Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.2 LAdmitted-Finance | -35.98% | ₹41.2 L | L1 | Admitted-Finance |
| 2 | L2₹50.8 LAdmitted-Finance | -20.99% | ₹50.8 L | L2 | Admitted-Finance |
| 3 | L3₹51.4 LAdmitted-Finance AT PATAKUNDIA PO MORADA DIST MAYURBHANJ PIN 757020 | MAYURBHANJ | MAYURBHANJ | ODISHA | 757020 | -19.99% | ₹51.4 L | L3 | Admitted-Finance |
| 4 | L4₹52.3 LAdmitted-Finance AT SALAGADIA PO MAJHIGADIA VIA PS KAPTIPADA DIST MAYURBHANJ | -18.70% | ₹52.3 L | L4 | Admitted-Finance |
| 5 | L5₹57.5 LAdmitted-Finance | -10.60% | ₹57.5 L | L5 | Admitted-Finance |
Tender Value
₹64.3 L
EMD Value
₹64,300
Closing Date
11 May 2026, 1:00 pmClosed
Superintending Engineer
O/o the SE, Kendrapara Irr. Division, Kendrapara
Embankment protection
2026_KIRRD_128654_8
e-Procurement Notice No.KID-01 of 2026-27
National Competitive Bid
Civil Works - Others
180 days
Kendrapara
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹64,300
Yes
25 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
30 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated materials clear of worksite with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, hire and running charges of all machineries, labour welfare cess etc. complete in all respect as per specification and direction of the Engineer-in-Charge. | 14.4 | One Cum. | 171.7 | ₹2,472.48 |
| 2 | Quarrying,Collecting, supplying and stacking hard granite stone boulder of 15cm to 30cm size from approved quarry at work site with conveying from stacks & rough stone dry packing in aprons and revetments of the slope of the embankment including filling interstices with small stones wedging and hammering with cost, conveyance, royalty T & P, labour charges , cess and all other taxes of materials, all incidential charges, quality control test etc. complete as per direction of the Engineer-in-charge.(Measurement will be taken on finished level section.) | 170.33 | One Cum. | 2,725.4 | ₹4,64,217.38 |
| 3 | Quarrying,collecting,supplying and stacking of hard granite stone boulder of at least 30cm in length in any direction, 50kg. in weight and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials dumping the stones in rip raps, spur and slope protection works including filling the interstices with small stones wedging and packing surface to proper line leveles including fixing wave breakers etc.including cost,conveyance,royalty taxes of all materials of approved quality with uniform colour and texture from approved quarry with all leads,lifts delifts including dumping in water hire charges of boats, lunch etc. and all other incidental charges with quality control test etc.complete asper specification and direction of the Engineer in Charge (Measurement to be taken in level section & 1/6th voids will be deducted from the finished levelsection and payment will be made to the quantity so arrived between the stack measurement and level section after deduction of 1/6th voids, which ever is less). | 2,692.1 | One Cum. | 2,215.1 | ₹59,63,270.71 |
stage.html
html • 0.17 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
TechBidKID_08.pdf
Tender Documents • 2.33 MB
BOQ_589215.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid