Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-Finance 267 1 B KULAKARAI STREET PATTRAVAKKAM NEXT TO SIDCO 145 CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹41.8 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹45.6 LAccepted-Finance NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹45.6 L | L2 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | MICRO SPARES L1 | SAHIRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Identification, rectification of tube puncture up to 10 Joints including Arc filling by spool piece, edge preparation and welding by IBR welder and assisting for hydraulic test. (Spl.Welding electrode/Filler wire will be provided by TNPGCL). Including consumables and hire charges of T&P's. | 20 | Times | 97,000 ₹19.4 L | 1,05,000 ₹21 L |
| 2.10 | Renewal of punctured boiler tubes ( each tube have two joints ) of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's. (Spl.Welding electrode/Filler wire will be provided by TNPGCL). | 90 | Nos | 7,800 ₹7.0 L | 8,500 ₹7.7 L |
| 2.20 | Charges for renewal of defective/puncture boiler tubes ( each tube have two joints ) of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's. | 70 | Times | 5,380 ₹3.8 L | 5,900 ₹4.1 L |
| 3.00 | Tube rectification by window cutting:Tube rectification by window cutting and welding: Marking of defective tubes identified, cutting of defective portion of tubes, edge preparation, welding of new spool piece with IBR welder. Window cutting on the tube, edge preparation, welding of new piece with IBR Welder. Including consumable and hire charges for T&P's.(Spl.Welding electrode/Filler wire will be provided by TNPGCL). | 16 | Nos | 7,300 ₹1.2 L | 8,000 ₹1.3 L |
| 4.00 | Strengthening of eroded existing joints:This work involves identification of less eroded existing joints, Grinding metal filling by welding with IBR welder. Including consumable and hire charges for T&P's. | 100 | Joints | 960 ₹96,000 | 1,000 ₹1 L |
| 5.00 | Erosion Filling: Charges IBR Welder for Arc filling of area 25 x 150 mm by 3 layer. Including consumable and hire charges for T&P's. | 80 | Nos | 1,730 ₹1.4 L | 1,900 ₹1.5 L |
| 6.00 | Charges for fin welding: Charges for fin welding by cleaning, surface preparation and welding. Including consumable and hire charges for T&P's. | 90 | mtrs. | 880 ₹79,200 | 1,000 ₹90,000 |
| 7.00 | Skin casing welding and patch up work in Boiler area: This work involves removing refractory, cutting the damaged existing skin casing sheet where ever required, Welding with new skin casing sheet. Including consumable and hire charges for T&P's. (MS/Skin casing sheet will be provided by TNPGCL). | 25 | m2 | 7,970 ₹2.0 L | 8,500 ₹2.1 L |
| 8.00 | Patch up Refractory: Chipping removal of defective refractory, cleaning, surface preparation, patch work new refractory in various elevation of Boiler. Charges including transporting the refractory from stores and unloading at site, leading, lifting and removing the waste refractory from Boiler lowering to the ground floor, loading to tipper and disposing at waste disposal area, consumable and hire charges for T&P's. (Castable refractory will be provided by TNPGCL). | 400 | Kgs | 24.5 ₹9,800 | 30 ₹12,000 |
| 9.00 | Renewal for safety valve flange gasket: This work involves dismantling safety valve flange, cutting gasket for required size, renewal of gasket and assembling of safety valve properly. (Gasket will be supplied by the TNPGCL) Including consumables and hire charges for T&Ps. | 2 | Nos | 7,800 ₹15,600 | 8,500 ₹17,000 |
Tender Value
Refer Docs
EMD Value
₹50,100
Closing Date
12 Feb 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle AMC 26 27 BM Dn Unit I II III Attending boiler tube puncture and Breakdown works during shutdown for the period from the date of handing over of site up to 31 03 2027 or completion of quantity
2026_EB_648500_1
CE SE MI NCTPS I 291 25 26
Open Tender
Power/Energy Projects/Products
365 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,100
Yes
10 Mar 2026
29 Jan 2026
13 Feb 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
Identification, rectification of tube puncture up to 10 Joints including Arc filling by spool piece, edge preparation and welding by IBR welder and assisting for hydraulic test. (Spl.Welding electrode/Filler wire will be provided by TNPGCL). Including consumables and hire charges of T&P's.
Renewal of punctured boiler tubes ( each tube have two joints ) of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's. (Spl.Welding electrode/Filler wire will be provided by TNPGCL).
Charges for renewal of defective/puncture boiler tubes ( each tube have two joints ) of size 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. Including consumable and hire charges for T&P's.
Tube rectification by window cutting:Tube rectification by window cutting and welding: Marking of defective tubes identified, cutting of defective portion of tubes, edge preparation, welding of new spool piece with IBR welder. Window cutting on the tube, edge preparation, welding of new piece with IBR Welder. Including consumable and hire charges for T&P's.(Spl.Welding electrode/Filler wire will be provided by TNPGCL).
Strengthening of eroded existing joints:This work involves identification of less eroded existing joints, Grinding metal filling by welding with IBR welder. Including consumable and hire charges for T&P's.
Erosion Filling: Charges IBR Welder for Arc filling of area 25 x 150 mm by 3 layer. Including consumable and hire charges for T&P's.
Charges for fin welding: Charges for fin welding by cleaning, surface preparation and welding. Including consumable and hire charges for T&P's.
Skin casing welding and patch up work in Boiler area: This work involves removing refractory, cutting the damaged existing skin casing sheet where ever required, Welding with new skin casing sheet. Including consumable and hire charges for T&P's. (MS/Skin casing sheet will be provided by TNPGCL).
Patch up Refractory: Chipping removal of defective refractory, cleaning, surface preparation, patch work new refractory in various elevation of Boiler. Charges including transporting the refractory from stores and unloading at site, leading, lifting and removing the waste refractory from Boiler lowering to the ground floor, loading to tipper and disposing at waste disposal area, consumable and hire charges for T&P's. (Castable refractory will be provided by TNPGCL).
Renewal for safety valve flange gasket: This work involves dismantling safety valve flange, cutting gasket for required size, renewal of gasket and assembling of safety valve properly. (Gasket will be supplied by the TNPGCL) Including consumables and hire charges for T&Ps.
Charges for cutting and replacing the defective valve of size up to 25 mm Rate for 3 valves (For valves of size up to 25 mm). Including consumables and hire charges for T&P’s.
Cutting and replacing the defective valves for valves of size 40 mm to 50 mm. Including consumables and hire charges for T&P’s.
Cutting, edge preparation and welding of 1” pipe line, tee elbows, bends in Boiler pressure parts by IBR welder etc. at joints. Including consumables and hire charges for T&P’s.
Dismantling of steel structural in Boilers. Including consumables and hire charges for T&P’s.
Ash choke cleaning work in the air vent tray:Charges for cutting the choked boiler vent drain pipeline, in the bend portion to remove the ash choke from 52 mtr to ‘0’ mtr level of boiler and including cutting &re-welding the pipe line after removing of ash choke. Including consumable and hire charges for T&P's.
Removal of accumulated ash in penthouse, roof, ceiling girder and rear arch enclosure. Removal of accumulated ash in boiler pent house, I&II pass boiler roof, ceiling girders, drum enclosure area between I Pass &II pass. Including consumable and hire charges for T&P's.
Charges for Leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. Including consumable and hire charges for T&P's.
Inspection of critical steam pipe line hanger supports assemblies. Providing necessary scaffolding, checking the hangers hot and cold setting readings and adjustments, minor rectifications if any. Including consumable and hire charges for T&P's.
Charges for bending of various size of boiler tubes, Including consumables and hire charges of T&P’s.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_777488.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid