Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.6 LAccepted-AOC | ₹72.6 L Quoted ₹61.6 L | L1 | Accepted-AOC L 1 Bidder is responsive as per TEC |
| 2 | L2₹64.2 L+₹2.6 L (4.28%)Rejected-Finance | ₹64.2 L+₹2.6 L (4.28%) | L2 | Rejected-Finance TEC unanimously rejected |
| 3 | L3₹64.5 L+₹2.9 L (4.79%)Rejected-Finance | ₹64.5 L+₹2.9 L (4.79%) | L3 | Rejected-Finance TEC unanimously rejected |
| 4 | L4₹68.0 L+₹6.4 L (10.4%)Rejected-Finance | ₹68.0 L+₹6.4 L (10.4%) | L4 | Rejected-Finance TEC unanimously rejected |
| 5 | L5₹81.8 L+₹20.3 L (32.9%)Rejected-Finance | ₹81.8 L+₹20.3 L (32.9%) | L5 | Rejected-Finance TEC unanimously rejected |
| Sl No | Description | Qty | Unit | DEVESH CONSTRUCTIONS L3 | Cee Kay EPC Projects Pvt Ltd L1 | ALHADIN CONSTRUCTION L6 | Kashmir Singh L4 | GOPAL SINGH THAKUR L2 | ASHOK KUMAR GARG CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Material Required | |||||||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF | 333 | Nos | 9,000 ₹29,97,000 | 8,750 ₹29,13,750 | 7,500 ₹24,97,500 Lowest | 9,000 ₹29,97,000 | 8,150 ₹27,13,950 | 10,996.89 ₹36,61,964.37 |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF | 81 | Nos | 9,500 ₹7,69,500 | 9,600 ₹7,77,600 | 8,500 ₹6,88,500 Lowest | 9,400 ₹7,61,400 | 8,900 ₹7,20,900 | 12,794.3 ₹10,36,338.3 |
| 1.03 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 75 | Nos | 2,900 ₹2,17,500 | - | 2,500 ₹1,87,500 Lowest | 3,600 ₹2,70,000 | 3,300 ₹2,47,500 | 4,138.02 ₹3,10,351.5 |
| 1.04 | Formed OFC Dead End and Termination Fittings including all supporting items. | 155 | Nos | 1,260 ₹1,95,300 | - | 2,200 ₹3,41,000 | 900 ₹1,39,500 Lowest | 1,100 ₹1,70,500 | 1,222.2 ₹1,89,441 |
| 1.05 | OFC suspension fittings including all supporting items. | 250 | Nos | 900 ₹2,25,000 | - | 3,000 ₹7,50,000 | 740 ₹1,85,000 | 650 ₹1,62,500 Lowest | 810.92 ₹2,02,730 |
| 1.06 | Adjustable Cable Storage Bracket. | 78 | Nos | 600 ₹46,800 | - | 1,500 ₹1,17,000 | 450 ₹35,100 Lowest | 560 ₹43,680 | 546.11 ₹42,596.58 |
| 2.00SERVICES REQUIRED | |||||||||
| 2.01 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint | 414 | Nos | 3,100 ₹12,83,400 Lowest | 3,920 ₹16,22,880 | 6,200 ₹25,66,800 | 3,200 ₹13,24,800 | 3,100 ₹12,83,400 Lowest | 3,912.98 ₹16,19,973.72 |
| 2.02 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 15 | Km | 29,950 ₹4,49,250 Lowest | 50,000 ₹7,50,000 | 97,000 ₹14,55,000 | 33,000 ₹4,95,000 | 41,500 ₹6,22,500 | 53,350 ₹8,00,250 |
Tender Value
₹84.3 L
EMD Value
₹1.7 L
Closing Date
9 Feb 2026, 11:00 amClosed
Chief General Manager BSNL Himachal Pradesh Circle
O/o CGMT BSNL HP, Block no. 11, SDA Complex, Kasumpti, Shimla
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
2026_BSNL_263454_1
HPCO-23/11/27/2025-CFA-HPCO
Open Tender
OFC Laying Works
Works
1095 days
Solan Bussiness Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
AO(Claim), O/o CGMT, BSNL HP
₹1.7 L
Yes
7 Sept 2026
17 Jan 2026
10 Feb 2026
19 Jan 2026
9 Feb 2026
19 Jan 2026
19 Jan 2026 - 30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material Required | |||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF | 333 | Nos | 11,337 | ₹37,75,221 |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF | 81 | Nos | 13,190 | ₹10,68,390 |
| 1.03 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 75 | Nos | 4,266 | ₹3,19,950 |
| 1.04 | Formed OFC Dead End and Termination Fittings including all supporting items. | 155 | Nos | 1,260 | ₹1,95,300 |
| 1.05 | OFC suspension fittings including all supporting items. | 250 | Nos | 836 | ₹2,09,000 |
| 1.06 | Adjustable Cable Storage Bracket. | 78 | Nos | 563 | ₹43,914 |
| 2SERVICES REQUIRED | |||||
| 2.01 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint | 414 | Nos | 4,034 | ₹16,70,076 |
| 2.02 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 15 | Km | 55,000 | ₹8,25,000 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.46 MB
approvedtender15kmSOLrehab.pdf
Tender Documents • 12.44 MB
BOQ_305574.xls
BOQ • 0.28 MB
taxdetailsADSSlaying.pdf
Additional Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .