Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | -34.90% | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.7 L+₹1.2 L (26.0%)Admitted-Fee/PreQual/Technical/Finance | -17.99% | ₹5.7 L+₹1.2 L (26.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
14 Sept 2026, 4:00 pmClosed
Executive Engineer PD 3rd Sgr
Executive Engineer PD 3rd Sgr
Construction of Gaziboo at G-3 Gupkar Srinagar.
2026_PWDJK_322189_2
e-NIT No. 14-P of 08/2026 Dated -24- 08-2026
Open Tender
Civil Works
Percentage
30 days
Executive Engineer PD 3rd Sgr
AS per NIT
2 documents required · 2 mandatory
₹300
Executive Engineer PD 3rd Sgr
₹14,000
18 Sept 2026
25 Aug 2026
15 Sept 2026
25 Aug 2026
14 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means intrenches for foundations,drains,pipes,cables etc. (notexceeding 1.5m in width) and for shafts, wells,cesspits and the like not exceeding 10sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil Rate for a lead upto 50 meter from cutting edge | 5.66 | Cum | 673.3 | ₹3,810.88 |
| 2 | Providing and laying dry stone soling in the Trenches/ fields duly hand packed in level including ramming with iron rammers for foundation including all carriages up to 15 kms, Loading and unloading. | 0.93 | Cum | 950 | ₹883.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1cement :4coarsesand: 8graded stone aggregate40mm nominal size) | 0.93 | Cum | 5,202.9 | ₹4,838.7 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggre gate 20 mm nominal size) | 5.66 | Cum | 6,591.25 | ₹37,306.48 |
| 5Carriage of material by mechanical transport from source up to site of work. | |||||
| 5.01 | Sand / Stone aggregate for an avg lead of 15 Km. | 8.91 | Cum | 344.49 | ₹3,069.41 |
| 6 | 20 mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1cement:4 fine sand) | 11.15 | Sqm | 459.4 | ₹5,122.31 |
| 7 | Centering and shuttering including strutting ,propping etc.and removal of form for:Foundations, footings, bases of columnsetc.for mass concrete. | 11.15 | Sqm | 286.35 | ₹3,192.8 |
| 8 | Providing hoisting and fixing trusses/purlins/rafters/ posts/post plates or like components including cost ofscrews etc. complete: FirstclassBudloo/Firwood | 1.69 | Cum | 1,26,976.45 | ₹2,14,590.2 |
| 9 | Providing and fixing 0.5mm thick pre-color coated high rib iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 15.71 | Sqm | 1,200 | ₹18,852 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1078557.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .