Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L Quoted ₹16.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.9 LRejected-Finance | ₹16.9 L | L2 | Rejected-Finance Second Less Amount |
| Sl No | Description | Qty | Unit | RP RAVENDRAN L1 | K.Moorthy L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the Road from AO Road to Nedumbuli Eswaran Koil KM 0/0-0/490 (R-222) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 144 | Sqm | 6 ₹864 | 6 ₹864 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 200 | Sqm | 23 ₹4,600 | 23.2 ₹4,640 |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 36 | Cum | 140 ₹5,040 | 140.45 ₹5,056 |
| 5.00 | collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. | 22.5 | Cum | 146 ₹3,285 | 146.17 ₹3,289 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 75 | Cum | 2,907 ₹2.2 L | 2,907.73 ₹2.2 L |
| 7.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 600 | Sqm | 86.18 ₹51,708 | 86.18 ₹51,708 |
| 8.00 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 600 | Sqm | 20.11 ₹12,066 | 20.11 ₹12,066 |
| 9.00 | Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller) | 15 | Cum | 11,728.42 ₹1.8 L | 11,728.42 ₹1.8 L |
| 10.00 | Construction of Unreinforment dowel jointed at expansion and construction joints only plain cc pavement thickness as per design over a prepared sub base with 43 grade cement | 130.5 | cum | 7,259.86 ₹9.5 L | 7,259.86 ₹9.5 L |
Tender Value
₹17.0 L
EMD Value
₹17,020
Closing Date
7 Jan 2026, 3:00 pmClosed
The President
The President Panchayat Office Nedumbuli
Strengthening of the Road from AO Road to Nedumbuli Eswaran Koil KM 0/0-0/490 (R-222)
2026_RDTN_639958_1
A3/2972/2025
Open Tender
Civil Works
Panchayat Office Nedumbuli
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,020
Yes
9 Jan 2026
7 Jan 2026
7 Jan 2026
7 Jan 2026
7 Jan 2026
7 Jan 2026
Amount
Strengthening of the Road from AO Road to Nedumbuli Eswaran Koil KM 0/0-0/490 (R-222)
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller)
Construction of Unreinforment dowel jointed at expansion and construction joints only plain cc pavement thickness as per design over a prepared sub base with 43 grade cement
Bituman Pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Moorthy (BID ID -1556033)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_766217.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid