Loading…
Loading…
Tender Value
₹41.6 L
EMD Value
₹41,700
Closing Date
6 Jun 2026, 5:00 pmDue tomorrow
S.E, Aul Embkt. Division, Aul
Superintending Engineer, Aul Embankment Division, Aul
Protection to Scoured Bank on Badhi Badamohanpur Saline Embankment from RD 900 M to 965 M
2026_AULE_129854_8
e-Procurement Notice No.AED-02 OF 2026-27
Open Tender
Civil Works - Others
180 days
AUL
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹41,700
Yes
28 May 2026
28 May 2026
8 Jun 2026
28 May 2026
6 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil by manual means within initial lead of 50m & initial lift of 1.50m including rough dressing and breaking the clods to maximum 5cm to 7cm in size , laying in layers not exceeding 0.30m in depth including, labour T&P & Cess, etc. complete as per direction of Engineer-in-Charge . | 11.7 | 100 Cum | 21,052 | ₹2,46,308.4 |
| 2 | Quarrying, Collecting, supplying and stacking of hard granite stone boulder of at least 30 cm in length in any direction,50kg in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials packing the stones in rip raps ,spur, and slope protection works in all heights and depths including filling the interstices with small stones wedging and hammering etc complete with all cost of incidental charges including cost, carriage, & royalty of all materials, including all labour T&P etc. complete and labour cess, taxes as applicable as per drawing, specification, direction of Engineer-in-Charge. | 33.15 | One Cum | 3,062.5 | ₹1,01,521.88 |
| 3 | Quarrying, Collecting, supplying and stacking of hard granite stone boulder of at least 30 cm in length in any direction,50kg in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials, dumping the stones in rip raps ,spur, and slope protection works including surface packing in all heights and depths including filling the interstices with small stones ,wedging and packing surface to proper line levels including fixing wave breakers etc. including cost, carriage, & royalty of all materials, including all labour T&P etc. complete and labour cess, taxes as applicable including all cost of incidental charges as per drawing, specification, direction of Engineer-in-Charge .(Measurement to be taken in level section & 1/6th voids will be deducted from the finished level section) | - | One Cum | 2,531.1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
DTCNAul_08.pdf
Tender Documents • 1.32 MB
BOQ_592783.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid