| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | ₹12.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹12.6 LRejected-Finance | ₹12.6 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Sagadevan Palanivelu L2 | PUGAL PRABA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Athithiravidar Mayana road Km 0/0 - 0/480 @ Thirucherai Panchayat | |||||
| 2.00 | Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete | 480 | Sq.m | 23.59 ₹11,323.20 | 23.36 ₹11,212.80 |
| 3.00 | Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete | 108 | Cum | 4,113.36 ₹4.4 L | 4,072.22 ₹4.4 L |
| 4.00 | Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete | 1,440 | Sq.m | 68.85 ₹99,144 | 68.16 ₹98,150.40 |
| 5.00 | (PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete | 1,440 | Sq.m | 338.94 ₹4.9 L | 335.55 ₹4.8 L |
| 6.00 | Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete | 21.6 | Cu.m | 904.36 ₹19,534.18 | 895.32 ₹19,338.91 |
| 7.00 | Provision for Name board & Photographic Charges | 1 | nos | 5,050 ₹5,050 | 4,999.5 ₹4,999.50 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,92,126 ₹1.9 L | 1,90,205 ₹1.9 L |
Tender Value
₹12.6 L
EMD Value
₹12,600
Closing Date
23 Dec 2025, 3:00 pmClosed
Block Development Officer
Kaveri Molai Street, Thiruvidaimaruthur 612104
Strengthening of Athithravidar Mayana Road Km 480 at Thirucherai Panchayat
2025_RDTN_632077_1
810/2025/A2 Thirucherai Panchayat
Open Tender
Civil Works - Roads
180 days
Thirucherai
Please Refer Tender Documents
9 documents required · 9 mandatory
₹0
₹12,600
Yes
15 Apr 2026
15 Dec 2025
23 Dec 2025
15 Dec 2025
23 Dec 2025
15 Dec 2025
Amount
Strengthening of Athithiravidar Mayana road Km 0/0 - 0/480 @ Thirucherai Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sagadevan Palanivelu (BID ID -1540859)
stage.html
html • 0.04 MB
technical_756199.pdf
techsummary_756199.pdf
finance_756199.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
techbidthirucheraipanchayat.pdf