Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹4.7 L+₹3,702.92 (0.79%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹5.7 L+₹1.0 L (21.5%)Rejected-Finance KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | L-3 | Rejected-Finance L-3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Eligible |
Tender Value
₹4.9 L
EMD Value
₹9,853
Closing Date
12 May 2025, 5:00 pmClosed
VARUN SINGH
MD - Hisar
The work of Supply, Installation, Painting and Commissioning of Rolling Shutter in Mechanical Workshops at Hisar and Fatehabad
2025_HRY_444302_1
2025E162E56B 4D7A 4ED9 B747 E436CA3A60F6673BAR
Open Tender
Machineries/ Mechanical Engg Items
Works
45 days
Hisar
2 documents required · 2 mandatory
₹500
₹9,853
Yes
Hisar
16 Jul 2025
2 May 2025
13 May 2025
5 May 2025
12 May 2025
5 May 2025
7 May 2025
Amount
[11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate]
[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.60]Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. [Through Rate]
[11.73.1]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 1. On steel work [Through Rate]
[13.37.2]Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 2. 80x1.20 mm M.S. laths with 1.20 mm thick top cover [Through Rate]
[13.38]Providing and fixing ball bearing for rolling shutters. [Through Rate]
[13.39.1]Extra for providing mechanical device chain and crank operation for operating rolling shutters. 1. Exceeding 10.00 sqm and up to 16.80 sqm in the area [Through Rate]
[13.39.2]Extra for providing mechanical device chain and crank operation for operating rolling shutters. 2. Exceeding 16.80 sqm in area [Through Rate]
[30.21]Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete [Through Rate]
[30.24]Distempering with dry distemper of approved brand and manufacture (one or more coats) and of required shade on old work to give an even shade. [Through Rate]
[5.45]Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
AP CONSTRUCTION COMPANY (BID ID -1259334)
Parveen Kumar Contractor (BID ID -1259428)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .