| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹2.1 CrAccepted-AOC PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹2.1 Cr | L3 | Accepted-AOC The L1 bidder was inadvertenly entered as L3 due to a clerical error |
| 2 | L1₹2.3 CrRejected-AOC | ₹2.3 Cr | L1 | Rejected-AOC L3 |
| 3 | L2₹2.1 CrRejected-AOC | ₹2.1 Cr | L2 | Rejected-AOC L2 |
| 4 | L4₹2.4 CrRejected-AOC | ₹2.4 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹2.4 CrRejected-AOC NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | ₹2.4 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | J.Rajalakshmi L3 | Dillibabu L2 | K S CONSTRUCTION L1 | PERUMAL.S.K L5 | THE INDIA POWER FUTURE L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 2,400 | M2 | 8 ₹19,200 | 1 ₹2,400 | 10 ₹24,000 | 0.01 ₹24 | 50 ₹1.2 L |
| 2.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 1,831 | M3 | 100 ₹1.8 L | 150 ₹2.7 L | 150 ₹2.7 L | 100 ₹1.8 L | 200 ₹3.7 L |
| 3.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting | 108 | M3 | 176 ₹19,008 | 5 ₹540 | 150 ₹16,200 | 0.01 ₹1.08 | 10 ₹1,080 |
| 4.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting | 108 | M3 | 250 ₹27,000 | 5 ₹540 | 150 ₹16,200 | 0.01 ₹1.08 | 10 ₹1,080 |
| 5.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape | 108 | M3 | 1,100 ₹1.2 L | 5 ₹540 | 150 ₹16,200 | 0.01 ₹1.08 | 10 ₹1,080 |
| 6.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 159 | M3 | 1,400 ₹2.2 L | 100 ₹15,900 | 1,000 ₹1.6 L | 0.01 ₹1.59 | 1,300 ₹2.1 L |
| 7.00 | Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete | 200 | M3 | 1,000 ₹2 L | 5 ₹1,000 | 25 ₹5,000 | 0.01 ₹2 | 50 ₹10,000 |
| 8.00 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 275 | M3 | 36 ₹9,900 | 5 ₹1,375 | 100 ₹27,500 | 0.01 ₹2.75 | 50 ₹13,750 |
| 9.00 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 137.6 | M3 | 6,000 ₹8.3 L | 3,000 ₹4.1 L | 5,000 ₹6.9 L | 4,500 ₹6.2 L | 4,000 ₹5.5 L |
| 10.00 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 418 | M3 | 8,000 ₹33.4 L | 7,000 ₹29.3 L | 5,500 ₹23.0 L | 7,000 ₹29.3 L | 7,900 ₹33.0 L |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
15 Dec 2025, 2:30 pmClosed
CE/TP-I/CNI
230 KV GIS SS Guindy Chennai 32
Providing 110 11 kvyar equipment plinth cable trench and allied civil works proposed Sembakkam 110 11 KV SS
2025_EB_628902_1
TP1-108/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
120 days
Sembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.2 L
27 Mar 2026
4 Dec 2025
16 Dec 2025
4 Dec 2025
15 Dec 2025
4 Dec 2025
Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Soft disintegrated rock not requirng blasting
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. Removal of hard rock by wedging and chiselling and trimming to proper shape
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Transporting the surplus excavated earth, debris etc away from the site to a lead of 5km including cost of all lead, lift, conveyance , loading, unloading etc. complete
Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete.
R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site.
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- RCC wall
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (Above3 column level)- Precast slab
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing Grout holes for equipment structures including cost of all materials, form work , labour, lead, lift etc. complete.
Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site
Providing, Transporting and fixing of 90 LBS Rail in correct position and level as directed by the Department Engineer at site including cost of rail, cutting charges, transport to site, etc., complete
Plastering with cm 1:5 mix using 12mm thick for inside & outside walls including cost of all materials, labour, lead, lift etc complete
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 32mm
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 25mm
Supplying and fixing GM wheel valve of approved brand (leader) ISI quality including cost of all materials, labour etc. complete 20mm
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 32MM DIA PVC PIPE
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 25MM DIA PVC PIPE
Providing and laying PVC high density pipe including cost of all specials like coupling, bend etc., and including necessary earthwork and burrying , all material labour, etc., complete. 20MM DIA PVC PIPE
Levelling the ups and downs of the location by engaging JCB for marking of foundations, etc., with all hire charges etc complete.
Colour washing and Painting 2 coats with approved Plastic Emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceiling and other new surface and including cleaning ,preparing the surface and curing etc.complete.
Dismantling PCC met with below ground level during execution including labour, tools etc. complete.
Dismantling RCC met with below ground level during execution including labour, tools etc. complete.
Dismantling brick/ stone masonry in cement mortar met with below ground level during execution including labour, tools etc. complete.
Supplying and fixing GI angle channel etc, wherever required as directed by the Engineer at site.
Supplying and fixing of GI chain link fencing of size 50x50mm using 10 Gauge Galvanised Iron Wire, 1.80m ht including cost of all materials, labour, lead, lift etc.complete and as directed by the Engineer-in-charge at site.
Filling with good quality gravel including cost of material, labour all lead and lift etc . Complete.
Filling with stone dust including cost of metal ,labour all lead and lift etc. Complete.
Filling with 20 mm B.G metal including cost of metal ,labour all lead and lift etc . Complete.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_752041.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid