Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
1 Oct 2026, 6:00 pm
CWE NO.2 Secunderabad
CWE NO.2, MUDFORT, SECUNDERABAD- 500003
PROVISION OF TOILET BLOCK COMPLEX NEAR AGNIVEERS TRAINING AREA AND ALLIED INFRA AT THE MARATHA LIRC BELAGAVI
2026_MES_786703_1
81364/E8
Open Tender
Civil Works
Lump-sum
270 days
GE BELAGAUM
As per tender documents
10 documents required · 10 mandatory
₹1,000
GE Belagaum
₹1.9 L
Yes
27 Aug 2026
27 Aug 2026
5 Oct 2026
27 Aug 2026
1 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part - I BUILDINGS & STRUCTURES This Schedule contains Sl item No. 1.01 & 1.02 which are not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. | |||||
| 1.01 | Construction of Toilet Block - 1 in single storey with RCC framed structure including all fittings and fixtures complete all as specified and as shown on drawings. | 2 | Each Block | - | - |
| 1.02 | Construction of Toilet Block - 2 in single storey with RCC framed structure including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | - | - |
| - | Lumpsum price worked out by the Contractor for “ EARTHWORK AND EXCAVATION” as listed in Schedule ‘A’ Part-II Representing ** ____ % ____ percent *Above / Below the lumpsum price of ₹ 2,73,303.07 inserted by the MES in Schedule ‘A’ Part-II | 1 | Lumpsum | 2,73,303.07 | ₹2,73,303.07 |
| - | Lumpsum price worked out by the Contractor for “PATH” as listed in Schedule ‘A’ Part-III Representing ** ____ % ____ percent *Above / Below the lumpsum price of ₹ 2,01,660.65 inserted by the MES in Schedule ‘A’ Part-III | 1 | Lumpsum | 2,01,660.65 | ₹2,01,660.65 |
| - | Lumpsum price worked out by the Contractor for “SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-III Representing ** ____ % ____ percent *Above / Below the lumpsum price of ₹ 6,14,051.64 inserted by the MES in Schedule ‘A’ Part- IV | 1 | Lumpsum | 6,14,051.64 | ₹6,14,051.64 |
| - | Lumpsum price worked out by the Contractor for “INTERNAL ELECTRIFICATION " as listed in Schedule ‘A’ Part-V Representing ** ____ % ____ percent *Above / Below the lumpsum price of ₹ 1,10,081.30 inserted by the MES in Schedule ‘A’ Part-V | 1 | Lumpsum | 1,10,081.3 | ₹1,10,081.3 |
| - | Lumpsum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VI representing ** ____ % ____ percent *Above / Below the lumpsum price of ₹ 1,54,051.71 inserted by the MES in Schedule ‘A’ Part-VI | 1 | Lumpsum | 1,54,051.71 | ₹1,54,051.71 |
| - | Lumpsum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION ” as listed in Schedule ‘A’ Part-VII representing ** ___% _____ percent *Above / Below the lumpsum price of ₹ 2,22,775.50 inserted by the MES in Schedule ‘A’ Part-VII | 1 | Lumpsum | 2,22,775.5 | ₹2,22,775.5 |
| - | Lumpsum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VIII representing ** ___ % ___ percent *Above / Below the lumpsum price of ₹2,27,886.86 inserted by the MES in Schedule ‘A’ Part-VIII | 1 | Lumpsum | 2,27,886.86 | ₹2,27,886.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tender.pdf
Tender Documents • 1.81 MB
BOQ_881611.xls
BOQ • 0.26 MB
Prepriced.pdf
Additional Documents • 0.26 MB
STRUCTURALARCHITECTURAL.pdf
Additional Documents • 26.32 MB
TDdrawings.pdf
Additional Documents • 7.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .