| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC PLOT NO 178 A MLA COLONY ROAD NO 12 BANJARA HILLS HYDERABAD 500 034 | HYDERABAD | TELANGANA | 500034 | ₹1.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.6 Cr+₹28.8 L (22.5%)Rejected-Finance | ₹1.6 Cr+₹28.8 L (22.5%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹1.6 Cr+₹30.5 L (23.7%)Rejected-Finance | ₹1.6 Cr+₹30.5 L (23.7%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹1.7 Cr+₹41.5 L (32.3%)Rejected-Finance | ₹1.7 Cr+₹41.5 L (32.3%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹1.8 Cr+₹48.3 L (37.6%)Rejected-Finance FLAT NO 5 10 3 73 6 AMAR APARTMENTS TEACHERS COLONY EAST MARREDPALLY SECUNDERABAD 500026 | SECUNDERABAD | HYDERABAD | TELANGANA | 500026 | ₹1.8 Cr+₹48.3 L (37.6%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
19 Nov 2021, 6:00 pmClosed
CWE (ARMY) SECUNDERABAD
CWE (ARMY) MUDFORT COMPLEX, SECUNDERABAD- 500003
CONSTRUCTION OF SPORTS COMPLEX IN DAD RESIDENTIAL COMPLEX AT SECUNDERABAD
2021_MES_477629_1
CWE(S)/UTILITY/TOKEN-18 OF 2021-2022
Open Tender
Civil Works
Lump-sum
270 days
Secunderabad
As per NIT
7 documents required · 7 mandatory
₹1,000
GE(south) Secunderabad
₹2.2 L
Yes
16 Dec 2021
24 Sept 2021
27 Nov 2021
24 Sept 2021
19 Nov 2021
6 Nov 2021
Amount
Schedule 'A' Part I This Schedule is not pre-priced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Col 7.
Lump sum price worked out by the tenderer for "Construction of sports complex in single storey including gym hall, entrance porch, toilet and office with RCC framed structure, PCC blocks masonry complete all as shown on drawings as specified and directed " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the Contractor for “ROAD/PATH/CULVERT (HARD STANDING) " as listed in Schedule ‘A’ Part-II Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.1,83,494.70 inserted by the MES in Schedule ‘A’ Part-II
Lump sum price worked out by the Contractor for “SITE CLEARANCE AND DEVELOPMENT / RETAINING WALL” as listed in Schedule ‘A’ Part-III Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 5,50,607.08 inserted by the MES in Schedule ‘A’ Part-III
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 4,28,954.63 inserted by the MES in Schedule ‘A’ Part-IV
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-V Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs 2,69,048.09 inserted by the MES in Schedule ‘A’ Part-V
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VI Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 20,433.51 inserted by the MES in Schedule ‘A’ Part-VI
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VII Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.72,011.11 inserted by the MES in Schedule ‘A’ Part-VII
Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part- VIII Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.1,81,502.87 inserted by the MES in Schedule ‘A’ Part- VIII
Lump sum price worked out by the Contractor for “AREA DRAINAGE ” as listed in Schedule ‘A’ Part- IX Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.6,40,984.94 inserted by the MES in Schedule ‘A’ Part- IX
Schedule 'A' Part X (MISCELLANEOUS) This Schedule is not prepriced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Column 7. This Schedule consists of items Serially numbered as 10.01 to 10.25
Rate for item No. 01 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 02 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 03 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 04 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 05 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 06 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 07 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 08 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 09 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 10 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 11 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 12 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 13 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 14 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 15 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 16 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No.17 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 18 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 19 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 20 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 21 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 22 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 23 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No. 24 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
Rate for item No.25 as listed in Schedule 'A' Part -X (MISCELLANEOUS)
A SOMA RAJU
c devender reddy and co
POWER CONSTRUCTION COMPANY
B.N.S Constructions
M/s RAMA LAKSHMI CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .