Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance AT MOUZA BALTABARI JN NO 88 PO PS BAGDOGRA NAXAIBA DE DARJEELING PIN 734009 | DARJEELING | WEST BENGAL | 734009 | -27.86% | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.5 Cr+₹13.4 L (3.05%)Admitted-Finance | -25.66% | ₹4.5 Cr+₹13.4 L (3.05%) | L2 | Admitted-Finance |
| 3 | L3₹4.8 Cr+₹35.7 L (8.12%)Admitted-Finance | -22.00% | ₹4.8 Cr+₹35.7 L (8.12%) | L3 | Admitted-Finance |
| 4 | L4₹5.2 Cr+₹81.2 L (18.5%)Admitted-Finance | -14.54% | ₹5.2 Cr+₹81.2 L (18.5%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical 11 OLD POST OFFICE STREET IST FLOOR LEFT SIDE KOLKATA 700001 STATE WEST BENGAL | KOLKATA | WEST BENGAL | 700001 | - | - | - | Rejected-Technical Technically Non-Responsive |
Tender Value
₹6.1 Cr
EMD Value
₹30.4 L
Closing Date
14 Nov 2025, 5:00 pmClosed
J S Tung
NHIDCL RO SILIGURI
Performance based Maintenance Contracts (PBMC) work of Asian Highway 02 (Ch. 0.000 to 1.500) from Nepal Border Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India in the state of WB in FY 25-26
2025_NHIDC_879947_1
NHIDCL/Mechi Bridge/PBMC/2025-26
Open Tender
Civil Works
Percentage
1825 days
West Bengal
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹30.4 L
NHIDCL RO Siliguri
25 Feb 2026
2 Oct 2025
17 Nov 2025
2 Oct 2025
14 Nov 2025
16 Oct 2025
2 Oct 2025 - 8 Oct 2025
9 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | BILLNO.1: ROUTINE MAINTENANCE (Lump Sum) [for Total 60 months] | 1 | Nos | 68,74,200 | ₹68,74,200 |
| 1.02 | BILLNO.2: INITIAL RECTIFICATION WORKS (Lump Sum) [To be completed within 06 months
from the notice to proceed] | 1 | Nos | 5,22,956 | ₹5,22,956 |
| 1.03 | BILLNO.3: PERIODICAL MAINTENANCE WORKS
(Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24 months (as the case may be) from the date of notice to proceed]. | 1 | Nos | 4,80,43,957 | ₹4,80,43,957 |
| 1.04 | BILLNO.4: EMERGENCY WORKS (Unit Rates) | 1 | Nos | 11,08,822 | ₹11,08,822 |
| 1.05 | BILLNO.5: STRUCTURE REPAIR (Unit Rates) | - | Nos | 44,35,289 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
RFP.pdf
Tender Documents • 3.26 MB
BOQ_924917.xls
BOQ • 0.31 MB
cori1.pdf
PDF • 1.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .