Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.4 L+₹3,157.36 (0.15%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | NACHIYAR ENTERPRISES L2 | SARATHA & CO L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of the Thirupathur- Managiri Road to Melakadu Road KM 0/0 -0/450 | |||||
| 2.00 | Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of service | 486 | M2 | 6 ₹2,916 | 5.94 ₹2,886.84 Lowest |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 162 | M3 | 132 ₹21,384 | 131 ₹21,222 Lowest |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | 54 | M3 | 647 ₹34,938 | 646.4 ₹34,905.6 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 253.13 | M3 | 2,406 ₹6,09,030.78 | 2,405.3 ₹6,08,853.59 Lowest |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it. | 1,687.5 | M2 | 82 ₹1,38,375 | 81.9 ₹1,38,206.25 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,687.5 | M3 | 20 ₹33,750 | 19 ₹32,062.5 Lowest |
| 8.00 | Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 42.19 | KG | 11,619 ₹4,90,205.61 | 11,618 ₹4,90,163.42 Lowest |
| 9.00Construction of Single Row Pipe Culvert Ch @ 0/005 | |||||
| 10.00 | Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation. | 19.66 | M3 | 247 ₹4,856.02 Lowest | 247 ₹4,856.02 Lowest |
Tender Value
₹21.6 L
EMD Value
₹21,620
Closing Date
9 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO
Union office, kallal
Strengthening of the Thirupathur- Managiri Road to Melakadu Road KM 0/0 -0/450
2025_RDTN_577228_1
Strengthening of the Thirupathur- Managiri Road to Melakadu Road KM 0/0 -0/450
Open Tender
Civil Works
Item Rate
180 days
Union office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,620
30 Aug 2025
3 Jul 2025
9 Jul 2025
3 Jul 2025
9 Jul 2025
3 Jul 2025
Amount
Strengthening of the Thirupathur- Managiri Road to Melakadu Road KM 0/0 -0/450
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of service
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of Single Row Pipe Culvert Ch @ 0/005
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete.
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Construction of Two Row Pipe Culvert Ch @ 0/412
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting centering shuttering including necessary supports for plane with Nessesary Supports for Plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance all materials of all labour charges etc., complete.
Collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Hecta metre stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
NACHIYAR ENTERPRISES (BID ID -1396353)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_689835.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .