Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.8 LAccepted-AOC LIG 136 DR R P NAGAR KOSABADI KORBA CG PIN 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | L-2₹49.2 L+₹3.7 L (8.08%)Rejected-Finance A 49 10 VINDHIYA COLONY PINOURA NOWROZABAD DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L-2 | Rejected-Finance Rejected as L-3 | |
| 3 | L-3₹60.9 L+₹15.4 L (33.7%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L-3 | Rejected-Finance Rejected as L-3 | |
| 4 | L-4₹66.0 L+₹20.5 L (44.9%)Rejected-Finance VILL RUNGTA COLLIERY P O RUNGTA COLLIERY DISTT SHAHDOL M P 484110 | RUNGTA COLLIERY | SHAHDOL | MADHYA PRADESH | 484110 | L-4 | Rejected-Finance Rejected as L-4 | |
| 5 | L-5₹67.1 L+₹21.5 L (47.2%)Rejected-Finance AMLAI COLLIERY DHANPURI DISTT ANUPPUR M P | DHANPURI | ANUPPUR | MADHYA PRADESH | 484116 | L-5 | Rejected-Finance Rejected as L-5 |
Tender Value
₹72.1 L
EMD Value
₹90,100
Closing Date
6 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Heightening, widening of existing drift and coal gallery and side blasting in coal for preparation of Man Riding route and construction of RCC side wall with providing and fixing of steel girders in widen portion of side blasted gallery Khairaha UG
2023_SECL_267626_1
SECL/SGP/ET/2223/601dt13/01/22
Open Tender
Civil Works - Others
Item Rate
365 days
khairaha UG Mine
As per NIT
10 documents required · 10 mandatory
₹90,100
25 Mar 2023
16 Jan 2023
8 Feb 2023
16 Jan 2023
6 Feb 2023
17 Jan 2023
16 Jan 2023 - 25 Jan 2023
Amount
Item Description/ Heading Part (A) labour Cost
(A) For Widening of Existing Drift Seam-VII & VI(B) Set-1 (soft stone) -390.00x(0+0+0.05+0.40+0.10+0.20+0+0+0.40+0.20+0.20+0.20+0+0.10+0.30+0+0.10+0+0.20+0+0+0+0.20+0.20+ 0.10+0.10+0+0.10+0.20+0.20+0+0.10+0+0.20+0.50+0.40+0+0.40+0)/42x3.0 = 390.00 x 0.12 x 3.00 = 140.40m3 (B) For Heightening of Existing Drift Seam-VII &VI(B)(soft stone) 404x(0+0+0+0+0.60+0.50+0.30+0.10+0.25+0.30+0+0.30+0.30+0+0.10+0+0.20+0.40+0.30+0.10+0+0.10+0.10+0+0+0.10+0+0.10+0.30+0.40+0.10+0.10+0.40+0.50+0.30+0+0.10+0.20+0.20+0.20+0.30+0.30+/42 x 4.80 = 404x0.18x4.80 = 349.06 m3 grand total (A+B) = (140.40+349.06) = 489.46m3
(A)For Widening of Existing gallery(coal) SeamVI(B) Set-1 374 x (0.20 +0+0+0+0+0+0 +0.30+0.20+ 0+0.40+0.40+0.10+0.20+0.10+0+0+0+0+0.20+0+0+0+0+0+0+0+0+0+0.40+0.40+0+0+0+0+0.20+0+0.20+0+0+0+0.80+1.90+1.40+0.20+1.20+0.60+0.40+.90+.20)/50 x 2.80 = 374 x 0.22 x 3.00 = 246.84 m3 (B) For Heightening of Existing gallery (coal) Seam VI(B) Set-1 – 450x(0.40+0.50+0.60+0.50+0.20+0+0.20+0.50+0.80+0.70+ 0.80+0.75+0.70+0.80+0.50+0.30+0.20+0.30+0.50+0.30+0.10+0+0.10+0.20+0.20+0.20+0.30+0.30+0.30+0.30+0.40+0.80+0.60+0.40+0.30+0.10+0.10+0.20+0.40+0.50+0.50+0.40+0.50+0.50+0.60+0.55)/46 = 450 x 0.40 x 4.80 = 864.00 m3 (C)For Widening of Existing gallery (coal) SeamVII Set-2 572 x (0+0.30+1.00+0.90 +0+0.70+0.40+0.20+ 0+0+0.50+0.60 +0.10+0.40+0+0+0+0+0+0.30+0.10+0.10+0.40+0.10+0.20+0.20+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0+0.10+0+0+0+0+0+0.50+0.30+0+0.10+0+0+0+0+0.10+.90+0+0.30+0.30+0+0+0.20+0+0.30+0.60+0+0+0+0+0+0+0.20+0+0+0.10+0)/79 x 3.00 = 572 x 0.12 x 3.00 = 205.92.00 m3 (D) For Heightening of Existing gallery (coal) Seam VII Set-2 700x(0+0+0+0.10+0.10+0.15+0.20+0.20+0.40+0.20+0+0+0+0.30+0.10+0+0+0+0.10+0.30+0.50+0.50+0.40+0.30+0.40+0.40+0.50+0.50+0.40+0.20+0.10+0+0+0.10+0.40+0.40+0.20+0.10+0+0+0+0+0.40+0.50+0.60+0.50+0.40+0.10+0.10+0.20+0.20+0.10+0+0+0+0+0+0.10+0.20+0.20+0+0+0+0+0+0+0+0+0+0+0)/71x4.80 = 700 x 0.16 x 4.80 = 537.60 m3 Grand total (A+B+C+D)=(246.84 +864.00+205.92+537.60) = 1854.36 m3
Labour charges for structural steel work in single section,fixed with or without connecting plate,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer all complete.
Side blasting around 1DW/9L– Side blasting including labour for drilling, blasting & mucking manually in coal (drilling by hand). 1.(A) ½ x (4.00x3.00x3.00) = 18.00 m3 (B) ½ x (2.00x3.00x3.00) = 9.00 m3 2. (A) ½ x (9.00x2.00x3.00) = 27.00 m3 Sub Total = 54.00 m3
Roof bolting in u/g including drilling by power drill manually with wet drilling arrangement (1.50m – 1.80m length with 27mm dia, drill bit for anchoring 20/22 mm dia roof bolts with resin capsules and fitting of bearing plates and W-strap (as and when required) and tightening of nuts etc complete. Note: Drill rod, drill bit and spray pump to be provided by contractor
Cuttting in soft stone by chiesel & hammer A). Roof (in soft stone) 51.00X0.30X0.15 = 2.30m3
B). Floor(in coal & shale mix) 51.00X0.50X0.50 = 12.75 m3
(C) for Duggi 21 Nos.x0.30x0.30x0.45 =0.85 m3
RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials for upto floor =(51.00X0.50 X 0.50) = 12.75 m3 for Wall (51.00X0.30 X 3.15) = 48.20 m3 60.95M3
Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall (any thickness) in u/g(Excluding centring, shuttering and cost of CC materials) (a)for wall for Duggi =21 Nos.x0.30x0.30x0.45 =0.85 m3
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. [27+(2x24)X3.00) = 225.00 m2
6 mm thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc Complete (exclusive cost of materials) [27+(2x24)X3.00) = 225.00 m2
Loading of materials in tub at incline mouth 1) Cement = 14.18 m3 2) Sand = 29.23 m3 3) Stone chips= 55.01 m3 4) Steel Rod = 0.14 m3 Total = 98.56m3
Unloading the same materials at Destination UG 1) Cement = 14.18 m3 2) Sand = 29.23 m3 3) Stone chips= 55.01 m3 4) Steel Rod = 0.14 m3 Total = 98.56m3
Transportation of material with tramming & pushing,coupling & uncoupling with haulages for a distance every 1000 mtr. or part there of and bringing the empty tubs to surface. 1) Cement = 14.18 m3 2) Sand = 29.23 m3 3) Stone chips= 55.01 m3 4) Steel Rod = 0.14 m3 Total = 98.56m3
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod
Total impact of GST for the purpose of CTC
ABADH KISHOR SHARMA
RAVI KUMAR JAISWAL
MUNSHI RAM
MAHENDRA SINGH
stage.html
html • 0.05 MB
techsummary_276916.pdf
PDF • 0.17 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_276916.pdf
PDF • 0.14 MB
LOI601.pdf
PDF • 1.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .