Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC TAMIL NADU TN | THENI | TAMIL NADU | 625203 | ₹1.4 Cr | L1 | Accepted-AOC Tender approved by HRCE Commissioner dated on 30.07.2025 |
| 2 | L2₹1.4 CrRejected-Finance R S MAIN ROAD MANALI POST THIRUTHURAIPOONDI TALUK TIRUVARUR DISTRICT 610210 | 610210 | ₹1.4 Cr | L2 | Rejected-Finance Highest rate quoted |
| Sl No | Description | Qty | Unit | SINGARAVELU L1 | A.Sivakumar L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 355 | cum | 220 ₹78,100 | 232 ₹82,360 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 115 | cum | 1,687 ₹1.9 L | 1,691 ₹1.9 L |
| 3.00 | Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant St | 56 | cum | 5,751 ₹3.2 L | 5,796 ₹3.2 L |
| 4.00 | Random Rubble masonry work in Lime mortor 1:2( One of Lime and Two of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications. | 128 | cum | 6,245 ₹8.0 L | 6,285 ₹8.0 L |
| 5.00 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 31.5 | cum | 8,932 ₹2.8 L | 9,000 ₹2.8 L |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 75 | Sqm | 931 ₹69,825 | 945 ₹70,875 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 3.45 | mt | 89,883 ₹3.1 L | 91,500 ₹3.2 L |
| 8.00Brick work using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4"" in following Cement Mortar including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. | |||||
| 8.01 | Cement Mortar 1:6 | 122 | Cum | 6,095 ₹7.4 L | 6,125 ₹7.5 L |
| 8.02 | Cement Mortar 1:5 | 47 | Cum | 6,166 ₹2.9 L | 6,190 ₹2.9 L |
Tender Value
₹1.4 Cr
EMD Value
₹80,610
Closing Date
21 Apr 2025, 5:00 pmClosed
Executive Officer
Arulmigu Thiruvalarntha perumal Temple at Korukkai Village, Thiruthuraipoondi Taluk, Thiruvarur District
Repair and restoration work of swamy sannathi, arthamandabham and re-construction of thayar sannathi, mahamandabam and compound wall in Arulmigu Thiruvalarntha perumal Temple at Korukkai Village, Thiruthuraipoondi Taluk, Thiruvarur District
2025_HRCE_537910_1
01-L-TVP-2025
Open Tender
Civil Works
455 days
Arulmigu Thiruvalarntha perumal Temple at Korukkai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹80,610
12 Mar 2026
7 Apr 2025
22 Apr 2025
7 Apr 2025
21 Apr 2025
7 Apr 2025
7 Apr 2025 - 21 Apr 2025
Amount
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant St
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brick work using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4"" in following Cement Mortar including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Cement Mortar 1:6
Cement Mortar 1:5
Brick masonry Lime mortar 1:2 using Country bricks size 8 -3/4"x4 1/4"x2 3/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Kalkaram up to 15'0"
Vimanam / Gopuram of height up to 15' 0" (excluding kalkaram)
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor1:1.5 (One Lime and One and Half Sand) etc complete.
Inner Flooring
Outer Flooring
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 200mm x 200mm x 20mm of approved quality set in Lime Mortor1:1.5 (One Lime and One and Half Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Door upto 7' hight
Door Above 7' hight
Best varnish two coats for wood works etc, complete complying with standard specifications.
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification
Labour charges for Dressing and Fixing of cut stone Pillar excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing and Fixing of cut stone Thani Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., Thanu bodhgu
Labour charges for Dressing and Fixing of cut stone Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,Thau uthiram
Labour charges for Dressing and Fixing of cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., Pavucal
Labour charges for Dressing and Fixing of cut stone Nilaikal Nagapattam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., Nievukal
Pointing the cut stone joints with L.M 1:1.5 (One Lime and One and Half Sand) including cost of special tiles such brush and watering, curing etc complete, as per standard specifications
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work.
Vimanam Up to 15' ht
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds .
For Kalkaram up to 15'0"
Vimanams / Gopurams up to 50' 0" height (excluding Kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 (One Lime and One and Half Sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with L.M. 1:1.5 (One Lime and One and Half Sand) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area ,complete complying with standard specification and as directed by the departmental officers.
For Kalkaram up to 15'0"
Vimanam Upto 15'0" exculding Kalkaram
Plastering with Lime Mortar 1:1.5 (One Lime and One and half of Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Lime Mortar 1:1.5 (One cement and One and Half Sand),20mm thick mixed with water proofing compound in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Painting two coats of newly plastered wall surface with Water based Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications.
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:1:5 finishing the same with Lime Mortor 1:1:5 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 1' 0" upto 2' 6"
Sudhai size above 2' 6" upto 3' 6"
Add GST 18%
A.Sivakumar (BID ID -1309571)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_640490.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid