| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 Cr+₹22.6 L (5.20%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹4.6 Cr+₹22.6 L (5.20%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 5 107 D1 MEENAKSHI NAGAR 4 STREET A SALAIPUDUR KOVILPATTI 628 502 | KOVILPATTI | TIRUNELVELI | TAMIL NADU | 628502 | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | H.Venkateswaran L1 | JD ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Fabrication, galvanishing and supply of various type of normal, narrow base tower & extension tower parts, tower body/leg extension complete (excluding bolts, nuts and stubs)and including transport charge, hangers,d-shackles and all taxes etc complete as per standard specification GI Tower parts MS | 55.6 | MT | 1,10,000 ₹61,16,000 Lowest | 1,11,000 ₹61,71,600 |
| 2.00 | Supply of Hot dipped hexaganal GI bolts&Nuts, including step bolts, packing washers and electro galvanished spring washers as per relevent latest IS including transport charge and all taxes etc completeas per standard specification. | 5.4 | MT | 1,20,000 ₹6,48,000 Lowest | 1,20,500 ₹6,50,700 |
| 3.00 | Supply of ACSR Zebra conductor as per latest standard IS | 28.2 | km | 4,90,000 ₹1,38,18,000 Lowest | 5,00,000 ₹1,41,00,000 |
| 4.00 | Supply of 120 KN Polymer insulator suitable for Zebra conducot as per latest standard IS | 138 | Nos | 5,000 ₹6,90,000 Lowest | 5,500 ₹7,59,000 |
| 5.00 | Supply of 90 KN Polymer insulator suitable for Zebra conducot as per latest standard IS | 48 | Nos | 5,000 ₹2,40,000 Lowest | 5,500 ₹2,64,000 |
| 6.00 | Supply of 48 fibre OPGW cable including all accessoried and fittings. | 4.7 | kms | 3,50,000 ₹16,45,000 Lowest | 3,55,000 ₹16,68,500 |
| 7.00 | Single suspension fittings for Zebra | 48 | sets | 2,500 ₹1,20,000 | 2,000 ₹96,000 Lowest |
| 8.00 | Single Tension fittings for Zebra | 114 | sets | 3,000 ₹3,42,000 | 2,400 ₹2,73,600 Lowest |
| 9.00 | Double Tension fittings for Zebra | 12 | sets | 6,000 ₹72,000 | 5,000 ₹60,000 Lowest |
| 10.00 | Mid span compression joint for Zebra | 5 | sets | 1,000 ₹5,000 | 600 ₹3,000 Lowest |
Tender Value
₹3.4 Cr
EMD Value
₹2.7 L
Closing Date
8 Jul 2025, 2:00 pmClosed
CE TP1 CHN
Guindy 230kV GIS SS campus, Chennai - 32
Replacement of damaged tower, OPGW cable and conductor from Loc 41 to 60 in the existing NCTPS Tondiapet I II 230 KV feeder Reach 3
2025_EB_574564_1
TP1-40/2025-26 of CE/TP1/CHN
Open Tender
Civil Works - Others
Works
180 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.7 L
6 Aug 2025
27 Jun 2025
9 Jul 2025
27 Jun 2025
8 Jul 2025
27 Jun 2025
Amount
Fabrication, galvanishing and supply of various type of normal, narrow base tower & extension tower parts, tower body/leg extension complete (excluding bolts, nuts and stubs)and including transport charge, hangers,d-shackles and all taxes etc complete as per standard specification GI Tower parts MS
Supply of Hot dipped hexaganal GI bolts&Nuts, including step bolts, packing washers and electro galvanished spring washers as per relevent latest IS including transport charge and all taxes etc completeas per standard specification.
Supply of ACSR Zebra conductor as per latest standard IS
Supply of 120 KN Polymer insulator suitable for Zebra conducot as per latest standard IS
Supply of 90 KN Polymer insulator suitable for Zebra conducot as per latest standard IS
Supply of 48 fibre OPGW cable including all accessoried and fittings.
Single suspension fittings for Zebra
Single Tension fittings for Zebra
Double Tension fittings for Zebra
Mid span compression joint for Zebra
Repair sleeves for Zebra
Vibration damper for Zebra
PA Rod for Zebra
Supply of Number plate
Supply of Danger Board
Supply of Phase plate
Supply of Circuit plate
Clearing heavy jungle for surveying including cost of all materials, leads, lifts etc., complete.
Forming approach road by filling with good quality earth / quarry rubbish over slushy soil including cost of materials , transport charges all labour lead and lift etc. complete.
Earth work open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead upto 10m in hard stiff clay, stiff black cotton, hard red earth, shales, murram,gravel, stoney earth anmd earth mixed with small size boulders and hard gravelly soil. For first depth of 2 m
Earth work open well excavation complying with relevant clauses of T.N.D.S.S. well sinking and with lead upto 10m in hard stiff clay, stiff black cotton, hard red earth, shales, murram,gravel, stoney earth anmd earth mixed with small size boulders and hard gravelly soil. For depth of 2 to 4 m
Supply and erection of well rings for Rain water harvesting, foundation pit and Soak pit each measuring 0.3m in depth for a depth of 3.45 m - 2.4m inner dia
Assembling of stub, cleat and template including supply, transport, assembling and shifting template from location to location and reassembling including cost of all materials, fabrication charges, lead, lift, labour, etc., complete as directed.
PCC 1:2:4 using 12 to 20mm HB Stone for foundation without form work including cost of cement all materials labour etc., complete.
PCC 1:2:4, with 20 mm HBG metal for the tower foundation including cost of all material lead, lift etc., complete.With form box for muffing and coping
Labour for installation of Pipe type earthing for towers including transport charges, drilling charges, cost of all T&P, labour, lead, lift etc., complete, as directed.Pipe type earthing
Plastering with cement mortar 1:5, 12mm thick including cost of all materials, labour, lead, lift, etc., complete as directed by the Department Engineer at site.
Transport & erection of various type of towers, tower extension (complete) including tack welding of bolts & nuts, supply of zinc rich primer, enamel paint and application of one coat of zinc rich primer and two coats of zinc rich enamel paint over the welded portion as per technical specification and as directed by the Engineer
Labour charges for Transporting and hoisting of 120 kN Antifog Single tension polymerinsulators of 14 units under LC condition including cost of all labour, lead, lift etc. complete. Under LC condition
Labour charges for Transporting and hoisting of 90 kN Antifog Single tension polymer insulators of 13 units under LC condition including cost of all labour, lead, lift etc. complete. Under LC condition
Installation of insulator strings complete with arcing horns & necessary hardware, stringing of 6nos of Zebra conductor (2 circuites) including all Labour charges for transporting and paying out, jointing, rough sagging, tensioning, clipping, providing vibration dampers including giving jumper connections for lead lift etc., complete as directed by the Engineer in charge with safety and precaution under L.C condition
Installation & stringing of 1 OPGW 48 fibre cable including fixing of hardware fittings and accessories etc., complete
Providing tack welding of all the bolts & nuts (at least 3 places in erected towers from GL to X-arm bottom level including painting of welded portion with two coats of best quality of cold galvanised paint having at least 90% zinc content and approved by the engineer at site including cost of paint andall other materials lead lift etc complete
Strengthening of damaged tower legs with new absolute angles and welding continously and labour for fabrication erection galvanising wth all labour lead lift etc complete
Arranging and availing shutdown on LT / HT lines for stringing operation including cost of all lead and lift etc. complete.
Hire charges for engaging JCB for road making and levelling undulations for transport of Conductor drum etc. complete.
Providing well supported trussels up to 5m height for road crossing including cost of all materials labour, lead, lift etc complete as directed by the engineer at site.
Back filling the area enclosed by revetment as per specification
Hot line stringing for NH crossing including cost of all materials labour, lead, lift etc complete as directed by the engineer at site.
Labour charges for dismantling of existing tower including all labour, lift, etc complete
labour Charges for Dismantling of Kundah conductors 6 Nos under L.C condition
Labour charges for dismantling OPGW cable under LC condition.
Dismantling the insulator string including cost of labour for releasing, Tools and plants transporting charges from site etc complete for 14 units of 120 KN Disc Insulators
Dismantling the insulator string including cost of labour for releasing, Tools and plants transporting charges from site etc complete for 13 units of 90 KN Disc Insulators
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
JD ENTERPRISES (BID ID -1394958)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .