Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹5,920
Closing Date
28 Sept 2026, 4:00 pm4d left
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Crate bund along side graveyard near house of Aiyaz Ahmad Mir to others near Nai Basti Khopri and Protection bund from Masjid Sharief to Shoib Ahmad Mir at Khopri Panchayat Dawar B Block Gurez 2nd call
2026_PWDJK_325378_14
(REW) E-NIT No-23 of 2026-27 EE-RnB-Grz-6845-54 E-tendering Dated-19-09-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Gurez
₹5,920
Executive Engineer RnB Division Gurez
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 33.53 | Cum | 479.3 | ₹16,070.93 |
| 2 | Providing and laying of dry stone soiling hand packed tightly including carriage complete job. | 8.75 | Cum | 1,200 | ₹10,500 |
| 3 | Supply and laying hand packed of boulders filling(dry hand packed tightly)including cost of stones but excluding cost of wire crates. | 36.98 | Cum | 1,279.75 | ₹47,325.16 |
| 4 | Cost of crates of size 100mmx100mm including all carriage complete job upto saw mesh dia 4mm black annealed incl.cost and carriage.G.I Wire. | 142.75 | Sqm | 255 | ₹36,401.51 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 23.2 | Cum | 6,591.25 | ₹1,52,917 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 39 | Sqm | 286.35 | ₹11,167.65 |
| 7 | Carriage of Material Sand,Agg/Nallah boulders by MT avg.lead 10km. | 69.76 | Cum | 279.04 | ₹19,465.83 |
| 8 | Add provision for Citizen Information board & Photograph . | 1 | Job | 2,500 | ₹2,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1099222.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .