| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.6 L+₹25,728.80 (7.79%)Admitted-Fee/PreQual/Technical/Finance | ₹3.6 L+₹25,728.80 (7.79%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.6 L+₹26,289.55 (7.96%)Admitted-Fee/PreQual/Technical/Finance | ₹3.6 L+₹26,289.55 (7.96%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JAS Construction L1 | M THIRUNAVUKKARASU L3 | M S D ASSOCIATES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Desilting the storm water drain - Sand and Silt Under Water (SS20B) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels (SS20B). | 11 | Cum | 92 ₹1,012 | 99.04 ₹1,089.44 | 50 ₹550 Lowest |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification. | 42 | Cum | 174 ₹7,308 | 187.02 ₹7,854.84 | 100 ₹4,200 Lowest |
| 3.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 32 | Cum | 82 ₹2,624 | 88.41 ₹2,829.12 | 50 ₹1,600 Lowest |
| 4.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3. | 7 | Cum | 4,710 ₹32,970 Lowest | 5,068.65 ₹35,480.55 | 5,000 ₹35,000 |
| 5.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | ||||||
| 5.01 | Drain | 99 | Sqm | 422 ₹41,778 | 454.04 ₹44,949.96 | 400 ₹39,600 Lowest |
| 5.02 | b) Slab | 39 | Sqm | 563 ₹21,957 Lowest | 605.38 ₹23,609.82 | 600 ₹23,400 |
| 6.00 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification - 1 m3. | 17 | Cum | 5,310 ₹90,270 Lowest | 5,714 ₹97,138 | 6,100 ₹1,03,700 |
| 7.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 4.9 | Qtl | 7,538 ₹36,936.2 Lowest | 8,111.78 ₹39,747.72 | 8,800 ₹43,120 |
| 8.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 6 | Cum | 7,650 ₹45,900 Lowest | 8,283.83 ₹49,702.98 | 8,800 ₹52,800 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Strom Water Drain, and Covering Slab at Amman Colony Street in Ward No.93, South zone.
2026_MAWS_694673_13
e53/2026-south single
Open Tender
Civil Works
Works
150 days
The Commissioner, Coimbatore Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting the storm water drain - Sand and Silt Under Water (SS20B) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels (SS20B). | 11 | Cum | - | - |
| 2 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification. | 42 | Cum | - | - |
| 3 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 32 | Cum | - | - |
| 4 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3. | 7 | Cum | - | - |
| 5Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | |||||
| 5.01 | Drain | 99 | Sqm | - | - |
| 5.02 | b) Slab | 39 | Sqm | - | - |
| 6 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification - 1 m3. | 17 | Cum | - | - |
| 7 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 4.9 | Qtl | - | - |
| 8 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 6 | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
ITB.pdf
Additional Documents • 0.19 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
BOQ_835211.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .