Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.3 L+₹1,892.48 (0.45%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.3 L+₹2,890.12 (0.68%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹4.3 L+₹5,263.34 (1.24%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹4.7 L+₹48,686.09 (11.5%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GovindaRaj L4 | Om Raavana Construction L5 | Sivabooshanam L2 | VIJAYAN L1 | G.Sakthi Contractor L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Ladies Toilet at RIRD campus in Krishnagiri Dam | ||||||||
| 2.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick including levelling the sites complete complying with standard specifications. | 8.89 | Cum | 250 ₹2,222.5 | 200 ₹1,778 Lowest | 226 ₹2,009.14 | 225 ₹2,000.25 | 227 ₹2,018.03 |
| 3.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 4.08 | Cum | 5,000 ₹20,400 | 5,000 ₹20,400 | 4,598 ₹18,759.84 | 4,578 ₹18,678.24 Lowest | 4,608 ₹18,800.64 |
| 4.00 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush including curing neat finishing, etc., complete complying with standard specifiction. | 8.14 | Cum | 5,000 ₹40,700 | 5,500 ₹44,770 | 4,918 ₹40,032.52 | 4,897 ₹39,861.58 Lowest | 4,930 ₹40,130.2 |
| 5.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including cost and labour charges etc., complete. | 5.41 | Cum | 150 ₹811.5 | 25 ₹135.25 Lowest | 39 ₹210.99 | 39 ₹210.99 | 39 ₹210.99 |
| 6.00 | BRICK WORK in cement mortar 1:5 using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. | 10.2 | Cum | 6,000 ₹61,200 | 6,000 ₹61,200 | 5,279 ₹53,845.8 | 5,256 ₹53,611.2 Lowest | 5,291 ₹53,968.2 |
| 7.00 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. | 24.48 | Sqm | 900 ₹22,032 Lowest | 1,000 ₹24,480 | 940 ₹23,011.2 | 935 ₹22,888.8 | 942 ₹23,060.16 |
| 8.00 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. | 0.33 | Mt | 90,000 ₹30,060 | 90,000 ₹30,060 | 78,815 ₹26,324.21 | 78,475 ₹26,210.65 Lowest | 78,998 ₹26,385.33 |
| 9.00 | CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers. | 2.96 | Cum | 8,500 ₹25,160 | 9,000 ₹26,640 | 7,791 ₹23,061.36 | 7,757 ₹22,960.72 Lowest | 7,809 ₹23,114.64 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 15.45 | Sqm | 250 ₹3,862.5 Lowest | 300 ₹4,635 | 265 ₹4,094.25 | 264 ₹4,078.8 | 266 ₹4,109.7 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
22 Sept 2026, 3:00 pmClosed
Block Developement officer
Block Developement office, Krishnagiri
Krishnagiri District Krishnagiri Block SFC - 2026-27 Construction of Ladies Toilet at RIRD campus in Krishnagiri Dam Pkg No 2026-27 KGI 10
2026_RDTN_699681_1
Roc_No_2889_25_R3_Dt_18_8_26
Open Tender
Civil Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Block Developement office, Krishnagiri
25 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Ladies Toilet at RIRD campus in Krishnagiri Dam | - | - | - | - |
| 2 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick including levelling the sites complete complying with standard specifications. | - | Cum | - | - |
| 3 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | - | Cum | - | - |
| 4 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush including curing neat finishing, etc., complete complying with standard specifiction. | - | Cum | - | - |
| 5 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including cost and labour charges etc., complete. | - | Cum | - | - |
| 6 | BRICK WORK in cement mortar 1:5 using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. | 1 | Cum | - | - |
| 7 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.50cm spaced at about 90cm centre to centre and supported by Casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed. | - | Sqm | - | - |
| 8 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. | - | Mt | - | - |
| 9 | CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 (One cement and three sand ) and Kraft paper laid without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers. | - | Cum | - | - |
| 10 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 1 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
pb10.pdf
Tender Documents • 0.76 MB
tb10.pdf
Tender Documents • 1.23 MB
BOQ_841096.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .