Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.9 LAccepted-AOC RONGMEN B IV BARAPANI PO SHILLONG 793103 | RI BHOI | MEGHALAYA | 793103 | ₹57.9 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹57.9 L+₹1,715.40 (0.03%)Rejected-Finance | ₹57.9 L+₹1,715.40 (0.03%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹58.4 L+₹47,165.60 (0.81%)Rejected-Finance C O GUPTA EMPORIUM AR BAZAR HAPPY VALLEY SHILLONG 793 004 | EAST KHASI HILLS | MEGHALAYA | 793004 | ₹58.4 L+₹47,165.60 (0.81%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹72.1 L+₹14.2 L (24.5%)Rejected-Finance RONGMEN BLOCK IV NEAR UMROI MILITARY STATION P O BARAPANI SHILLONG 793103 | SHILLONG | RI BHOI | MEGHALAYA | 793103 | ₹72.1 L+₹14.2 L (24.5%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹72.6 L+₹14.7 L (25.4%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹72.6 L+₹14.7 L (25.4%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/s Jaiswal and Co L1 | M/S UTTAM SAHA L3 | M/s Mangal Enterprise L6 | N.V.ENGINEERING L2 | MAHINDER ELECTRICALS L5 | M S Umesh and Co L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean, free from dust, loose paint etc by skilled labour complete all as specified and directed. | 25,350 | SQM | 12.5 ₹3,16,875 Lowest | 20 ₹5,07,000 | 25 ₹6,33,750 | 13 ₹3,29,550 | 14.95 ₹3,78,982.5 | 15 ₹3,80,250 |
| 2.00 | Material and labour for one coat of acrylic water based exterior grade primer @0.9 ltr (undiluted)/10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed.
NOTES:-
(a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE.
(b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate.
(c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.
(d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.
(e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor.
(f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into.
(g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion.
(h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates.
(j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate. | 22,750 | SQM | 34 ₹7,73,500 | 30 ₹6,82,500 Lowest | 70 ₹15,92,500 | 35 ₹7,96,250 | 50 ₹11,37,500 | 39 ₹8,87,250 |
| 3.00 | Material and labour for two coats of water based premium acrylic smooth exterior emulsion of approved colour with silicon additive & Colour stay Technology, Excellent Dirt Pick up resistance with low VOC less than 50 gram/ litre as per the LEEDS specifications, Anti Algae properties in two coats @ 1.79 ltr (undiluted)/ 10 sqm diluted with water as per manufacturer instructions applied over priming coat with fully automatic airless spray machine of paint application with a flow speed of minimum 1 ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in both the coats of paint complete all as specified and directed. NOTES :-
(a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE.
(b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate.
(c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.
(d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.
(e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor.
(f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into.
(g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion.
(h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates.
(j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate. | 22,750 | SQM | 82 ₹18,65,500 | 90 ₹20,47,500 | 75 ₹17,06,250 Lowest | 81 ₹18,42,750 | 120 ₹27,30,000 | 95 ₹21,61,250 |
| 4.00 | Material and labour for waterproof cement based putty @ 1 Kg (undiluted) per sqm of average thickness 1 mm over the plastered/old painted wall after scrapping to prepare the surface even and smooth complete and sanding of the putty surface with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 Grit or above to make the surface free from dust etc. by skilled labour as per following steps:-
Step 1) Mix the putty powder by adding water as per manufacturer's instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step 2) Apply the first coat of the prepared mix with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI.
Step 3) Allow 6-8 hrs time to dry the putty surface.NOTES :-
(a) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE.
(b) The cost of scaffolding upto 10m height of building shall be included in the quoted rate.
(c) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.
(d) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.
(e) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor.
(f) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into.
(g) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion.
(h) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates.
(j) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate. | 1,975 | SQM | 63 ₹1,24,425 Lowest | 90 ₹1,77,750 | 100 ₹1,97,500 | 64 ₹1,26,400 | 90 ₹1,77,750 | 85 ₹1,67,875 |
| 5.00 | Material and labour for applying two coats of oil bound distemper using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and directed.
Note:- Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application).
NOTES:-
(a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application).
(b)The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE.
(c) The cost of scaffolding upto 10m height of building shall be included in the quoted rate.
(d) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.
(e) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.
(f) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor.
(g) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into.
(h) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion.
(j) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates.
(k) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate. | 2,600 | SQM | 55 ₹1,43,000 Lowest | 75 ₹1,95,000 | 60 ₹1,56,000 | 58 ₹1,50,800 | 59 ₹1,53,400 | 69 ₹1,79,400 |
| 6.00 | Taking down cement plaster, any description, on brick or stone walls, etc.including racking out joints, hacking for key, scrubbing down with water, etc. including removal of rubbish material away from site, complete all as specified and as directed. | 610 | SQM | 72 ₹43,920 | 20 ₹12,200 Lowest | 30 ₹18,300 | 75 ₹45,750 | 20 ₹12,200 Lowest | 30 ₹18,300 |
| 7.00 | M & L for 15 mm thick cement plaster on fair faces of bricks/ concrete surfaces in cement mortar 1:6 including plastered surfaces shall be finished even & smooth without using extra cement all as specified and as directed. | 210 | SQM | 325 ₹68,250 | 250 ₹52,500 Lowest | 450 ₹94,500 | 327 ₹68,670 | 299.5 ₹62,895 | 305 ₹64,050 |
| 8.00 | Material and labour for plastering 15 mm thick (in two layers of 10mm and 5mm thk) on fair faces of brick wall or concrete surfaces in cement mortar 1:4 with water proofing compound as per manufacturer's printed instruction finished even and fair complete all as specified and directed.
Note: Water proofing compound shall be measured and paid for separately. | 280 | SQM | 370 ₹1,03,600 | 250 ₹70,000 Lowest | 450 ₹1,26,000 | 307 ₹85,960 | 315.55 ₹88,354 | 325 ₹91,000 |
| 9.00 | Supply only integral water proofing compound complete all as specified and directed. | 25.2 | KG | 59.5 ₹1,499.4 | 60 ₹1,512 | 50 ₹1,260 | 74 ₹1,864.8 | 46 ₹1,159.2 | 41 ₹1,033.2 Lowest |
| 10.00 | Material and labour for plastering 5 mm thick on fair faces of brick work or concrete surfaces as in ceiling in cement mortar 1:3 finished even and smooth without using extra cement complete all as specified and as directed. | 120 | SQM | 285 ₹34,200 | 300 ₹36,000 | 450 ₹54,000 | 285 ₹34,200 | 188.55 ₹22,626 | 145 ₹17,400 Lowest |
Tender Value
₹90 L
EMD Value
₹1.6 L
Closing Date
22 Sept 2025, 6:00 pmClosed
CWE Shillong
HQ CWE Shillong, SE Falls, Shillong - 793011
SMART PERIODICAL SERVICES TO CERTAIN BLDG IN ZONE I TO IV AT UMROI UNDER GE UMROI
2025_MES_726274_1
8912/UMR/E8
Open Tender
Civil Works
Item Rate
180 days
Umroi
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE Umroi
₹1.6 L
Yes
3 Nov 2025
15 Aug 2025
23 Sept 2025
15 Aug 2025
22 Sept 2025
5 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .