| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.5 L+₹5.2 L (9.80%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹68.2 L+₹14.9 L (28.1%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹69.7 L
EMD Value
₹1.4 L
Closing Date
5 Mar 2021, 3:00 pmClosed
SE IWC Parayagraj
Office of the SE IWC Parayagraj 9 Saproo Road Civil Lines Prayagraj
Reconstruction of 17 No. of V.R.B.s at offtaking Minors of Belan Main Canal Kharka Minor Km. 2.900 3.393 Barethi Minor Km. 3.800 Baghol Minor Km. 0.705 Imliya Minor Km. 1.690 Kundri Minor Km. 0.800 Dihipatka Minor R Km. 1.300 Thathaha Minor Km. 0.800
2021_UPIDC_559870_3
07/SE/2020-21
Open Tender
Civil Works
Item Wise
90 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.4 L
31 Jan 2023
26 Feb 2021
5 Mar 2021
26 Feb 2021
5 Mar 2021
26 Feb 2021
Amount
Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge
Dismantling of old R.C.C slab including all cost proper disposal , labour and T&P,etc as per direction.of Er-in-charge
Dismantling of old and dameged hume pipe including all cost of labour and T&P etc.
Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge
E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc.
Supply and laying local sand below in foundation C.C. including cost of all materials labour T&P etc
Laying.C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc.
C.R.S. Masonary with 1:3 C.M.including cost of all material labour and T&P etc.
20 mm deep struck cement pointing on stone masonary with 1:2C.M. including cost of all material labours and T&P etc.
Centering & shuttering for C.C & R.C.C. slab including cost of all materials labour T&P etc.
Supply & laying 3mm thick Tar paper on bed Block including cost of all types of labour, material, T& P etc. For proper copmletion of work As per direction of engineer-in charge.
Supply & laying 20mm thick joint filler board in expansion joints of slab etc. including cost of all types of labour, material, T& P etc. For proper copletion of work As per direction of engineer-in charge.
Reinforcement for R.C.C.work including cutting ,bending,binding and placing including cost of all materials ,labour T&P etc.
R.C.C. 1:1.5:3 in slab bridge including cost of all materials labour and T&P etc.but excluding cost of reinforcement.
C.C 1:1.5:3 for wearing coat and coaping of parapet including cost of all materials, labour and T&P etc.
Stone pitching on V.R.B. ramp and approach including cost of all materials,labour and T & P etc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all materials labours T&P etc.
E/W In Embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
M/S NAGENDRA SINGH
m/s VIJAY CONSTRUTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .