| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 2 | L2₹17.7 L+₹1.4 L (8.41%)Accepted-AOC | L2 | Accepted-AOC AWARDED | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-HIGHER RATES |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
4 Jul 2024, 2:00 pmClosed
GM
ACSM
BOILER REPAIR WORK
2024_Coop_122190_1
REPAIR WORK OF BOILER
Open Tender
Miscellaneous Works
Item Wise
60 days
ACSM
PLEASE REFER TENDER DOCUMENTS
1 document required · 1 mandatory
₹0
₹10,000
18 Jul 2024
13 Jun 2024
5 Jul 2024
13 Jun 2024
4 Jul 2024
13 Jun 2024
Amount
Boiler Cap. 32 T/Hrs, working pressure 45Kg/cm2 make CVL
dismantling, Fabrication & Erection of IBR Tubes for both the boilers side wall panel along with fins fabrication, erection to be done as per drg Tube size 50.8 OD x 4.06 mm thickness x 8.3 Mtr long.
dismantling & Erection of Primary super heater coils including hydraulic testing at ground
Fabrication of primary super heater coils as per drawing including hydraulic testing at ground
dismantling & Erection of Secondary super heater coils including hydraulic testing at ground of both the boilers.
Repair of Seconday super heater coil including hydraulic testing at ground of both the boilers.
Fabrication of secondary super heater coils as per drg. No. ACSM-15
Replacement (Dismantling & Erection) of complete Economiser coils of both the boilers.
Fabrication of complete economizer coild of the boilers as per drg. ACSM-16 Size of Tube : 50.8 mm od X 4.06 mm wall thickness Material of Tube BS3059 ERW-Part-II 360 Make of the material TATA/TI/BHEL
Dismantling and Erection 6" IBR Steam Pipeline
Dismantling and erection 6" long bend
Dismantling and Erection 6" short bend
Dismantling & Erection of Air heater tubes of FD (including welding of Top & Bottom tube plate holes) Material Specification BS1775/64 Tube Diameter 60.3mm Thickness 2.9mm Tube Length 3.528 mtrs. No. of Tubes 400
Dismantling, Fabrication & Erection of roof tube panel (Front header to steam drum) of boiler no 1 & 2
Dismantling, Fabrication & Erection of drum to drum tube as per drg/sample Tube size 63.5mm x 3.66mm
Dismantling, Fabrication & Erection of Air Heater tube of PA (Including welding of Top & Bottom tube plate holes)
Boiler No.1 Dismantling and removed of old refractory material & reparing with new refractory which includes : Side wall & Front Wall, all headers, Top, Roofs and Door repair and other door repair and other repair work if any.
Boiler No. 2 Dismantling and removed of old refractory material & repairing with new refractory which includes :- Repair of Roof, doors, wall & front wall. All headers repair and other repair work if any.
Repair, maintenance & overhauling of both the boilers Scope of work 1. Complete repair of boiler Auxiliaries which includes ID Fans, FD Fans, PA Fans, MDC's, Feed water tank, Desecrator Tank and soot blowers. Work includes:- a) Cleaning of Feed water & Deprecator tanks and painting of tanks along with checking of all the pipe lines, valves and manholes and connecting transfer pumps. b) Checking of ID Fans, FD Fans and PA Fans which includes repair of vanes of Fans, Pedestal bearings and coupling. Also connecting Ducting with dampers to be repaired along with expansion joints. Alignment of motors to be done also. c) Thorough checking and repair of nozzles, Cones of MDC's of both the boilers along with their cooling arrangements, gear boxes and drives. d) Thorough repair of Soot blowers which includes cleaning of steam pipe lines, driving system etc along with motors to be made fully operational. 2. Complete repair of Boilers Fittings & Mountings which includes all water level gauges, Pressure gauges, Safety valves, Feed control valves, Spray control valves and all the valves of Boilers. Work include:- a) Opening of steam drums of both the boilers which includes taking out the fittings. Fittings are to be repaired outside along with stainers. They are to be painted and refitted in the steam drums after cleaning and painting of steam drums. b) Steam drums water level gauges along with all the valves and drains are to be thoroughly repaired and refitted at their positions. c) Cleaning of mud drums along with its headers which includes cutting of blinds of headers for cleaning purposes. Blinds are to be rewelded after cleaning. All the connecting blow down pipe line and valves are to be checked and repaired. d) Feed water line & spray control valves along with its valves and drains are to be checked and repaired. e) Stop valves, Safety valves of super heated and steam drums are to thoroughly checked and repaired along with replacement copper joints and H.P. steam joint. 3. Hydraulic testing for both the boilers.
KAURA ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .