular surface, including scraping and cleaning the road surface with mechanical broom, spraying and uniform application of bitumen emulsion, including hire and running charges of all machinery, cost, conveyance, royalty and taxes of all materials, labour, T&P and all incidental charges, complete as per Clause 503 of MoRT&H Specifications for Road & Bridge Works (5th Revision), Technical Specifications and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 2067.03
2) Road ID:D49-R12.A- Qunatity =6201.09
3) Road ID:SOS Village- Qunatity = 1336.61
4) Road ID:D49-R16.A- Qunatity = 933.91
5) Road ID:D49-R19.A- Qunatity =1165.25
6) Road ID:D49-R18.A- Qunatity =770.05
7) Road ID:D49-R05.A- Qunatity =1108.94
8) Road ID:D49-R04.A- Qunatity =1156.68
9) Road ID:D49-R13.A- Qunatity = 666.16
10) Road ID:D49-R11.A- Qunatity = 1145.97
11) Road ID:D49-R06.A- Qunatity = 1381.59
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 5371.45
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 7925.40
Total Quanity =31741.90 Square Meters | 31,230.13 | sqm | 18.49 | ₹5,77,445.1 |
| 5 | Providing and laying Bituminous Concrete (BC) Grade 2 using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent by weight of total mix and approved mineral filler, conforming to the requirements of MoRTH Specifications for Road and Bridge Works, Clause 509 and the approved Job Mix Formula (JMF); transporting the hot mix to the work site, laying with a hydrostatic paver finisher fitted with sensor control to the required grade, level, camber and alignment, and compacting with smooth-wheeled, vibratory and tandem rollers to achieve the specified density and compaction. The item shall include the cost of all materials, aggregates, bituminous binder, filler, labour, transportation, loading and unloading, T&P, taxes, royalty, fuel, hire and running charges of all plant and machinery, including paver finisher, rollers, hot-mix plant and other equipment, necessary for completion of the work, complete in all respects as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 62.02
2) Road ID:D49-R12.A- Qunatity = 186.04
3) Road ID:SOS Village- Qunatity =40.10
4) Road ID:D49-R16.A- Qunatity =28.02
5) Road ID:D49-R19.A- Qunatity =34.96
6) Road ID:D49-R18.A- Qunatity =23.10
7) Road ID:D49-R05.A- Qunatity =33.26
8) Road ID:D49-R04.A- Qunatity = 34.70
9) Road ID:D49-R13.A- Qunatity = 19.98
10) Road ID:D49-R11.A- Qunatity = 34.38
11) Road ID:D49-R06.A- Qunatity = 41.45
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 161.14
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 237.76
Total Quanity =952.26 Cubic Meters | 936.91 | cum | 13,767.73 | ₹1,28,99,055.08 |
| 6 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision)
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity =20.68
2) Road ID:D49-R12.A- Qunatity = 62.02
3) Road ID:SOS Village- Qunatity =13.36
4) Road ID:D49-R16.A- Qunatity = 9.34
5) Road ID:D49-R19.A- Qunatity =11.65
6) Road ID:D49-R18.A- Qunatity =7.70
7) Road ID:D49-R05.A- Qunatity =11.09
8) Road ID:D49-R04.A- Qunatity =11.57
9) Road ID:D49-R13.A- Qunatity = 6.66
10) Road ID:D49-R11.A- Qunatity = 11.46
11) Road ID:D49-R06.A- Qunatity = 13.82
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 53.71
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 79.25
Total Quanity =317.42 Cubic Meters | 312.31 | cum | 2,727.99 | ₹8,51,964.92 |
| 7 | Crack Filling : Filling of crack using slow curing bitumen emulsion and applying crusher dust in case crack are wider then 3 mm.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity =38.60
2) Road ID:D49-R12.A- Qunatity = 108.08
3) Road ID:SOS Village- Qunatity =24.96
4) Road ID:D49-R16.A- Qunatity =17.44
5) Road ID:D49-R19.A- Qunatity =21.76
6) Road ID:D49-R18.A- Qunatity =14.38
7) Road ID:D49-R05.A- Qunatity =36.24
8) Road ID:D49-R04.A- Qunatity = 18.90
9) Road ID:D49-R13.A- Qunatity = 12.44
10) Road ID:D49-R11.A- Qunatity = 21.40
11) Road ID:D49-R06.A- Qunatity = 18.06
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 187.24
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 148.00
Total Quanity =676.42 Running Meters | 667.5 | rm | 4.58 | ₹3,057.15 |
| 8 | Painting one coat with synthetic enamel paint of approved make and shade on any elevation of road kerbs, parapets and guard posts, including preparation of the surface, cleaning, removal of dirt, dust and loose material, application of paint uniformly to the required finish, and including the cost of all paints, materials, labour, tools and equipment, scaffolding/ladders wherever required to complete in all respects as per the Technical Specifications and Clause 803 of MoRT&H Specifications for Road and Bridge Works (5th Revision) and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 173.70
2) Road ID:D49-R12.A- Qunatity = 486.36
3) Road ID:SOS Village- Qunatity =112.32
4) Road ID:D49-R16.A- Qunatity =156.96
5) Road ID:D49-R19.A- Qunatity =195.84
6) Road ID:D49-R18.A- Qunatity =129.42
7) Road ID:D49-R05.A- Qunatity =0.00
8) Road ID:D49-R04.A- Qunatity = 0.00
9) Road ID:D49-R13.A- Qunatity = 55.98
10) Road ID:D49-R11.A- Qunatity = 192.60
11) Road ID:D49-R06.A- Qunatity = 162.54
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 842.58
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 666.00
Total Quanity =3214.44 Square Meters | 3,174.3 | sqm | 87.43 | ₹2,77,529.05 |
| 9 | Painting one coat with synthetic enamel paint on iron surface including preparation of the surface, cleaning, removal of dirt, dust and loose material, application of paint uniformly to the required finish, and including the cost of all paints, materials, labour, tools and equipment, scaffolding/ladders wherever required to complete in all respects as per the Technical Specifications and Clause 803 of MoRT&H Specifications for Road and Bridge Works (5th Revision) and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 0.00
2) Road ID:D49-R12.A- Qunatity = 0.00
3) Road ID:SOS Village- Qunatity = 0.00
4) Road ID:D49-R16.A- Qunatity = 0
5) Road ID:D49-R19.A- Qunatity = 0
6) Road ID:D49-R18.A- Qunatity = 0
7) Road ID:D49-R05.A- Qunatity = 0
8) Road ID:D49-R04.A- Qunatity = 0
9) Road ID:D49-R13.A- Qunatity =186.60
10) Road ID:D49-R11.A- Qunatity = 0.00
11) Road ID:D49-R06.A- Qunatity = 0.00
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 2808.60
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 2220.00
Total Quanity =5215.20 Square Meters | 5,215.2 | sqm | 48.8 | ₹2,54,501.76 |
| 10 | Supplying, fitting and fixing MS hollow square welded section median railing having iron outer frame with vertical posts of size 50 mm × 50 mm × 3 mm and internal vertical members of size 25 mm × 25 mm × 3 mm, made of ISI-marked standard MS sections of approved thickness and quality from approved manufacturers, including cutting, mending to required sizes, welding and all required iron fittings, fixtures and accessories, including cost, conveyance and taxes of all materials, labour, T&P and all incidental charges, complete in all respects as per Drawing/Design attached with the estimate, Technical Specifications and as directed by the Engineer-in-Charge.
ROAD WISE QUANTITY DEATILS
1) Road ID:D49-R07 A.A- Qunatity = 0.00
2) Road ID:D49-R12.A- Qunatity = 0.00
3) Road ID:SOS Village- Qunatity = 0.00
4) Road ID:D49-R16.A- Qunatity = 0.00
5) Road ID:D49-R19.A- Qunatity = 0.00
6) Road ID:D49-R18.A- Qunatity = 0.00
7) Road ID:D49-R05.A- Qunatity = 0.00
8) Road ID:D49-R04.A- Qunatity = 0.00
9) Road ID:D49-R13.A- Qunatity = 223.92
10) Road ID:D49-R11.A- Qunatity = 0.00
11) Road ID:D49-R06.A- Qunatity = 0.00
12) Road ID:Int. Road Baramunda Housing Board - Qunatity = 3370.32
13) Road ID:Int. Road E & F type Qtr at Baramunda - Qunatity = 0.00
14) Road ID: D-49-R01.A - Qunatity = 26640.00
Total Quanity =30234.20 Kilogram | 30,234.24 | kg | 72.7 | ₹21,98,029.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.06 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_609693.xls
BOQ • 0.33 MB
4944C.pdf
PDF • 0.62 MB
C4910.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .