| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance CAMP OFFICE POST KHERI TEHSIL DALHOUSIE DISTRICT CHAMBA HIMACHAL PRADESH 176325 | CHAMBA | HIMACHAL PRADESH | 176325 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹13.4 L (11.2%)Admitted-Finance | ₹1.3 Cr+₹13.4 L (11.2%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹29.1 L (24.2%)Admitted-Finance VILLAGE POST SURANGANI TEHSIL SALOONI DISTT CHAMBA HIMACHAL PRADESH 176317 | CHAMBA | HIMACHAL PRADESH | 176317 | ₹1.5 Cr+₹29.1 L (24.2%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sahab Singh Thakur L3 | Bhalei Construction L1 | M/S aastha constraction company L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 8.38 | cum | 13,156.6 ₹15,524.79 | 4,600.62 ₹5,428.73 Lowest | 10,894 ₹12,854.92 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 80.81 | cum | 14,949.85 ₹17,640.82 | 12,040.69 ₹14,208.01 Lowest | 12,121.5 ₹14,303.37 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of entering and shuttering-All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 10.76 | cum | 62,946 ₹74,276.28 | 46,257.24 ₹54,583.54 Lowest | 55,952 ₹66,023.36 |
| 4.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1cement : 2 coarse sand): 4 graded stone aggregate 12.5mm nominal size) | 11.16 | Sqm | 3,459.6 ₹4,082.33 | 3,113.64 ₹3,674.1 | 2,790 ₹3,292.2 Lowest |
| 5.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) Details of | 16.74 | cum | 90,396 ₹1,06,667.28 | 75,313.26 ₹88,869.65 | 72,819 ₹85,926.42 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 51.72 | Sqm | 11,999.04 ₹14,158.87 | 7,189.08 ₹8,483.11 Lowest | 9,826.8 ₹11,595.62 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 36 | Sqm | 19,800 ₹23,364 | 5,364 ₹6,329.52 Lowest | 16,200 ₹19,116 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers | 89.21 | Sqm | 36,665.31 ₹43,265.07 | 13,292.29 ₹15,684.9 Lowest | 28,993.25 ₹34,212.04 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Suspendedfloors, roofs, landings,balconies and access platform | 43.44 | Sqm | 21,720 ₹25,629.6 | 6,906.96 ₹8,150.21 Lowest | 17,376 ₹20,503.68 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls Under 20 cm wide | 21 | M | 2,940 ₹3,469.2 | 1,029 ₹1,214.22 Lowest | 2,520 ₹2,973.6 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
23 May 2026, 5:00 pmClosed
Dy General Manager (PnC)
Procurement and Contract Wing, CPS-I Khairi Distt. Chamba (HP) 176325.
Renovation work of administrative building of Chamera Power Station-1, Khairi.
2026_NHPC_906536_1
NH/CPS-1/PnC/W-1613/2026-27/ 12 Dated 25/04/2026
Open Tender
Civil Works - Buildings
Works
180 days
Chamera Power Station-1, Khairi, Distt-Chamba (HP)
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
NHPC LIMITED
₹2.5 L
Yes
5 Aug 2026
25 Apr 2026
27 May 2026
25 Apr 2026
23 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 8.38 | cum | 1 | ₹8.38 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 80.81 | cum | 1 | ₹80.81 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of entering and shuttering-All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) | 10.76 | cum | 1 | ₹10.76 |
| 4 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1cement : 2 coarse sand): 4 graded stone aggregate 12.5mm nominal size) | 11.16 | Sqm | 1 | ₹11.16 |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) Details of | 16.74 | cum | 1 | ₹16.74 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 51.72 | Sqm | 1 | ₹51.72 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 36 | Sqm | 1 | ₹36 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers | 89.21 | Sqm | 1 | ₹89.21 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspendedfloors, roofs, landings,balconies and access platform | 43.44 | Sqm | 1 | ₹43.44 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls Under 20 cm wide | 21 | M | 1 | ₹21 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Tender.pdf
Tender Documents • 18.30 MB
BOQ_952858.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .