| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹27.1 L (25.1%)Admitted-Finance TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | ₹1.4 Cr+₹27.1 L (25.1%) | L2 | Admitted-Finance |
| 3 | L2₹1.4 Cr+₹27.1 L (25.1%)Admitted-Finance | ₹1.4 Cr+₹27.1 L (25.1%) | L2 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | P and A Ecotech Solutions L2 | OM SOLAR SOLUTIONS L2 | MAA SHARDA CIVILTECH PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00Competitive Items- Removing and Installation of the following existing Solar System | ||||||
| 1.01 | Supply ,Installation, testing and Commissioning and Maintenance for 5 Years (Including DLP Period) of on grid photovoltaic power plant conforming MNRE specification as amended consisting of mono/poly crystalline silicon solar cells, net metering facility ,necessary protection, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required All Complete.
a)Solar photovoltaic modules of capacity 330Wp or above, manufactured in India confirming IS 14286/IEC 61215.IS/IEC 61730-Part-1,IS/IEC 61730
Part-2.Solar photovoltaic module conversion efficiency shall not be less than 16.5%.PV modules used in solar power plant/system must be warranted for their output peak watt capacity ,which should not be less than 90% at the end of 10 year and 80% at the end of 25 years.
b)Power conditioning unit(PCU) of which 350-800V DC input voltage range and 400V AC ,three phase,4 wires,50Hz +/- 2.5 Hz,output voltage suitable to generate AC power with efficiency not less than 97%,total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit Grid Voltage Frequency. C) Data Monitoring system complete with accessories. D) Fixing of array junction Box and Main Junction Box with IP65/66 protection and termination arrangement for incoming and outgoing cable along with glands, Lugs and other accessories etc.as required. E) Lighting and surge voltage protection. f)Connections and Interconnections by Supplying and fixing of required size XLPE insulated copper conductor 1.1KV grade armored power and control cable between solar modules, main power cable grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc.as required. g)Fabriation as per site requirement in appropriate size of MS Angle. h) Dry type appropriate KVA of transformer step UP along with all protections, Switchgears VCB, cables etc. • The contractor must take approval/NOC from the concerned distribution license fir the connectivity, technical feasibility and synchronising of project with distribution network and submit the same to USCL. • Reverse power relay shall be provided by contractor. • No extra payment shall be made for the said work.
Existing:
400.00 KWP
Proposed Reinstallation:
200.00 KWP
100.00 KWP
100.00 KWP | 1 | Lumpsum | 1,35,00,000 ₹1,35,00,000 | 1,35,00,000 ₹1,35,00,000 | 1,07,92,000 ₹1,07,92,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
18 Jan 2025, 5:00 pmClosed
ED
Mela Karyalay, Kothi Road, Ujjain Smart City office
Relocation of Existing Solar System 400 KW on Government Buildings, Ujjain Madhya Pradesh 3rd Call
2025_UAD_392969_1
USCL/363
Open Tender
Miscellaneous Works
Lump-sum
Ujjain
Please refer Tender documents.
3 documents required · 3 mandatory
₹12,500
₹1.5 L
Ujjain
14 May 2025
3 Jan 2025
20 Jan 2025
3 Jan 2025
18 Jan 2025
3 Jan 2025
3 Jan 2025 - 10 Jan 2025
10 Jan 2025
Amount
Competitive Items- Removing and Installation of the following existing Solar System
Supply ,Installation, testing and Commissioning and Maintenance for 5 Years (Including DLP Period) of on grid photovoltaic power plant conforming MNRE specification as amended consisting of mono/poly crystalline silicon solar cells, net metering facility ,necessary protection, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required All Complete. a)Solar photovoltaic modules of capacity 330Wp or above, manufactured in India confirming IS 14286/IEC 61215.IS/IEC 61730-Part-1,IS/IEC 61730 Part-2.Solar photovoltaic module conversion efficiency shall not be less than 16.5%.PV modules used in solar power plant/system must be warranted for their output peak watt capacity ,which should not be less than 90% at the end of 10 year and 80% at the end of 25 years. b)Power conditioning unit(PCU) of which 350-800V DC input voltage range and 400V AC ,three phase,4 wires,50Hz +/- 2.5 Hz,output voltage suitable to generate AC power with efficiency not less than 97%,total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit Grid Voltage Frequency. C) Data Monitoring system complete with accessories. D) Fixing of array junction Box and Main Junction Box with IP65/66 protection and termination arrangement for incoming and outgoing cable along with glands, Lugs and other accessories etc.as required. E) Lighting and surge voltage protection. f)Connections and Interconnections by Supplying and fixing of required size XLPE insulated copper conductor 1.1KV grade armored power and control cable between solar modules, main power cable grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc.as required. g)Fabriation as per site requirement in appropriate size of MS Angle. h) Dry type appropriate KVA of transformer step UP along with all protections, Switchgears VCB, cables etc. • The contractor must take approval/NOC from the concerned distribution license fir the connectivity, technical feasibility and synchronising of project with distribution network and submit the same to USCL. • Reverse power relay shall be provided by contractor. • No extra payment shall be made for the said work. Existing: 400.00 KWP Proposed Reinstallation: 200.00 KWP 100.00 KWP 100.00 KWP
OM SOLAR SOLUTIONS (BID ID -1177165)
P and A Ecotech Solutions (BID ID -1177281)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .