Loading…
Loading…
Tender Value
₹92.4 L
EMD Value
₹4.6 L
Closing Date
5 Oct 2026, 3:00 pm
Chief Engineer
LDA Gomti Nagar Lucknow
Gomti Nagar Vistar Sector-6 me SSB Building ke pass CC Road evam Nali ka nirman karya
2026_LDAUP_1190233_1
106/ENIVIDIA/CE/2026_11
Open Tender
Civil Works
Percentage
90 days
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secratary LDA
₹4.6 L
26 Sept 2026
26 Sept 2026
6 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge:, All kinds of soilDSR 2023- 2.1.1 | 312.3 | cum | 102.58 | ₹32,035.73 |
| 2 | Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in-chargeDSR 2023- 15.1 | 345 | Cum | 672.65 | ₹2,32,064.25 |
| 3 | Carriage of materials transport including loading unloading and stacking Lime,moorum,building,rubbish,5.0 km sanction Rate- PSR 01 | 45 | cum | 104.4 | ₹4,698 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).DSR 2023- 4.1.2 | 560 | Cum | 6,588.88 | ₹36,89,772.8 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 5.1.2 | 14 | Cum | 7,145.72 | ₹1,00,040.08 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 4.1.3 | 24.09 | Cum | 6,223.65 | ₹1,49,927.73 |
| 7 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level. (SI No. 504) (Sanction Rate)- SI 504 | 1,650 | Kg | 71.5 | ₹1,17,975 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1DSR 2023- 5.9.1 | 102 | Sqm | 309.78 | ₹31,597.56 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand)DSR 2023- 6.1.1 | 187.65 | Cum | 5,822.47 | ₹10,92,586.5 |
| 10 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand)DSR 2023- 13.4.1 | 1,183.2 | Sqm | 282.29 | ₹3,34,005.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
T_2.pdf
Tender Documents • 5.59 MB
BOQ_2243180.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .