| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹9.1 L+₹12,014 (1.34%)Rejected-Finance | L2 | Rejected-Finance DOES NOT STAND LOWEST BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical DOES NOT QUALIFY AS PER PQC |
Tender Value
₹8.8 L
EMD Value
₹15,000
Closing Date
14 Nov 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE OMC-IV ATPS ANPARA
OFFICE OF THE SE OMC-IV ATPS ANPARA
Annual Overhauling of GT-3 (250MVA 15.75/420KV) during overhauling of Unit No. 3 of 3x210 MW ATPS Anpara (Sonebhadra) as per scope of work.
2022_RVUNL_738064_1
09/OH3/OMCIV/EMD-I/ ATPS/22-23
Open Tender
Electrical Works
Fixed-rate
365 days
ATPS ANPARA
AS PER PQC
3 documents required · 3 mandatory
₹1,180
DY.CAO CFA AND BO ATPS ANPARA
₹15,000
5 Jan 2023
14 Oct 2022
15 Nov 2022
14 Oct 2022
14 Nov 2022
14 Oct 2022
14 Oct 2022 - 14 Nov 2022
Amount
Transportation of empty oil storage tanks (25 KL) on the site of GT-3 from site of ST-2.
Dismantling and assembly of HV/LV links, Jumpers and bellows etc.
Dismantling and assembly LV and Neutral Bushing, LV Turret, etc.( proper replacement of gaskets and O-rings) and Replacement of WTI, OTI, Buccholz Relay ,RPRR , etc. along with replacement of all three phases bushing off seal and rubber bus duct bellows.
Replacement of gaskets of oil header pipe lines, all inspection cover of GT-3 top cover & re-visioning of both Butterfly valves of 250 mm. Nb.
Painting of GT-3 of Unit No. 3, Surface Area= 2750 Sq. Mtr. (approx.).
Overhauling of cooling fans & oil circulating pumps of GT-3 as per scope of work.
Overhauling of Radiators (32 Nos.) as per scope of work.
Overhauling/Replacement/Servicing of Butterfly valves (64No.) of radiator (100 mm Nb).
Draining & Refilling of Transformer Oil of GT-3 after its centrifuging.
Repairing of LV Wall Shunt of All three phases of GT-3.
Repairing of HV Wall Shunt of All three phases of GT-3.
Dry Out Process Of GT-3 Until Dew Point of (-) 20°C is achieved.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .