Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.4 L+₹15,024.28 (1.46%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹11.1 L+₹84,229.05 (8.21%)Rejected-AOC | L3 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | M.K.Construction L2 | N.S CONSTRUCTION L3 | BEEMJI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Vellore District Construction of RCC Slab Culvert at K.Mottur, Arunthathiyar Burial Ground Road (Near Muniswaran Koil) in Kallapadi Panchayat of Gudiyatham Block General Fund 2025-26 Package No 17 | ||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 93.24 | Cu.m | 235.43 ₹21,951.49 | 251.08 ₹23,410.7 | 200 ₹18,648 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete | 11.66 | Cu.m | 4,952.91 ₹57,750.93 | 5,282.24 ₹61,590.92 | 4,950 ₹57,717 Lowest |
| 4.00 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 153.29 | Sq.m | 493.26 ₹75,611.83 | 526.06 ₹80,639.74 | 250 ₹38,322.5 Lowest |
| 5.00 | Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc. | 40.7 | Sq.m | 986.52 ₹40,151.36 | 1,052.11 ₹42,820.88 | 250 ₹10,175 Lowest |
| 6.00 | cement concrete 1: 3 : 6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 96.82 | Cu.m | 5,266.01 ₹5,09,855.09 Lowest | 5,616.16 ₹5,43,756.61 | 6,150 ₹5,95,443 |
| 7.00 | cement concrete 1: 2 : 4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 3.9 | Cu.m | 6,281.57 ₹24,498.12 | 6,699.24 ₹26,127.04 | 6,050 ₹23,595 Lowest |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete | 0.9 | MTs. | 85,945.13 ₹77,350.62 | 91,659.81 ₹82,493.83 | 82,000 ₹73,800 Lowest |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete | 8.1 | Cu.M | 8,593.95 ₹69,611 | 9,165.38 ₹74,239.58 | 6,000 ₹48,600 Lowest |
| 10.00 | Provision for Name board | 1 | No | 4,297.5 ₹4,297.5 | 4,583.25 ₹4,583.25 | 2,000 ₹2,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
26 Sept 2025, 3:00 pmClosed
The Block Development Officer Gudiyatham
The Block Development Office Gudiyatham
Vellore District Construction of RCC Slab Culvert at K.Mottur, Arunthathiyar Burial Ground Road (Near Muniswaran Koil) in Kallapadi Panchayat of Gudiyatham Block General Fund 2025-26 Package No 17
2025_RDTN_605529_1
A2/2777/2025 GUD SEP 43-25
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,000
27 Nov 2025
18 Sept 2025
26 Sept 2025
18 Sept 2025
26 Sept 2025
18 Sept 2025
Amount
Vellore District Construction of RCC Slab Culvert at K.Mottur, Arunthathiyar Burial Ground Road (Near Muniswaran Koil) in Kallapadi Panchayat of Gudiyatham Block General Fund 2025-26 Package No 17
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost andincluding cost and conveyance of all materials to site and all labour charges etc complete
Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc.
Supply and Errecting Centering pavement sides including cost and conveyanceof all materials to work site and all labour charges etc.
cement concrete 1: 3 : 6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
cement concrete 1: 2 : 4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming etc Complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal includingcost and conveyance of all materials to site and all labour for etc Complete
Provision for Name board
Provision for Photo Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.K.Construction (BID ID -1466349)
N.S CONSTRUCTION (BID ID -1467920)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_723811.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .