Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.8 Cr+₹1.1 Cr (16.9%)Admitted-Finance 123 B CENTRAL AVENUE SAINIK FARMS SOUTH DELHI DELHI 110062 | SOUTH DELHI | DELHI | 110062 | ₹7.8 Cr+₹1.1 Cr (16.9%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 Cr+₹1.2 Cr (17.4%)Admitted-Finance 2 11 SADAR BAZAR DELHI CANTT 110010 | DELHI | NEW DELHI | DELHI | 110010 | ₹7.9 Cr+₹1.2 Cr (17.4%) | L3 | Admitted-Finance |
| 4 | L4₹8.4 Cr+₹1.6 Cr (24.5%)Admitted-Finance | ₹8.4 Cr+₹1.6 Cr (24.5%) | L4 | Admitted-Finance |
| 5 | L5₹9.0 Cr+₹2.3 Cr (33.8%)Admitted-Finance | ₹9.0 Cr+₹2.3 Cr (33.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s VINOD KUMAR SHARMA L4 | M/s Innovative Coolings and Constructions L1 | Beant Construction Co Pvt Ltd L6 | Third Wave Services Pvt Ltd L2 | Megha Construction Co. L3 | Sachdeva Builders L5 | M/S GDR CONSTRUCTIONS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||||
| 1.01 | Design and Build of tech building for E-MMS four storeyed (G+3) with permanent specifications, including RCC domestic water tank, fire fighting tank of 12600 litres in total at terrace and underground sump cum fire pump house of 50,000 litre capacity, ramp etc complete all as specified and shown on drawings. | 1 | Lump sum | 5,46,00,000 ₹5,46,00,000 | 4,30,00,000 ₹4,30,00,000 Lowest | 6,00,00,000 ₹6,00,00,000 | 4,85,00,000 ₹4,85,00,000 | 4,95,00,000 ₹4,95,00,000 | 5,69,00,000 ₹5,69,00,000 | 5,74,00,000 ₹5,74,00,000 |
| 2.00 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 4,55,000 ₹4,55,000 | 5,14,583.64 ₹5,14,583.64 | 4,50,000 ₹4,50,000 | 3,75,000 ₹3,75,000 Lowest | 5,00,000 ₹5,00,000 | 4,29,000 ₹4,29,000 | 6,50,000 ₹6,50,000 |
| 2.01 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 83,000 ₹83,000 | 76,370.72 ₹76,370.72 Lowest | 79,000 ₹79,000 | 93,500 ₹93,500 | 80,000 ₹80,000 | 85,000 ₹85,000 | 1,50,000 ₹1,50,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 21,09,120 ₹21,09,120 | 19,75,883.46 ₹19,75,883.46 Lowest | 24,00,000 ₹24,00,000 | 22,95,000 ₹22,95,000 | 25,00,000 ₹25,00,000 | 24,69,000 ₹24,69,000 | 35,00,000 ₹35,00,000 |
| 2.03 | Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS & CULVERT" as listed in Schedule ‘A’ Part V | 1 | Lump sum | 27,30,120 ₹27,30,120 | 23,11,351.74 ₹23,11,351.74 Lowest | 29,00,000 ₹29,00,000 | 36,90,000 ₹36,90,000 | 35,00,000 ₹35,00,000 | 36,69,000 ₹36,69,000 | 35,00,000 ₹35,00,000 |
| 2.04 | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VI | 1 | Lump sum | 70,000 ₹70,000 | 66,170.07 ₹66,170.07 Lowest | 67,000 ₹67,000 | 1,10,000 ₹1,10,000 | 80,000 ₹80,000 | 69,000 ₹69,000 | 1,25,000 ₹1,25,000 |
| 2.05 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part VII | 1 | Lump sum | 1,60,000 ₹1,60,000 Lowest | 1,73,048.85 ₹1,73,048.85 | 1,75,000 ₹1,75,000 | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 | 1,69,000 ₹1,69,000 | 2,00,000 ₹2,00,000 |
| 2.06 | Lump sum price worked out by the Contractor for “AREA DRAINAGE WORKS ” as listed in Schedule ‘A’ Part VIII | 1 | Lump sum | 5,80,000 ₹5,80,000 | 5,53,813.52 ₹5,53,813.52 Lowest | 6,60,000 ₹6,60,000 | 6,99,000 ₹6,99,000 | 7,00,000 ₹7,00,000 | 6,49,000 ₹6,49,000 | 8,00,000 ₹8,00,000 |
| 2.07 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY WORKS” as listed in Schedule ‘A’ Part IX | 1 | Lump sum | 13,00,000 ₹13,00,000 Lowest | 14,07,559.9 ₹14,07,559.9 | 15,00,000 ₹15,00,000 | 16,00,000 ₹16,00,000 | 18,00,000 ₹18,00,000 | 14,00,000 ₹14,00,000 | 16,50,000 ₹16,50,000 |
Tender Value
₹5.2 Cr
EMD Value
₹5.8 L
Closing Date
25 Aug 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
PROVN OF BUILDING AND ALLIED SERVICES FOR E-MMS AT SUBROTO PARK, DELHI CANTT (BUILDING/STRUCTURE ON DESIGN AND BUILD MODE)
2026_MES_757525_2
CEWAC/PAL/T-25/2025-26
Open Tender
Civil Works
Lump-sum
540 days
GE (P) (AF) PALAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹3,000
GE (P) (AF) PALAM
₹5.8 L
Yes
8 Sept 2026
28 Jul 2026
27 Aug 2026
28 Jul 2026
25 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| - | Design and Build of tech building for E-MMS four storeyed (G+3) with permanent specifications, including RCC domestic water tank, fire fighting tank of 12600 litres in total at terrace and underground sump cum fire pump house of 50,000 litre capacity, ramp etc complete all as specified and shown on drawings. | 1 | Lump sum | - | - |
| 2 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 4,28,819.7 | ₹4,28,819.7 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY WORKS" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 76,370.72 | ₹76,370.72 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 24,69,854.32 | ₹24,69,854.32 |
| - | Lump sum price worked out by the Contractor for “ROAD, PATH AND HARDSTANDING WORKS & CULVERT" as listed in Schedule ‘A’ Part V | 1 | Lump sum | 28,89,189.68 | ₹28,89,189.68 |
| - | Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY WORKS” as listed in Schedule ‘A’ Part VI | 1 | Lump sum | 66,170.07 | ₹66,170.07 |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL WORKS” as listed in Schedule ‘A’ Part VII | 1 | Lump sum | 1,73,048.85 | ₹1,73,048.85 |
| - | Lump sum price worked out by the Contractor for “AREA DRAINAGE WORKS ” as listed in Schedule ‘A’ Part VIII | 1 | Lump sum | 6,51,545.32 | ₹6,51,545.32 |
| - | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY WORKS” as listed in Schedule ‘A’ Part IX | 1 | Lump sum | 14,07,559.9 | ₹14,07,559.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tender.pdf
Tender Documents • 23.22 MB
BOQ_875165.xls
BOQ • 0.54 MB
drawings.pdf
Additional Documents • 10.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .