Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 CrAccepted-AOC | ₹37.7 Cr | L1 | Accepted-AOC S V CONSTRUCTIONS L1 |
| 2 | L2₹39.9 CrRejected-Finance | ₹39.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹46.7 CrRejected-Finance 7 A PUNJABI BAGH RAISEN ROAD GOVINDPURA BHOPAL M P | RAISEN | MADHYA PRADESH | 462046 | ₹46.7 Cr | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹23 L
Closing Date
5 Apr 2021, 2:00 pmClosed
Chief Engineer
Chief Engineer Indira Sagar Project (Canals) Sanawad Distt.Khargone
GHAT and ALLIED WORKS DISTRICT SEHORE, GROUP-I details as per scope of work
2021_NVDA_133109_1
03 /G/2020-21
Open Tender
Civil Works - Others
730 days
Sehore
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
₹23 L
Yes
Bhopal
25 Jun 2021
5 Mar 2021
6 Apr 2021
5 Mar 2021
5 Apr 2021
5 Mar 2021
22 Mar 2021
Amount
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-I: Construction of (i) Ghat, RCC Retaining Wall and RCC Approach Road at Village Dehri, Kusumkheda, Narayanpur & Hathnora (ii) Ghat, RCC Retaining Wall, Approach Road & Nalla Training with Channel Construction at Village-Nandner including detail Survey and investigation with expert suggestion design and drawings with vetting from NIT/IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to compete entire work in24 months including maintenance of all structures for 3 years after completion as directed by Engineer-in-Charge.
GHAT & ALLIED WORKS DISTRICT SEHORE, GROUP-I: Construction of (i) Ghat, RCC Retaining Wall and RCC Approach Road at Village Dehri, Kusumkheda, Narayanpur & Hathnora (ii) Ghat, RCC Retaining Wall, Approach Road & Nalla Training with Channel Construction at Village-Nandner including detail Survey and investigation with expert suggestion design and drawings with vetting from NIT/IIT. Supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to compete entire work in24 months including maintenance of all structures for 3 years after completion as directed by Engineer-in-Charge.
Rajendra Singh Kiledar Constructions Pvt. Ltd. Betul (M.P.)
M/S SHAPERS CONSTRUCTIONS LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid