| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC F 2 B WING FIRST FLOOR SHAPATH HEXA OPP GUJARAT HIGH COURT S G ROAD AHMEDABAD GUJARAT 380054 | AHMADABAD | GUJARAT | 380054 | ₹2.2 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC Technocommercially responsive and lowest quoted bidder |
| 2 | L2₹2.5 Cr+₹10.7 L (4.52%)Rejected-AOC 626 6TH FLOOR DLF TOWER A DLF TOWER 626 6TH FLOOR DLF TOWER A JASOLA JASOLA SOUTH DELHI DELHI 110076 | SOUTH DELHI | DELHI | 110076 | ₹2.5 Cr+₹10.7 L (4.52%) | L2 | Rejected-AOC L2 Bidder |
| 3 | Rejected-Technical 1ST FLOOR 29A SESHAADHRI NILAY D NEOG PATH BEHIND DONA PLANET ANANDA NAGAR G S ROAD GUWAHATI ASSAM 781005 | KAMRUP METRO | ASSAM | 781005 | - | - | Rejected-Technical As the bidder was found techno-commercially non responsive |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
5 Jul 2019, 11:00 amClosed
GM Contracts
NHPC COrporate Office Faridabad
Electromechanical Works Package EM-4 comprising of Design, Manufacturing, Supply, Dismantling of old items, Installation, Testing an Commissioning of DG Sets for Renovation and Modernization of Loktak Power Station (3X35 MW), District Churachandpur (
2019_NHPC_469292_1
NH/Conts(EnM)-I/LOK-02/294
Open Tender
Electrical Works
Works
900 days
NHPC Faridabad
As per tender document
2 documents required · 2 mandatory
₹1,000
Yes
NHPC LIMITED
₹3.8 L
Yes
NHPC Faridabad
14 Dec 2020
17 May 2019
11 Jul 2019
17 May 2019
5 Jul 2019
7 Jun 2019
17 May 2019 - 27 May 2019
3 Jun 2019
EX-WORKS SUPPLY:
Ex-Works price including handling, packing and forwarding charges for supply of 750 KVA, 11kV, 0.8 pf(lagging) silent DG Sets complete with all accessories, fuel system, instrumentation and wiring as per specifications and scope defned in Section 2 of Volume IIIB(PTS) of Package EM4
Ex-Works price including handling, packing and forwarding charges for supply of specified spare parts ( Detailed as per Section 2 of Volume IIIB(PTS) of Package EM4
Ex-Works price including handling, packing and forwarding charges for Tools and Instruments( Detailed as per Section 2 of Volume IIIB(PTS) of Package EM4
TRANSPORTATION:
Total Transportation, handling and insurance charges of 750 KVA, 11kV, 0.8 pf(lagging) silent DG Sets complete with all accessories, fuel system, instrumentation and wiring and specified spare parts as per specifications and scope defined in Section 2 of Volume IIIB(PTS) of Package EM4
INSTALLATION, TESTING AND COMMISSIONING:
Total Erection ,testing and Commission charges of 750 KVA, 11kV, 0.8 pf(lagging) silent DG Sets complete with all accessories, fuel system, instrumentation and wiring and specified spare parts as per specifications and scope defined in Section 2 of Volume IIIB(PTS) of Package EM4
DISMANTLING:
Complete dismantling of old items as per scope defined in clause no. 2.1.1.1 of Section 2 of Volume III B.
Jakson Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .