| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.7 LAccepted-AOC ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | ₹69.7 L Quoted ₹70.0 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹75.4 L+₹5.4 L (7.70%)Rejected-Finance 47 HUSENI LAKDA BAZAAR 242 BELLAIS ROAD MUMBAI 08 | MUMBAI | MUMBAI | MAHARASHTRA | 400008 | ₹75.4 L+₹5.4 L (7.70%) | L2 | Rejected-Finance Other than being lowest |
| 3 | L3₹77.3 L+₹7.3 L (10.4%)Rejected-Finance B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | ₹77.3 L+₹7.3 L (10.4%) | L3 | Rejected-Finance Other than being lowest |
| 4 | L4₹86.0 L+₹16.0 L (22.9%)Rejected-Finance | ₹86.0 L+₹16.0 L (22.9%) | L4 | Rejected-Finance Other than being lowest |
| 5 | L5₹95.9 L+₹25.9 L (37.0%)Rejected-Finance NOT AVAILABLE | ₹95.9 L+₹25.9 L (37.0%) | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
30 Dec 2023, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
PROVISION OF RETAINING WALL AT REAR SIDE OF SANKALP SCHOOL AND ADDITION/ALTERATION TO EXISTING DAMAGED CHAJJAS AND PARAPET WALL OF R-3 AND R-4 HIGH RISE BUILDINGS AT RS COLABA UNDER GE (NW) NAVY NAGAR, COLABA, MUMBAI
2023_MES_629905_1
8165/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
Category a (i)
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.4 L
Yes
14 Feb 2024
25 Nov 2023
2 Jan 2024
25 Nov 2023
30 Dec 2023
18 Dec 2023
25 Nov 2023 - 15 Dec 2023
Amount
Rough excavation n exc 1.5 m depth and getting out in any type of soil complete all as specified and directed by Engr-in-Charge.
Excavating over areas not exceeding 1.5 m deep and getting out in any type of soil complete all as specified and directed by Engr-in-Charge.
Excavating over areas exceeding 1.5 m and not exceeding 3.00 m in depth and getting out in hard/dense soil complete all as specified and directed by Engr-in-Charge.
Material & labour for hardcore broken stone or boulders of gauge n.exc 63 mm, deposited, spread and levelled in layers n.exc 15 cm thick, watered and rammed to a true surface complete all as specified and directed by Engr-in-Charge.
Material and labour for Plain cement concrete 1:3:6 type-C2 using 40 mm graded crushed stone aggregate as in foundations, filling and mass concrete complete all as specified and directed by Engr-in-Charge.
Material & labour for Brick work with sub class "B" bricks straight or curved on plan exceeding 6 Metre mean radius in cement mortar 1:6 complete all as specified and directed by Engr-in-Charge.
Returning filling in including spreading, levelling, watering and well ramming in layers n exc 25 cm thick in any type of soil complete all as specified and directed by Engr-in-Charge.
Removal of excavated soil exc. 5 km and n. exc 15 km outside MoD land complete all as specified and directed by Engr-in-Charge.
Material & labour for mild steel TMT bars 6 to 8 mm dia as in reinforcement cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed not less than 0.9mm dia) complete all as specified and directed by Engr-in-Charge.
Material & labour for mild steel TMT bars 10 mm dia and over cut to lenth, bent to shape required, including cranking,bending, spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia complete all as specified and directed by Engr-in-Charge. (Note : For Ser item No 8.00 & 9.00 - For retaining wall)
Use & waste of form work to sides of concrete foundations footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams and similar work, vertical or to batter complete all as specified for fair finished surfaces of concrete flat complete all as specified and directed by Engr-in-Charge.
Use & waste of form work to retaining walls, abutment, parapets and staircase railings and similar work including attached pillasters, buttresses etc vertical or to batter for fair finished surfaces of concrete flat complete all as specified and directed by Engr-in-Charge.
Material and labour for reinforced cement concrete M-30 (Design mix), as in foundations including rafts, footing, footing beams plinth beams basees for column etc, basement slab under-reamed piles and mass concrete complete all as specified and directed by Engr-in-Charge.
Material and labour for reinforced cement concrete M-30 (Design mix), as in walls, retaining walls, basement walls, ballast walls and the like, any thickness, above top of footings, including attached pillasters and buttresses complete all as specified and directed by Engr-in-Charge.
Material and labour for reinforced cement concrete M-30 (Design mix), as in beams,lintels complete all as specified and directed by Engr-in-Charge.
Material & labour for PCC ( 1 :3 :6) type C1 (using 20mm graded crushed stone aggregate) as in coping including necessary formwork complete all as specified and directed by Engr-in-Charge.
Material & Labour for mild steel conforming to grade Fe-165 (Fe-290) as in angle post or struts in fencing fixed independently including cutting and bending to shape as directed by drilling holes, notching for wire etc. complete all as specified and directed by Engr-in-Charge.
Supply & fixing 4mm dia galvanised mild steel chain link of Size 75mmx75mm, made of GI wire, including line wires, or any other approved mesh of any size and dia of GI wire complete all as specified and directed by Engr-in-Charge.
Material and labour for preparation of new steel surfaces of any description over 10 cm width or girth and applying two coat of synthetic enamel paint over a coat of red oxide zinc chrome primer complete all as specified and directed by Engr-in-Charge.
Material & labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net etc complete all as specified and directed by Engr-in-Charge.
Material & labour for preparing new plastered surfaces of walls and applying two coats of Acrylic base paint exterior grade (100% Acrylic) including bio washing etc complete all as specified and directed by Engr-in-Charge.
Supply & fixing 110 mm dia PVC (SWR) pipes single socketed in any length as in weepholes of retaining wall complete all as specified and directed by Engr-in-Charge.
Material & labour for Boulder filling dry, hand packed tightly, apron bunds complete all as specified and directed by Engr-in-Charge.
Material & labour for 100 mm thick P.C.C 1:4:8 type D-2 using 40 mm graded crushed stone aggegate as in sub base complete all as specified and directed by Engr-in-Charge.
Material & labour for PCC 1:2:4 type B-1 using 20 mm graded crushed stone aggegate as in floor, finishing the surface even and smooth without using extra cement and spike rolling to surfaces or making impressions of expanded metal whilst when the concrete is green complete all as specified and directed by Engr-in-Charge.
Material & labour for 75mm thick PCC 1:3:6 type C-2 (using 40mm graded crushed stone aggregate) as in sub base to floors complete all as specified and directed by Engr-in-Charge.
Material & labour for sand cushioning under interlocking paver blocks watering and consolidation complete all as specified and directed by Engr-in-Charge.
Material and labour for factory Made machine pressed precast concrete interlocking paver block with grey cement and pigment any shape and size conforming to IS 15658-2006 of 60 mm thickness M-35 grade complete all as specified and directed by Engr-in-Charge.
Demolition of RCC chajjas/drops/fins thickness exc 10 cm but not exc 15 cm, (width of chhajjas varrying from 45cm to 75cm) cutting straight, mechanically/ by means of RCC cutter machine, trimming the chajjas projections upto 15 cm from external surface of walls including erection of double steel scaffolding, covering with green cloth and all the safety measures/precautions and complete all as specified and as directed by by Engineer-in -Charge. Note: Work shall be carried out upto G+14 storey bldg and quoted rate shall be deemed to include for providing scaffolding & Safety Net Cloth at places.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Cutting grooves 75mm wide & 65 mm deep in brick wall / RCC surfaces at any location shaping horizental face with mechanical cutter and grooves filled with PCC 1:2:4 type B-0 (using 12.4mm graded stone aggregate) mixed with chemical compound SUPER LATEX OR DR FIXIT OF PIDILITE INDUSTRIES LTD or SBR LATEX of STP LTD mixed with proportion 200 ml per 50 Kg cement as per manufacturer's instruction and all as specified and directed by Engr-in-Charge. Note: Work shall be carried out upto G+14 storey bldg and quoted rate shall be deemed to include for providing scaffolding & Safety Net Cloth at places.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for filleting in any position and to any shape of section area exc 25 sqcm but n. exc 50 sqcm in cement sand mortar 1:4 including all mitred, stops etc complete all as specified and directed by Engr-in-Charge. Note: Work shall be carried out upto G+14 storey bldg and quoted rate shall be deemed to include for providing scaffolding & Safety Net Cloth at places.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for providing & fixing factory made Fibre glass Reinforced Plastic (FRP) "chajja"- 4mm thick of "fibreways" brand in required colour, size and design made by Resin Transfer Moulding (RTM) Machine Technology available with laminated single piece, having smooth gradual slope curvature for easy drainage of water and duly reinforced by 2 Nos vertically and 1 No horizontally 50x2mm thick MS Flat with 12mm in built hole for grouting on the existing wall along with the 50mm flanges duly inserted and sealed in the wall complete in one single piece casted monothically including all necessary fittings. Molded with unsaturated Polyster resin as per IS: 6746 duly reinforced with fibre glass chopped strand mat (CSM) as per IS: 11551. Available with protective gel coat U/V coating on top for complete resistance from the extreme temperature, weather & sunlight complete all as specified and directed by Engr-in-Charge. Note: Work shall be carried out upto G+14 storey bldg and quoted rate shall be deemed to include for providing scaffolding & Safety Net Cloth at places.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Chipping ,removing carefully old broken concrete work by low impact hammer ,breaker without damaging the structure & cleaning and disposal of debris out side the premises complete all as specified and directed by Engr-in-Charge. (Hard concrete should not be removed by force). Note: Work shall be carried out upto G+14 storey bldg and quoted rate shall be deemed to include for providing scaffolding & Safety Net Cloth at places.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for applying the rust remover alkaline in natrue having specific gravity of 1.1 kg/ltr to the existing/additional rebars including wire brushing manually or by mechanical tools, after cleaning the disturbed surface etc. complete by draining water. Rust remover shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite as approved by GE) Note :- Measurement shall be paid as area of concrete exposed.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for applying two coats of anti-rust protective coating in the form of Acrylic Polymer with a minimum solid content to 40% solids mixed with cement in 1:1.5 proportion (1 part polymer and 1.5 parts cement) on rebars after cleaning of rust scales as per manufacturer's instruction. Anti-rust protective shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite as approved by GE) Note :- Measurement shall be paid as area of concrete exposed.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for TMT bars 10mm dia and over, cut to length, bent to shape required including cranking, spirally and binding with MS wire (annealed) not less than 0.9mm dia by placing in position new reinforcement bars including tack welding to existing reinforcement bars complete as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and Labour for providing bonding coat of SBR polymer over the exposed steel/welded mesh/concrete in ratio 1:1 to 1:1.5 of polymer and cement complete as specified and as directed by Engr-in-Charge by the consultant. SBR polymer to be procured from one of the manufacturer's given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite as approved by GE)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for repairing the damaged concrete portion by SBR Polymer with a minimum solid content to 40% cement mortar in proportion 1:5:15 i.e. (1 part SBR polymer : 5 parts OPC cement and and 15 parts of graded quartz aggregate (sand) upto 25mm thickness as directed by by the manufacturer's instruction including necessary curing etc. complete all as specified and as directed by Engr-in-Charge SBR polymer shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite as approved by GE).
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for casting and repairing of excessively damaged members with micro concrete at all levels with all leads and lift including mixing, laying, levelling, finishing including curing complete. Grade of Micro-concrete to be M-40 at 28 days complete all as specified and as directed by Engr-in-Charge. (Make : Fosroc/Sika/BASF/ Krisha conchem/Dr Fixit Pidilite as approved by GE).
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for providing form work of single length to pour the concrete/micro-concrete using waterproofing film coated ply wood complete all as specified and as directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Taking down cement plaster of any description in any position including raking out joints hacking for key scrubbing down with water etc complete all as specified and as directed by Engr-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement all as specified including scaffolding, Safety net complete as directed by by Engr-in-Charge. (Note :- WPC shall be measured and paid separately)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for plastering in CM (1:3), 5mm thick finished even and smooth for ceiling complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved make complete all as specified and as directed by Engr-in-Charge
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for preparing old plastered surfaces and applying two coats of acrylic based exterior paint over a coat of primer & bio wash on walls incl necessary scaffolding complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for preparing new plastered surfaces of ceilings and applying two coats of Acrylic base paint exterior grade (100% Acrylic) including bio washing and scaffolding and safety net complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & labour for preparing new plaster surface of wall and applying two coats of Acrylic emulsion paint exterior grade (100% Acrylic) over one coat of primer incl necessary scaffolding, Safety net etc complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Ditto all as per item 47.00 above but on ceiling.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Hacking out broken glass panes of any description from wooden frames fixed with beading not exceeding 0.5 sqm in each pane complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing sheet glass 3mm thick ordinary quality fixed with wooden beads n. exc 0.50 Sqm in each panes complete all as specified & directed by by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removing demolished material exc 5 Km but n.exc 15 Km and depositing whereever directed complete all as specified & directed by by Engr-in-Charge.
Unity Enterprises
SHRI SAI ENTERPRISES
SATYANARAYAN CONSTRUCTION
SHREE JAGDISH FURNITURE CO.
SAHU AND SAHU CO.
S S ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .