Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LRejected-Finance | ₹3.9 L | L1 | Rejected-Finance - |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | VCP Constructions L1 | CHINNAMUTHU L2 |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding using 15cm dia blue-gum posts of 4.0m overall length (3M HT + 0.5M projection + 0.5m into ground) the distance between two rows being 1.25m and the spacing of postsbeling 2.0m and the spacing of postsbeling 2.0m in both the rows with two horizontal posts with 0.5m overlap on either sideand braces at 2m c/cincluding longitudinal and transverse middle braces to step up and providing aplatform with country woodplanksof 40mm tk & 1.0m width in a complete form using coir and Nails For OHT Renovation Works. - First level @ 3.00 M above G.L | 26.69 | Rm | 9,341.5 ₹9,341.50 | 10,676 ₹10,676 |
| 2.00 | Second level @ 5.50 M above G.L | 26.69 | Rm | 16,360.97 ₹16,360.97 | 17,348.5 ₹17,348.50 |
| 3.00 | Third level @ 8.00 M above G.L | 26.69 | Rm | 23,380.44 ₹23,380.44 | 23,487.2 ₹23,487.20 |
| 4.00 | Fourth level @ 10.50 M aboveG.L | 26.69 | Rm | 30,399.91 ₹30,399.91 | 30,693.5 ₹30,693.50 |
| 5.00 | Fifth level @ 13.00 M aboveG.L | 26.69 | Rm | 37,446.07 ₹37,446.07 | 37,632.9 ₹37,632.90 |
| 6.00 | Painting two coats with ready mixed Exterior Plastic Emulsion Paint S.I.358 Plastic emulison paint of'approved quality and colour over a priming coat, including thorough scraping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A- 0.90Lk Ltr OHT-column | 535 | M2 | 1,33,750 ₹1.3 L | 1,39,100 ₹1.4 L |
| 7.00 | Supply and Delivery of Three Phase 7.5HP Open well Submersible Motor with 50Lpm and 100 M Head (14220 / 2002) ,Cost including material,conveyannce and all other Incidental Charges Etc,Complete. | 2 | No | 1,15,964 ₹1.2 L | 1,16,000 ₹1.2 L |
| 8.00 | Supply and Delivery of 6Sq.mm Pvc Insulated 3 core Copper Flat Cable (IS 694/1990),Cost including material,conveyannce and all other Incidental Charges Etc,Complete. | 100 | Rm | 28,200 ₹28,200 | 29,000 ₹29,000 |
Tender Value
Refer Docs
EMD Value
₹4,750
Closing Date
27 Mar 2025, 3:00 pmClosed
Executive Officer, Sithayankottai Town Panchayat
Sithayankottai Town Panchayat
Repairs and Maintenance for Existing 0.90Lakh Litre OHT at Town Panchayat Office Premisses and and Supply of 7.5HP Open well Submersible motor 2Nos in Sithayankottai Town Panchayat
2025_DTP_535542_1
35/2025
Open Tender
Civil Works - Water Works
90 days
Sithayankottai
Class 1
2 documents required · 2 mandatory
₹860
Yes
₹4,750
12 Feb 2026
26 Mar 2025
27 Mar 2025
26 Mar 2025
27 Mar 2025
26 Mar 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid