| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.7 LAccepted-AOC 10 208 MOTTOR PALLIPATTY PO MALLIKUNDAM VIA METTUR TK SALEMDT 636458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹82.7 L Quoted ₹87.6 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | M A M CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00 | Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete | 3,156 | M2 | 7 ₹22,092 |
| 2.00 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete. | 5 | Loc | 2,540 ₹12,700 |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard gravelly soil | 125 | cum | 140 ₹17,500 |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In soft distengrated rock not requiring blasting | 21 | cum | 212 ₹4,452 |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In medium rock and dense medium rock not requiring blasting | 21 | cum | 372 ₹7,812 |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring blasting | 21 | cum | 1,006 ₹21,126 |
| 7.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring Wedging and chesiling | 21 | cum | 2,012 ₹42,252 |
| 8.00 | Fixing of stub and cleat with supply of template for HCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. | 1 | Loc | 25,115 ₹25,115 |
| 9.00 | Fixing of stub and cleat with supply of template for KCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete. | 1 | Loc | 31,463 ₹31,463 |
| 10.00 | PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead,lift and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P etc complete.as directed by the Engineer at site. | 8 | cum | 7,486 ₹59,888 |
Tender Value
Refer Docs
EMD Value
₹73,100
Closing Date
15 Dec 2025, 2:30 pmClosed
CE/TP-I/CNI
230 KV GIS SS Guindy Chennai 32
Earth work stub setting concreting supply transport DC tower stringing ACSR Panther conductor OPGW cable making LILO of Deviyakurichi Singapuram feeder proposed Vadachennimalai 110 22 KV at Valayamadevi
2025_EB_628920_1
TP1-133/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
120 days
Vadachennimalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹73,100
9 Apr 2026
4 Dec 2025
16 Dec 2025
4 Dec 2025
15 Dec 2025
4 Dec 2025
Clearing Light jungle for carrying out the Stub-setting & stringing work with all lead, lift including cost of T & P, labour etc. complete
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour,all lead, all lift and all head load etc complete.
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In medium rock and dense medium rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring Wedging and chesiling
Fixing of stub and cleat with supply of template for HCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete.
Fixing of stub and cleat with supply of template for KCR tower to site and assembling at site and shifting the template from loc to loc including cost of all materials for stub and cleat and template ,labour, fabrication charges etc complete.
PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead,lift and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P etc complete.as directed by the Engineer at site.
PCC 1:2:4 using 20mm HBG metal for foundation with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete, labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P etc complete.
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for HCR (dry tower)
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for KCR (dry tower)
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete for DP tower (Dry)
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
Providing Special type earthing arrangements for Teriminal tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Transportation from source to site and sorting out of tower parts, erection of GI tower angles, fabrication of tower angles (if required) and punching of bolts and nuts immediately after erection of towers, tightening , punching , final checking, providing holes wherever necessary and final checking etc., including cost of materials, T & P,labour, lead, lift, painting of bolts for identification including cost of all labour charges etc., complete. etc complete. as per approved drawing and specification For Double Circuit Towers
Labour charges for fabrication, painting and erection charges for DP structure Heavy section tower parts ie., section weight above 14 kg including all cost of labour,lead, lift, T & P etc complete.
Labour charges for fabrication, painting and erection charges for DP structure Light section tower parts ie., section weight below 14 kg including all cost of labour,lead, lift, T & P etc complete.
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Transporting from source to site and Hoisting of 7 units of single suspension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.
Transporting from source to site and Hoisting of 8 units of single Tension insulators and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete.
Labour charges for Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from all TANTRANSCO GCC Stores, labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Kms.
Labour charges for Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including sorting out of conductor at site, transport charges from store labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Span under LC condition
Labour charges for Re-Stringing of 6 Nos ACSR Panther conductor in between angle point towers with intermediate suspension towers including rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p including cost of all materials, labour lead lift t&p etc complete. for Span under LC condition
Labour charges for stringing of GI earth wire with fixing of hardware fittings and accessories etc. complete for the line including sorting out of conductor at site, transport charges from store , labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p clipping providing jumpers, fixing of alu.earth bonds etc with all labour lead lift, testing and commisioning etc complete. for Kms.
Labour charges for Erection, stringing of OPGW 48 fibre wire with fixing of hardware fittings and accessories etc. complete for the line including sorting out of conductor at site, transport charges from all TANTRANSCO GCC Stores, labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p clipping providing jumpers, fixing of alu.earth bonds etc with all labour lead lift, testing and commisioning etc complete. for Span under LC condition
Labour charges for fixing of number plates, danger board, phase plate including all cost of materials, abour transport, lead, lift, etc complete
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete
Providing independent temporary guys for sets of cross arm of each 3 Nos including digging of trench for a size of 6' x 2' x 6', supplying and placing in the digged pit of RSJ/Concrete Block/Wooden log of 50kgs weight,tying the cross arm with the wooden log/RSJ/Concrete with the help of GI earthwire, distance of 1 1/2 x Height of tower, refilling the trench and relaesing after completion of work etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete
Providing Loop jumpers and removal of the same after commissioning of the 110 line including cost of all materials, labour lead llift T&P etc complete
Releasing, lowering of existing 8 Nos. tension insulator with fittings and Rehoisting after completion of new line stringing including all labour,transport lead, lifts, T&P, etc complete.
Releasing lowering of exsiting 6 Nos of Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC Condition,
Labour charges for releasing, Lowering of existing 1 No of OPGW including lead, lift, labour and cost of T&P etc complete. Under LC Condition,
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply, Transportation from source to site of RS joist, MS channels, Angles of Heavy section , section weight above 14 kg as per department approved drawing/design including stacking of parts, transporting of parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 , The governing standards should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supply & Transportation from source to site of MS Angles light section , section weight below 14 kg as per department approved drawing/design including stacking of parts, transporting of parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 , The governing standards should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supply of line materials ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials OPGW 48 fibre with all accessories as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials GI earthwire 7/3.55mm as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 90 KN ordinary disc insulator for Suspension as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of line materials 120 KN ordinary disc insulator for Tension as per IS standard and departmental specifications including cost of all mate
rials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply, transport and fixing of Single Tension fittings for panther as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Single Suspension fittings for Panther as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of SB damber for panther as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Aluminium Earth Bond as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Single tension fittings for EW 7/3.55mm as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Mid span joint for Panther as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Mid span joint for Earth wire as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of Repair sleeve for Panther as per IS standard and departmental specifications by the engineer incharge at site.
Supply,Transport of Number Plate as per IS standard and departmental specifications by the engineer incharge at site.
Supply,Transport of Phase Plate as per IS standard and departmental specifications by the engineer incharge at site.
Supply,Transport of Danger Board as per IS standard and departmental specifications by the engineer incharge at site.
Supply, transport and fixing of PG Clamp as per IS standard and departmental specifications by the engineer incharge at site.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_752056.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid