Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.1 Cr
EMD Value
₹7.8 L
Closing Date
22 Oct 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer Deoria Circle PWD Deoria
Office of The Superintending Engineer Deoria Circle PWD Deoria
Construction of a multi-story building comprising four Type-3 residential units for Junior Engineers in Kushinagar district
2026_CEGKP_1195481_2
4607/76yat-Deo Circle/26 Dated 01.10.2026
Open Tender
Civil Works - Buildings
Percentage
270 days
Kushinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹7.8 L
Deoria
12 Oct 2026
12 Oct 2026
22 Oct 2026
12 Oct 2026
22 Oct 2026
12 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of Foundation- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 369.81 | CUM | 176.01 | ₹65,091.89 |
| 2 | Sand Filling- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 44.13 | CUM | 1,436.08 | ₹63,374.35 |
| 3 | PCC Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 60.23 | CUM | 4,606.27 | ₹2,77,435.91 |
| 4 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | 282.24 | SQM | 209.66 | ₹59,174.1 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Ground Floor UP TO PLINTH | 18.45 | CUM | 6,116.74 | ₹1,12,853.85 |
| 6 | ABOVE PLINTH | 4.69 | CUM | 7,780.02 | ₹36,488.28 |
| 7 | First floor | 1.88 | CUM | 7,780.02 | ₹14,626.43 |
| 8 | Mumty Floor | 0.18 | CUM | 7,780.02 | ₹1,400.4 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Ground Floor | 40.39 | CUM | 7,780.02 | ₹3,14,234.88 |
| 10 | First floor | 40.39 | CUM | 7,780.02 | ₹3,14,234.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.03 MB
Tendernotice_2.pdf
PDF • 2.43 MB
BOQ_2257665.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .