Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC BAJPAI COLONY LAKHIMPUR KHIRI | LAKHIMPUR KHIRI | LAKHIMPUR KHERI | UTTAR PRADESH | L1 | Accepted-AOC boq | |
| 2 | L2₹3.6 L+₹48,935.39 (15.8%)Rejected-Finance | L2 | Rejected-Finance BOQ | |
| 3 | L3₹3.8 L+₹74,421.35 (24.0%)Rejected-Finance | L3 | Rejected-Finance BOQ | |
| 4 | L4₹3.9 L+₹80,036.21 (25.8%)Rejected-Finance | L4 | Rejected-Finance BOQ | |
| 5 | L5₹4.0 L+₹86,077.57 (27.8%)Rejected-Finance BASTI | BASTI | BASTI | UTTAR PRADESH | L5 | Rejected-Finance BOQ |
Tender Value
₹4.2 L
EMD Value
₹8,000
Closing Date
10 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
SARYU NAHAR KHAND KHALILABAD
ESTIMATE FOR MAKING NEW VRB OF RAMPUR DY. AT KM 7.340
2023_UPIDC_780846_13
04/E.E./2022-23
Open Tender
Civil Works
Item Rate
60 days
SANTKABEER NAGAR
Please Refer Tender Document
2 documents required · 2 mandatory
₹677
₹8,000
Yes
1 Feb 2024
3 Mar 2023
10 Mar 2023
3 Mar 2023
10 Mar 2023
3 Mar 2023
Amount
Earth work in excavation of foundation including digging & refilling the trenches with its proper disposal.
Centering & shuttering for C.C. 1:3:6 in foundation including cost of all complete.
Laying C.C. 1:3:6 in foundation with crushed stone grit size 20 mm and chopan coarse sand and including cost of all lead, lift, material, labour, T&P etc. completion of work.
Ist class Brick Work in 1:4 C:M with coarse & cement including cost of all lead, lift, material, labour, T&P etc. completion of work.
Centering & shuttering for R.C.C. Slab & Bed Block including cost of all lead, lift, material, labour, T&P etc. completion of work.
Cutting bending and binding of steel bar for reinforcement including cost of lead, lift, material, labour, T&P etc. completion of work.
Laying R.C.C. 1:1.5:3 in Bed Block & Slab with chopan coarse sand &dalla crushed stone grit size upto 20 mm including cost of all lead, lift, material, labour, T&P etc. completion of work.
Laying C.C. 1:1.5:3 for Wearing coat in slab with coarse sand including cost of all lead, lift, material, labour, T&P etc. completion of work.
Struck deep cement pointing 1:2 c:m including cost of all lead, lift, material, labour, T&P etc. completion of work.
Laying & Fixing of Joint Filler Board i/c cost of all material labour T&P etc complete.
M/S ABHA ENTERPRISES
M/S ASHA CONSTRUCTION
M/S RAJESH KUMAR YADAV CONTRCTOR
M/S JAI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .