Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC | ₹24.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹24.9 LRejected-AOC | ₹24.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.Athikesavan L2 | Alagesan Contractor L1 |
|---|---|---|---|---|---|
| 1.001.Formation of New Diversion Channel and Improvements of Existing Channel For River Diversion Work From Kadaparai River to Puliyanur PWD Tank H/o Singarapettai Estimate Amount : Rs.25.00Lakhs | |||||
| 2.00 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete | 11,317 | Cum | 46.27 ₹5.2 L | 45.78 ₹5.2 L |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 495 | Cum | 91.42 ₹45,252.90 | 90.46 ₹44,777.70 |
| 4.00 | Earth Work Excavation and deposting on bank with initial lead and lift as per SS20B & Sl 62 Single Rate | 1,104.18 | Cum | 133.24 ₹1.5 L | 131.84 ₹1.5 L |
| 5.00 | Earth Work Excavation for Foundation in Medium rock and dense Medium required Blasting | 1,104.18 | Cum | 479.19 ₹5.3 L | 474.16 ₹5.2 L |
| 6.00 | Earth Work Excavation and deposting on bank with initial lead and lift as per SS20B & Sl 62 Single Rate | 4.05 | Cum | 266.47 ₹1,079.20 | 263.67 ₹1,067.86 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 57.75 | Cum | 5,904.14 ₹3.4 L | 5,842.19 ₹3.4 L |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 38.5 | Cum | 6,935.61 ₹2.7 L | 6,862.83 ₹2.6 L |
| 9.00 | Rough Stone Dry Packing for Revetment Works | 114.45 | Cum | 2,202.32 ₹2.5 L | 2,179.21 ₹2.5 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,79,124 ₹3.8 L | 3,75,136 ₹3.8 L |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
29 Jan 2026, 3:00 pmClosed
Block Development Officer
BDO office Uthangarai
Krishnagiri District Uthangarai Block Under Mines and Minerals - 2025- 2026 Formation of New Diversion Channel and Improvemnts of Existing Channel for River Diversion Work from Kadaparai River to Puliyanur PWDTank Singarapettai Panchayat Package No48
2026_RDTN_647446_1
Roc_71_2024_A4_07.01.2026
Open Tender
Civil Works - Canal
180 days
Uthangarai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
BDO office Uthangarai
10 Mar 2026
27 Jan 2026
29 Jan 2026
27 Jan 2026
29 Jan 2026
27 Jan 2026
28 Jan 2026
1.Formation of New Diversion Channel and Improvements of Existing Channel For River Diversion Work From Kadaparai River to Puliyanur PWD Tank H/o Singarapettai Estimate Amount : Rs.25.00Lakhs
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth Work Excavation and deposting on bank with initial lead and lift as per SS20B & Sl 62 Single Rate
Earth Work Excavation for Foundation in Medium rock and dense Medium required Blasting
Earth Work Excavation and deposting on bank with initial lead and lift as per SS20B & Sl 62 Single Rate
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Rough Stone Dry Packing for Revetment Works
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.62 MB
pb48.pdf
Tender Documents • 0.60 MB
tb48.pdf
Tender Documents • 0.83 MB
BOQ_776230.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid