Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC 8 HIDARAM BANERJEE LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹6.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹6.1 L+₹4,061.65 (0.67%)Rejected-Finance CHOTONILPUR KUCHULPUKUR PAR BURDWAN | ₹6.1 L+₹4,061.65 (0.67%) | L2 | Rejected-Finance 2nd Lowest bidder |
| 3 | L3₹6.1 L+₹8,137.61 (1.35%)Rejected-Finance BARANIJPUR SAKTIPARA BURDWAN | ₹6.1 L+₹8,137.61 (1.35%) | L3 | Rejected-Finance 3rd Lowest bidder |
| Sl No | Description | Qty | Unit | BEHERA ENTERPRISE L3 | C M ENTERPRISE L2 | JOYGURU ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -135 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 135 nos x 12 time= 1620 nos. | 1,620 | Each | 110 ₹1,78,200 | 109 ₹1,76,580 | 108 ₹1,74,960 Lowest |
| 1.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. (2000 Ltr. PVC tank -135 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 135 nos x 12 time= 1620 nos. | 1,620 | Each | 158 ₹2,55,960 | 157 ₹2,54,340 | 156 ₹2,52,720 Lowest |
| 1.03 | Cleaning and removing mud 5000 ltrs PVC water storage tank. (5000 Ltr. PVC tank -6 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 6 nos x 12 time= 72 nos. | 72 | L.S | 333 ₹23,976 | 332 ₹23,904 | 331 ₹23,832 Lowest |
| 2.01 | Cleaning and disinfecting 5000 ltrs. PVC water storage tank. (5000 Ltr. PVC tank -6 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 6 nos x 12 time= 72 nos. | 72 | Each | 435 ₹31,320 | 434 ₹31,248 | 433 ₹31,176 Lowest |
| 2.02 | Clearing the different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the OHR premises and the roof surface respectively. (for such 12 nos operations in a working year i.e every month.) | 12 | Each | 1,985 ₹23,820 | 1,982 ₹23,784 | 1,980 ₹23,760 Lowest |
| 3.00 | Add GST @ 18% | 1 | item | 92,389.68 ₹92,389.68 | 91,774.08 ₹91,774.08 | 91,160.64 ₹91,160.64 Lowest |
| 4.00 | Add Cess @ 1% | 1 | item | 6,056.66 ₹6,056.66 | 6,016.3 ₹6,016.3 | 5,976.09 ₹5,976.09 Lowest |
Tender Value
₹6.1 L
EMD Value
₹12,500
Closing Date
30 Jul 2026, 5:30 pmClosed
EXECUTIVE ENGINEER, CENTRAL MECHANICAL DIVISION
EE,CMD,PHED,5TH_FLOOR_PUTHA_BHAVAN,_PURBA_BARDHAMAN
Washing_cleaning_of_different_capacity_of_PVC_roof_tanks_at_different_buildings_of_Burdwan_Medical_College_and_Hospital_(BMCH)_w/s_scheme_under_CMD_P.H.E._Dte_Dist_Purba_Bardhaman
2026_PHED_1032964_3
WBPHED/EE/CMD/ENIT-03/2026-27
Open Tender
PLUMBING WORKS M/R
Item Rate
365 days
EE, CMD, PHED, 5TH_FLOOR_PUTHA_BHAVAN
Washing_cleaning_of_different_capacity_of_PVC_roof_tanks_at_different_buildings_of_Burdwan_Medical_College_and_Hospital_(BMCH)_w/s_scheme_under_CMD_P.H.E._Dte_Dist_Purba_Bardhaman
5 documents required · 5 mandatory
₹12,500
21 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -135 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 135 nos x 12 time= 1620 nos. | 1,620 | Each | - | - |
| 1.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. (2000 Ltr. PVC tank -135 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 135 nos x 12 time= 1620 nos. | 1,620 | Each | - | - |
| 1.03 | Cleaning and removing mud 5000 ltrs PVC water storage tank. (5000 Ltr. PVC tank -6 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 6 nos x 12 time= 72 nos. | 72 | L.S | - | - |
| 2.01 | Cleaning and disinfecting 5000 ltrs. PVC water storage tank. (5000 Ltr. PVC tank -6 Nos.) Each tank 12 time cleaning in a working year i.e every month.
Total= 6 nos x 12 time= 72 nos. | 72 | Each | - | - |
| 2.02 | Clearing the different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the OHR premises and the roof surface respectively. (for such 12 nos operations in a working year i.e every month.) | 12 | Each | - | - |
| 3 | Add GST @ 18% | 1 | item | - | - |
| 4 | Add Cess @ 1% | 1 | item | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
2911-N-pdf.pdf
Tender Documents • 1.09 MB
BOQ_2536940.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .